Marble Slab Processing Plant Project Initial Environmental Examination (Iee) Checklist
Marble Slab Processing Plant Project Initial Environmental Examination (Iee) Checklist
Below is the IEE Checklist for Marble slab processing plant project proponents. Read the
question below before answering the space provided. Uses additional sheets if necessary and
indicate this in the appropriate space.
PROJECT LOCATION:
_____________________________________________________________________________
_____________________________________________________________________________
____
(Complete Address: Street, Barangay and Municipality/City, Project) (attach location / Vicinity map)
Telephone: _____________________________
Fax : _____________________________
Email : _____________________________
A. GENERAL INFORMATION
List of Owners
(for partnership/corporation, list top 5 partners / shareholders with largest holding )
Name / Citizenship Address % Share/ holding
Position
B. PROJECT OBJECTIVES
General:_____________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
_____
Specific:_____________________________________________________________________________
____________________________________________________________________________________
___
____________________________________________________________________________________
__
____________________________________________________________________________________
__
____________________________________________________________________________________
__
____________________________________________________________________________________
__
C. PROJECT DESCRIPTION
1.) Land Ownership (attach photocopies of documents in the space provided and survey plan as
ANNEX 2) ;
Residential
Commercial
Industrial
Light
Heavy
Institutional
Built-up
Agricultural
Conversion Approved by DAR Yes No
Forest Land
b. Production Capacity
7. List of Equipment/Facilities (Attach detailed plans equipment layout, photos of machinery and
utilities)
Age
Vulnerable groups
Elderly
Handicapped
3-18% (rolling)
18-30% (moderately steep)
30-50%(steeply mountainous)
Above 50% (very steeply mountainous)
Forest Is the project site located near or within a forest
Reserve/Watershed reserve/watershed/protected area?
If yes, how near?_____________meter
Cave Are there caves, limestone caverns or sinkholes at the project
site? If yes, describe features under Annex 8
Coastal Is the project site located along coastal area/tidal zone? If yes,
how near ? _________________m.
Geology Is the area prone from soil erosion? If yes, status?
Slight
Moderate
Severe
Hydrology Are there natural drainage ways /creeks within the area draining
towards communities downstream?
Air Quality What is the quality of air? ____ Poor _____ Fair ____ Good
Are there other industries, facilities or undertakings existing in
the vicinity of the area?
If yes, Identify __________________, distance _______ m.
How deep is the water table during the dry season? (meter)
How deep is the water table during the wet season?(meter)
What is the quality of water?
Fresh
Brackish
Saline/Salty
Wildlife Have you observed any wildlife in the area? If yes, Please
identify and enumerate:
1.
2.
3.
4.
5.
Marine/Aquatic Are there existing marine and aquatic habitat that will be
Resources affected by the project.
If yes, please identify
1.
2.
3.
4.
5.
6.
E. PROJECT IMPACT
(Note: Describe and attached all pertinent details of proposed mitigating and enhancement
measure corresponding to the identified environmental impacts of the proponent in Chapter F,
Item # 6)
Burning :
Composting:
Volume per composting: ________________________________ cu. m.
Frequency of composting : __________________________________/week
Landfill :
Volume per burial : ___________________________________cu. m.
Frequency of burial : ________________________________/week
H. PROPONENT’S COMMITMENTS
I. ATTACHMENTS
Attached?
Letter of Application
Location/ Vicinity Map
SEC Registration and Article of Incorporation Annex 1
Photocopy of TCT/OCT/TD Annex 2
Survey Plan Annex 2
Locational Clearance Annex 3
Process Flow Schematic Diagram Annex 4
Site Development Plan Annex 5
Schedule of Project Implementation Annex 6
NWRB/Water Permit Annex 7
Other details/feature Annex 8
Abandoning Plan Annex 9
Wastewater Treatment Scheme Annex 10
Others
Attached
Endorsement from Local Government Units
Concerned
Barangay
Municipality
NWRB Permit / Local Water District Annex # 7
Others
ACCOUNTABILITY STATEMENT
This is to certify that all the information and commitments in the Initial Environmental
Examination (IEE) Report are true, accurate and complete. Should I/we learn if any information
which would make the IEE inaccurate, I/we shall bring said information to attention of the
Environmental Management Bureau of DENR Regional Office.
_________________________________________________
Project Proponent
_________________________________________________
Title/Designation
_________________________________________________
Date
ACKNOWLEDGMENT
Witness my hand and seal on the place and date above written.
____________________________
Notary Public
Doc. No.___________________
Page No.__________________
Book No.__________________
Series of __________________