Ramesh Kaka Na Plot Nu Nala Nu Kam: S.R.NO Description

1. The document appears to be a construction estimate for work related to a nala (drain) including excavation, concrete work, reinforcement steel, plastering and centering. 2. It provides details of quantities of materials and labor required for different line items including excavation volume of 23.4 cubic meters, 9.68 cubic meters of RCC work, 281.51 kg of steel and 108 square meters of plastering work. 3. The abstract sheet estimates a total cost of Rs. 112,062.85 for the nala construction work based on the quantities and rates provided.

Uploaded by

sagar khatri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views3 pages

Ramesh Kaka Na Plot Nu Nala Nu Kam: S.R.NO Description

1. The document appears to be a construction estimate for work related to a nala (drain) including excavation, concrete work, reinforcement steel, plastering and centering. 2. It provides details of quantities of materials and labor required for different line items including excavation volume of 23.4 cubic meters, 9.68 cubic meters of RCC work, 281.51 kg of steel and 108 square meters of plastering work. 3. The abstract sheet estimates a total cost of Rs. 112,062.85 for the nala construction work based on the quantities and rates provided.

Uploaded by

sagar khatri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Ramesh Kaka na Plot nu nala nu kam

BBS
S.R.NO DESCRIPTION NO. NO. NO. LENGTH 8 mm
1 0.17 C/C long Span Jali 1 2 5 5.7 57
2 0.20 C/C Short Span Jali 1 2 26 1.1 57.2
3 Pardi Main-Steel 1 2 52 2.1 218.4
4 Pardi Long Span Steel 1 2 14 5.5 154
7 Slab Steel Long Span 1 2 14 5.5 154
8 Bottom Steel Short Span 1 1 26 2.8 84
9 Top Steel Short Span 1 1 26 2.8 72.8
Total 797.4
Total Weight 281.51
Plaster Work upto Plint level in Shed
SR NO. DESCRIPTION NO. NO. LENGTH WIDTH HEIGHT QUANTITY Total Qty
1 Nala Excavation 2 6 1.3 1.5 23.4 23.4

2 Nala P.C.C 2 6 1.1 0.1 1.32 1.32

3 Foundation R.C.C 2 5.8 1 0.23 2.67


R.C.C Pardi 2 5.6 1.25 0.23 3.22
Old Drain R.C.C Pardi 2 5.6 0.35 0.15 0.59
R.C.C Slab 1 5.6 2.86 0.2 3.20 9.68

4 Plaster G.L To Plinth 2 30 1.2 72


2 15 1.2 36 108

5 Centering For Nala


R.C.C Pardi 2 2 1.25 5.6 28
Old Nala Pardi 2 2 0.35 5.6 7.84
Slab 1 2.8 5.6 15.68 51.52
Abstract Sheet
SR NO. DESCRIPTION UNIT QTY RATE AMOUNT
1 Nala Excavation CUM 23.4 175 4095.0
2 Nala P.C.C CUM 1.32 4000 5280.0
3 Nala R.C.C All CUM 9.68 5500 53240.0
4 Centering Nala SMT 51.52 240 12364.8
5 Steel Nala KG 281.51 55 15483.1
6 Plaster G.L TO Plinth SMT 108 200 21600.0
Total 112062.85