SELF ASSESSMENT GUIDE

Qualification: ELECTRICAL INSTALLATION AND MAINTENANCE NC II


Performing roughing-in activities, wiring and cabling works for
Units of single-phase distribution, power, lighting and auxiliary systems
Competency Install Electrical Protective devices for distribution, power,
covered: lighting, auxiliary, lightning protection and grounding system
Install Wiring Devices of Floor and Wall Mounted Outlet Lighting
Fixture/Switches and Auxiliary Outlets
Instruction:
 Read each of the questions in the left-hand column of the chart.
 Place a check in the appropriate box opposite each question to indicate your answer.
Can I? YES NO
Performing roughing-in activities, wiring and cabling works for single-phase
distribution, power, lighting and auxiliary systems
 Communicate and confirm instructions for the preparation
of work activity to ensure clear understanding*
 Interpret electrical plan and detailed drawing*
 Identify and check to ensure that tools, equipment and
personnel protective equipment needed to electrical system*
 Identify and check auxiliary equipment, if it works correctly and
are safe to use in accordance with established procedures*
 Use safety harness or PPE properly*
 Bend and install type of conduit and cable tray as per
job requirement.*
 Perform correct procedures for installation of electrical
auxiliary system in line with job requirements*
 Ensure work is completed in an agreed scheduled time
in accordance with the quality standard.*
 Respond to unplanned events or conditions accordingly*

 Install conduit and fittings in accordance with standard *

 Perform installation qualification (IQ) activities*

 Perform operational qualification (OQ) activities*

ELCEIM215-0917 1
Electrical Installation and Maintenance NC II
Install Electrical Protective devices for distribution, power, lighting,
auxiliary, lightning protection and grounding system
 Communicate and confirm instructions for the preparation of
work activity to ensure clear understanding*
 Interpret electrical plans and detailed drawing*
 Identify and check to ensure that tools, equipment and PPE
needed to electrical system and by auxiliary equipment
works correctly and are safe to use in accordance with
established procedures*
 Follow safety procedures and the use of safety harness*
 Perform correct procedures for the installation/mounting
configuration of electrical protective devices and
grounding system*
 Respond to unplanned events or conditions accordingly*
 Select the types of lighting fixture and auxiliary outlet for the
installation*
 Undertake ongoing checks of quality of work in accordance
with instructions and requirements*
 Terminate/Splice conductors/wires in accordance with the
existing electrical standards*
 Perform final checks to ensure that work conforms to
instructions and drawing/diagram. *
 Perform the installation economically*
 Perform commissioning activities*
Install Wiring Devices of Floor and Wall Mounted Outlet Lighting
Fixture/Switches and Auxiliary Outlets
 Read and interpret drawings in accordance with job requirements*
 Set the lay-out and dimension of electrical drawing or
wiring diagram. *
 Select and identify correct rating, quantity, sizes and type of
wiring devices, switches, lighting fixture and convenience outlet*
 Identify the specifications of materials, tools and equipment
 Fill up properly requisition forms according to list of materials,
tools and equipment
 Follow safety procedures according to enterprise and government
regulations and select the correct PPE in line with safety
requirements*
 Identify defective and/or substandard electrical materials
and report to immediate supervisor*
 Lay out, mount and install electrical components, wiring materials
such as conduit and fittings in accordance with standards*
 Install wiring protective devices and grounding system properly*

ELCEIM215-0917 2
Electrical Installation and Maintenance NC II
 Install the different types of lighting fixtures/switches as per
wiring diagram*
 Follow work schedule to ensure job is completed on time
in accordance to a quality standard and minimum wastage
 Seek further instructions from immediate supervisor in case
of unplanned events or conditions occurring*
 Undertake with strict compliance ongoing checks of quality of
the work in accordance with instructions and requirements
 Perform the installation economically*
 Perform commissioning activities*
I agree to undertake assessment in the knowledge that information gathered will only be
used for professional development purposes and can only be accessed by concerned
assessment personnel and my manager/supervisor.

Date:

Candidate’s Name & Signature


yEvaluated by:
Qualified for Assessment
Not yet Qualified for Assessment
AC Manager

Date:

ELCEIM215-0917 3
Electrical Installation and Maintenance NC II

You might also like