SR. NO.: Equipment List
SR. NO.: Equipment List
SR. NO.: Equipment List
NO.
001P2 1A/B
1C
001P2 2
001P3 3
001P3 4
001P3 5
001P3 6
001P4 7
001P17 8
001P4 9
001P4 10
001P5 11
001P5 12
001P7 & P8 13
001P7 & P8 14
001P9 15
001P6 16
001P9 17
001P9 18
001P10 19
001P10 20
001P11 & P12 21
001P11 & P12 22
001P11 & P12 23
001P13 24
001P13 25
001P14 26
001P14 27
001P15 & P16 28
001P15 & P16 29
001P17 30
001P17 31
001P17 32
001P18 33
001P18 34
Chemical Area 001P20 35
001P20 36
001P20 37
001P19 38
001P19 39
001P18 40
001P18 41
001P21 42
001P21 43
001P21 44
001P22 45
001P22 46
001P22 47
001P28 48
001P28 49
001P28 50
001P24 51
001P24 52
001P24 53
001P30 54
001P30 55
001P30 56
001P30 57
001P30 58
001P30 59
001P31 60
001P31 61
001P31 62
001P25 63
001P25 64
001P25 65
001P29 66
001P29 67
001P29 68
001P26 69
001P26 70
001P27 71
001P23 72
001P23 73
001P23 74
001P23 75
001P25 76
001P26 77
001P27 78
79
80
81
82
83
001P26 84
001P18 85
001P19 86
001P32 91
92
93
94
95
96
97
EQUIPMENT LIST
DESCRIPTION
Air Compressor
Transformer
MCC & Control room
Lime & Soda Ash Storage
Chemical Storage
DELETED
Wet Pressurization Systeam
EQUIPMENT LIST
SIZE TAG # CAPCITY
5.5mL x 4.0mW --
NOT TO EXCEED
QTY. OLD CAPCITY
LOAD DATA (KGS)
2 Nos.(2W +0S) 1250 m3
1 No.(1W + 0S)
2 Nos.(1 W +1S) 1000 155 m3/hr
1 No.(1W + 0S) 3 m3
1 No.(1W + 0S) 500 --
1 No.(1W + 0S) --
1 No.(1W + 0S) 15000 --
1 No.(1W + 0S) 80 m3
2 Nos.(1 W +1 S) 1000 9 m3/hr
2 Nos.(1 W +1S) 750 30 m3/hr
1 Nos.(1W + 0S) 25000 -
1 No.(1 W + 0 S) 145 m3
3 Nos.(2 W +1 S) 1000 83 m3/hr
2 Nos.(2 W + 0 S) 1000 83 m3/hr
2 Nos.(2 W +0S) 4000 -
2 Nos.(1 W +1 S) 750 60 m3/hr
3 Nos.(2 W + 1 S) 2000 178 m3/hr
1 No.(1W + 0S) 145 m3
2 Nos.(1 W + 1 S) 1000 136 m3/hr
2 Nos.(1 W + 1 S) 1000 136 m3/hr
3 Nos.(2 W +1S) 2000 68 m3/hr
2 Nos.(2W +0S) 1000 ~34 m3/hr
2 Nos.(2W +0S) 1000 --
2 Nos.(2W +0S) 5000 --
1 No.(1W + 0S) 15000 12 m3
2 Nos.(1 W +1S) 1000 23 m3/hr
2 Nos.(1 W +1 S) 1000 23 m3/hr
2 Nos.(1 W +1 S) 2000 23 m3/hr
2 Nos.(1 W +1S) 1000 --
2 Nos.(1W +1S) 2000 --
1 No.(1W + 0S) 220 m3
1 No.(1W + 0S) 3000 9 m3/hr
2 Nos.(1W +1S) 500 215 m3/hr
1 No.(1W + 0S) 265 m3
2 Nos.(1W +1S) 1000 132 m3/hr
1 No.(1W + 0S) 4000 3 m3
1 No.(1W + 0S) 1000 72 m3/hr
2 Nos.(1W +1S) 750 72 m3/hr
1 No.(1W + 0S) 10 m3
2 Nos.(1W +1S) 750 10 m3/hr
1 No.(1 W + 0S) 50 m3
2 Nos.(1 W +1 S) 750 15 m3/hr
2 Nos.(1 W +1 S) 8 m3
2 Nos.(1 W +1 S) 500 8 m3
2 Nos.(1 W +1S) 750 1.5 m3/hr
2 Nos.(1W +1S) 35 m3
2 Nos.(1 W +1 S) 500 35 m3
2 Nos.(1 W +1 S) 5 m3/hr
2 Nos.(1 W +1 S) 1500 1.0 m3
2 Nos.(1 W +1 S) 500 1.0 m3
2 Nos.(1 W +1 S) 250 100 LPH
2 Nos.(1 W +1 S) 150 1.0 m3
2 Nos.(1 W +1 S) 500 1.0 m3
2 Nos.(1 W +1S) 250 55 LPH
1 No.(1 W + 0 S) 300 0.1 m3
1 No.(1W + 0S) 500 0.1 m3
2 Nos.(1 W +1 S) 250 -
1 No.(1 W + 0 S) 300 0.1 m3
1 No.(1 W + 0 S) 500 0.1 m3
2 Nos.(1 W +1 S) 250 -
1 No.(1 W + 0 S) 300 0.1 m3
1 No.(1 W + 0 S) 500 0.1 m3
2 Nos.(1 W +1 S) 250 -
1 No.(1W + 0S) 8000 7 m3
2 Nos.(1W +1S) 750 5 m3/hr
2 Nos.(1W +1S) 250 10 LPH
2 Nos.(1W +1 S) 6000 5 m3
2 Nos.(1 W +1 S) 500 5 m3
2 Nos.(1 W +1 S) 250 -
1 No.(1 W + 0S) 2000 1.0 m3
2 Nos.(1W +1S) 250 5 LPH
2 Nos.(1W +1S) 250 2.5 LPH
1 No.(1 W + 0 S) 500 1 m3
1 No.(1 W + 0 S) 2000 1 m3
2 Nos.(1 W +1 S) 250 10 LPH
2 Nos.(1 W +1 S) 250 10 LPH
2 Nos.(1W +1S) 250 150 LPH
2 Nos.(1 W +1 S) 250 150 LPH
2 Nos.(1 W +1 S) 250 10 LPH
2 Nos.(1 W +1 S) 250 --
1 No.(1 W + 0 S) 500 --
2 Nos.(1 W +1 S) 250 --
1 No.(1 W + 0 S) 500 --
2 Nos.(1 W +1 S) 250 --
1 No. 500
1 No.(1 W + 0 S) 1000
1 No.(1 W + 0 S) 1000
1 No. 2000
2 Nos.
1 No.
1 No.
1 No.
1 No.
ZLD AREA EQUIPMENT LIST
Sr. No. TAG # Description
101 PHX2001 Crystallizer Feed Preheater
102 HE2001 Crystallizer Forced Circulation Heat Exchanger
103 G2002 Crystallizer Recirculation Pump
104 CDT2002 Crystallizer Distillate Tank
105 G2001A/B Crystallizer Distillate Pump
106 CFT2003 Crystallizer Flash Tank
107 CRS2001 Crystallizer Foam Separator
108 CMP2001A Crystallizer Vapor Compressor (A) Skid
109 CMP2001B Crystallizer Vapor Compressor (B) Skid
110 CN2001 Crystallizer Centrifuge
111 CCT2007 Crystallizer Centrate Tank
112 G2004 Crystallizer Centrate Pump
113 CAS2008 Crystallizer Area Sump – RCC Lined
114 G2006 Crystallizer Area Sump Pump
EQUIPMENT LIST
Quantity Not to exceed
Size / Capacity
(Nos,) load data (kgs)
- 1 1000
- 1 15000
- 1 8000
- 1 1600
- 2 1000
- 1 40000
- 1 5000
- 1 9000
- 1 9000
- 1 6000
- 1 6000
- 1 1000
9.7mL X 3.5mW X 2.5mD 1 -
- 1 1000
21-Feb-20
13-Mar-20
17-Mar-20
19-Mar-20
12-Dec-19
Hold Point
Cut out of mixer for Lime tank & soda tank Pending in civil drawing
pump cut sheet recevied for 10 nos. pump
Turbocharger size GAD dwg updation
anti, coagulant & sbs pump mountinf on tank frame
rcc drawing updation and then eqpt ga dwg updatation
Filter press cut sheet will check
001C1
001C3
SR.
NO.
1
11
17
33
40
85
EQUIPMENT LIST
DESCRIPTION
12-Apr-20
Nozzle Orientation Issue
003TD1
003TD2
061TD1
142TD1
4
143TD1
1
2
143TD2
1
2
Pending Activities
1
2
3
4
Dwg #
Dwg #
1
2
3
4
Kulkarni abhishek
Kulkarni abhishek
dipali roy
sajan
sajan chadhari
Nozzle Orientation Issue
OK
OK
OK
Problem
Dry breather assembly which is shown on the tank in P & ID, Do I consider as it is in P & ID or at operating level,
Do we put outlet Nozzle Elevation for HOLD in tank drawing, because we not recive dosing pump final drawing,
P & ID two outlet nozzle are shown, but in tank drawing only on shown,
Problem
Where do we put, Vent Nozzle ? On the top tank or at tank shell,
Service inlet Nozzle is shown on top in P & ID, But in tank drawing it is shown at the shell side ?
Problem
Where do we put, Vent Nozzle ? On the top tank or at tank shell,
What is the qty. of Outlet Nozzle 2 or 3 Nos.
Pending Activities
acid dosing skid sequence updation
70/71/78 & 77 Separate for UF CEB Dosing Skid
Priming Chamber 'PC_1001 >> size change Update pending in Eqpt GA/RCC Civil Drawing
Priming Chamber 'PC_1002 >> size change Update pending in Eqpt GA/RCC Civil Drawing
Acid (H2SO4) dosing tank, missing outlet nozzle 1 1/2" for UF CEB Service
Path
D:\KGK\D Drive Backup\Kulbhushan Kharag\KHARAG\KGK\Deepak\Personnel
D:\KGK\D Drive Backup\Kulbhushan Kharag\KHARAG\KGK\Deepak\Personnel
Path
D:\AE-1067\Mechanical\L D\T D
D:\AE-1067\Mechanical\L D\C\RCC drawing
D:\AE-1067\Mechanical\L D\C\RCC drawing
D:\AE-1067\Mechanical\L D\C\RCC drawing
RO-I reject water tank-I, nozzle size shall be updated from 6" to 4"
total dosing pump 17 nos. item # 68 polymer dosing pump for dewatering unit missing
booster pump -II, anchoring detail missing, hole, c/c
TIE Point
cable tray rought
mixer drawing & frp tank drawing mixer support arrangement
AE-1067-RCC drawings 001C3 - 02
001C3 Updation pending
Priming Chamber elevation will be hold remove
item # 8 FC Feed Pump plinth height TOC 218 mm elevation + 25mm grouting
Item # 30 RO-II reject water tank nozzle size, cutout, location check recircualtion nozzle will be add
item # 24 RO-I reject water tank toc height issue, outlet nozzle elevation
item # 25 RO-II feed pump plinth height TOC 410 mm elevation + 25mm grouting
item # 37 RO Cleaning Pump for RO-I & RO-II unit plinth height Issue
dosing pump toc will be change 300 mm + 25mm grouting
ro cip tank & RO-II FEED PUMP outlet elevation increase 50 mm because flange clash with concreate
Check
Check
Check
Please advice ?
Please advice ?
Please advice ?
Description
Personnel Document-2020
Working Hours is Self 2020
Description
Nozzle Orientation Plan
AE-1067-DW-MD-001C1-P_With Pump
Worksheet in AE-1067-DW-MD-001C1-P
Puddle Nozzle For C1
customer submission