0% found this document useful (0 votes)
326 views

Method Statement Partition Works

This document provides a method statement for drywall installation. It outlines general requirements, submission documents needed, delivery and storage instructions, site conditions, required products, and a detailed installation guide. The installation guide specifies how to install metal wall framing, cut and connect studs, handle partitions above ceilings, and apply three coats of joint compound to joints and fastener heads.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
326 views

Method Statement Partition Works

This document provides a method statement for drywall installation. It outlines general requirements, submission documents needed, delivery and storage instructions, site conditions, required products, and a detailed installation guide. The installation guide specifies how to install metal wall framing, cut and connect studs, handle partitions above ceilings, and apply three coats of joint compound to joints and fastener heads.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Method Statement for Drywall Work

1 GENERAL REQUIREMENTS

1.1 The installer shall supply and install the gypsum/calcium silicate board in accordance with
specification as shown on the drawings.

2. SUBMISSION DOCUMENTS

2.1 Technical Data: technical data, test certificates, installation instructions and valid
Bomba’s certificates for fire rated assemblies for approval prior to commencement of
work will be provided by manufacturer.

3. DELIVERY, STORAGE AND HANDLING

3.1 Coordinate deliveries to comply with Construction Schedule and arrange for off-the
ground storage. Do not load any area beyond the safe design load limits.

3.2 Do not store product outside. Stack gypsum/calcium silicate boards flat on a smooth,
even, dry surface.

4. SITE CONDITIONS

4.1 Install work only in areas closed and protected against weather. Provide adequate
ventilation and dehumidification to eliminate excessive moisture in the areas of work to
ensure proper drying, setting or curing of the compounds.

4.2 Do not install work in any area unless satisfied that work in place has dried out, and that no
further installation of damp materials is contemplated.

5.0 PRODUCTS

5.1 Gypsum Board of selected thickness (12.5mm, 15mm, 16mm or 19mm) to be used.

5.2 Stud of selected width (49mm, 62mm, 72mm or 92mm) to be used which is determined by
architect in the specification.
5.3 Jointing Compound

5.5 Paper Tape

6.0 INSTALLATION GUIDE

6.1 Install metal wall framing in strict accordance with manufacturer’s instructions.
Determine and mark the wall position and make allowance for openings. Determine and
mark the wall position and make allowance for openings. Fix track channel along centre
line of floor and ceiling at 600mm centers with suitable fixings.

6.2 Cut stud to a neat fit into the height of to the required wall height. Locate the first stud
into track channel, twist into position and fix to the abutting wall at 600mm centres.
Locate next stud at 600mm centres to a friction fit within the track channel sections.

6.3 In splicing the studs due to height requirement, two stud members are boxed with
minimum overlapping of 600mm. In case of designed partition height higher than the
plasterboard length, additional track channel fixed horizontally to support an infill panel
is required.

6.4 Partition above ceiling shall allow for cut out opening service ducts, trunk and cable trays.
The contractor shall coordinate with all subcontractors on the exact location and size of
the openings. Any gaps around any pipe ducts through the partition shall be properly
sealed with proprietary fire smoke stop system: by the penetration collar protection
specialist.

6.5 If full height partition had to be terminated below ventilation duct route parallel to the
partitions, the stud of the partition shall be secured to the support frame of the duct. In
such cases, space between the duct and reinforced concrete soffit need not be sealed up

7.0 JOINTING

Reinforce all interior and exterior corner/angle and panel joints for wall surface with
paper tape embedded in and finished with jointing compound.

7.1 First Coat

1) Using a trowel, apply compound to the plasterboard recessed joint formed by the
recessed edge of the board. The compound should be applied 3mm-5mm thick to help
with tape bonding.
2) Centre the paper tape along the joint
3) Leave sufficient compound under the tape to achieve a good bond.
4) Immediately apply a thin coat of compound over the tape. This reduces the possibility of
the tape edge curling or wrinkling which could lead to cracking.
5) Cover all fastener heads and allow first coat to set/dry. Leave all joint and fastener
heads with a smooth finish and feathered edges.

7.2 Second Coat

1) When the first coat has set/dried scrape back any build up of compound. Apply a second
coat of compound using a trowel. The second coat should be finished as flush as possible
to the board face.
2) Using a trowel, cover fastener heads with a second coat approximately 25mm wider then
the first coat.
3) Allow to set/dry.

7.3 Third Coat

1) When the second coat has set/dried, scrape back any build up of compound along the
joint, to give a smooth and level surface.
2) Apply a finishing coat with a trowel to a width of approximately 275mm. A wet sponge
may be used on the joint edges to help achieve a smooth finish.
3) Apply a finishing coat to fastener heads approximately 25mm wider then the second
coat.
4) Allow to set/dry completely.