Department of Electronics and Communication Engineering: Siruganur, Tiruchirappalli - 621 105
Department of Electronics and Communication Engineering: Siruganur, Tiruchirappalli - 621 105
analysed.
Methodology of Methodology of Moderate study of Methodology of
Implementation implementation is well implementation. Steps are Implementation is not
(25) defined and steps to be mentioned but unclear; defined.
followed to solve the
defined problem are
clearly specified
Presentation (25) Contents of presentations Contents of presentation Contents of the
are appropriate and well are average and delivered Presentation are not
delivered with clear with unclear voice and appropriate.
voice, good spoken Confidence level not high. Poor delivery of
language and confidence. presentation with lack of
confidence.
First Review
Results- Results obtained are good Results obtained are in Results are poor & cannot
Experimental Model & inacceptable level satisfactory level be acceptable
/ Simulation (30) (25-30) (15-24)
Conclusi Results are Conclusi Results are Results Conclusi Results are Results Conclusi Results are
Results are Results are Results Results are Results Results Results Results are Results Results
Results Results are Results are not on and are not on and presented in Results are not on and
not on and presented presented in presented in presented in presented are presented in presented in
in presented in presented are presented presented presented presented are presented
presented are presented Discussi very Discussi very good manner presented Discussi very
presented presented good manner not much are not much are not properly good manner not much are
Discussi very good not properly on on appropriate Project not properly on
manner not much appropriate Project work work satisfactory much appropriate Project work
are not properly on satisfactory much Project Project work manner satisfactory much Project
appropriate Project work manner summary and summary and Project work work manner summary
work satisfactory Project work satisfactory satisfactory is not Project and Project work
much Project work is not Project work is work is conclusion summary satisfactory is not Project
manner summary conclusion summary and and Project summarized work is conclusion
and Project work Project summarized well well not very conclusion not summary and Project
M.A.M. COLLEGE OF ENGINEERING AND
TECHNOLOGY
Siruganur, Tiruchirappalli – 621 105.
Department of Electronics and Communication Engineering
satisfactory is not not very conclusion not work and concluded summarized well not very
Project work is work and concluded summarized appropriate conclusion not work and
conclusion summary summarized appropriate very summary Future and concluded summarized
and Project very summary Future and concluded Future appropriate very summary
summarized well not concluded Future appropriate and extensions Future and concluded
very conclusion not appropriate and extensions in Future extensions in Future appropriate and
work and concluded in Future extensions in Future conclusion the extensions in Future
summarized Future conclusion the project extensions in the extensions in Future
appropriate very project extensions in the project extensions in not conclusion the project
summary Future project extensions in not very are not the project are extensions in the project
and concluded very are not the project are are specified the project are extensions in not very are
Future appropriate are specified the project appropriate specified well not the project are are
and extensions in are appropriate specified specified specified Future specified the project are
Future extensions well specified specified extensions in the project are appropriate specified well
in Future conclusion Future extensions in the not specified specified specified Future
the project project are not specified extensions in the project
extensions in the are not specified
project extensions in
not very are not the
project are are
specified the project
are appropriate
specified well
specified specified
Future extensions
in the project are not
specified
Project –Rubrics