Revised Academic Schedule 2019-20 1591684669

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

INDIRA GANDHI INSTITUTE OF TECHNOLOGY, SARANG

REVISED ACADEMIC SCHEDULE 2019-20


IGIT/A&E/ 1562 Date: 09th June 2020
Sl. Date Description
No.
1 12/06/2020 Submission of names of external examiners (preferably from other Department of the Institute) by
the HODs to the Director for conduct of Project Viva and Grand Viva of final semester B. Tech. and
B. Arch.
2 12/06/2020 Submission of names of external examiners (preferably from other Department of the Institute) by
the HODs to the Director for conduct of Project Viva / Grand Viva of final semester M. Tech., M.Sc.
and M.C.A.
3 16/06/2020 Submission of soft copy of project report/ thesis by final semester B.Tech. and B. Arch. students in
the department
4 22/06/2020 Submission of soft copy of project report / thesis by final semester M. Tech., M.Sc. and M.C.A.
students in the department
5 17/06/2020 to Conduct of Project viva and Grand viva of final semester B.Tech. and B. Arch
20/06/2020
6 23/06/2020 to Conduct of Project viva and Grand viva of final semester M. Tech., M.Sc. and M.C.A.
25/06/2020
7 As decided by BPUT Last date for uploading all internal, sessional and practical marks of final semester B.Tech. and B.
Arch.
8 30/06/2020 Last date for uploading all internal, sessional and practical marks of final semester M. Tech., M.Sc.
and M.C.A.
9 04/07/2020 Last date for uploading all internal, sessional and practical marks of all intermediate even semesters
of B.Tech., B. Arch., M. Tech., M.Sc. and M.C.A.
10 To be decided after Conducting the 4th semester M.Sc. Theory Examination (Regular/ Back) 2019-20
declaration of BPUT
schedule
Decided in the HOD Council meeting held on 09th June 2020

You might also like