0% found this document useful (0 votes)
26 views2 pages

A. Notification Steps

The document provides instructions for various SAP notification, display, and request functions: A) outlines steps to create a notification, B) explains how to display outstanding, in progress, or completed notifications by status, type, date, and user, C) describes displaying PM orders with similar search options, D) lists steps to request materials from stores and get a reservation number, and E) provides the code to create a service purchase requisition and note the number.

Uploaded by

Zegera Mgendi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

A. Notification Steps

The document provides instructions for various SAP notification, display, and request functions: A) outlines steps to create a notification, B) explains how to display outstanding, in progress, or completed notifications by status, type, date, and user, C) describes displaying PM orders with similar search options, D) lists steps to request materials from stores and get a reservation number, and E) provides the code to create a service purchase requisition and note the number.

Uploaded by

Zegera Mgendi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 2

A.

NOTIFICATION STEPS
1 IH01
2 Choose plant no, tick all the sub-function and execute
3 Select the drive section and the equipment
4 IW21and enter
5 Select notification type..i.e. M1 and enter twice
6 Input your observation
7 Click the green flag once
8 Save and copy the notification no.
Pls note:
Clicking the green flag twice will close the notification and it becomes un-editable

B. DISPLAY NOTIFICATION
1 IW28 OR IW29
2 Select Notification status i.e. outstanding/in progress/completed
3 Select the notification type – M1/M3
4 Select the notification date i.e from when to when
5 Select Reported by, Planning plant (i.e. plant no, Planner group (or fill as may be required)
6 Then execute
7 Export to excel or word as may be required and save

C. DISPLAY PM ORDERS
1 IW39
2 Select order status i.e. outstanding/in progress/completed
3 Select the order type –PM01/PM02/PM03/PM04 ,,,,,,
4 Select the order date i.e from when to when
5 Select Reported by, Planning plant(i.e. plant no, Planner group (or fill as may be required)
6 Then execute
7 Export to excel or word as may be required and save

D. MATERIALS REQUEST (RESERVATION) FROM STORES


1 Tcode to use : mb21
2 Movement type – 201
3 Cost center for methods – OPS001
4 Put the material code and the quantity then save and note down the reservation number generated
E. SERVICE PR CREATION
1. Tcode : ME51N
2. Select ZSER
3. Save and note the service PR No

You might also like