0% found this document useful (0 votes)
395 views4 pages

Project Evaluation Form

This document contains 3 project evaluation forms from the Department of Electronics and Communication Engineering at M.A.M. College of Engineering and Technology. The forms provide rubrics to evaluate a student's project at the zeroth, first, and subsequent reviews. They include spaces for the student and project details, assessment criteria and scores, completion status, comments, and signatures of committee members and reviewers. The purpose of the forms is to assess and provide feedback on the student's project at different stages of development.

Uploaded by

susan william
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
395 views4 pages

Project Evaluation Form

This document contains 3 project evaluation forms from the Department of Electronics and Communication Engineering at M.A.M. College of Engineering and Technology. The forms provide rubrics to evaluate a student's project at the zeroth, first, and subsequent reviews. They include spaces for the student and project details, assessment criteria and scores, completion status, comments, and signatures of committee members and reviewers. The purpose of the forms is to assess and provide feedback on the student's project at different stages of development.

Uploaded by

susan william
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

M.A.M.

COLLEGE OF ENGINEERING AND


TECHNOLOGY
Siruganur, Tiruchirappalli – 621 105.
Department of Electronics and Communication Engineering

DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING


Project Evaluation Form
Zeroth Review

Name of the Student


Register Number
Batch Number Year
Name of the Project Name of the
Coordinator Guide
Committee members
Project Domain Relevance of the
Project
Project Title
Maximum Marks awarded Review Date

Rubrics Max Marks awarded


marks 1 2 3 4
Identification of Problem Domain 25
and Detailed Analysis
Study of the Existing Systems and Feasibility 25
of Project Proposal
Methodology of Implementation 25
Presentation 25
Total 100

Completion Status of the Project :

Overall Comments and Suggestions

Committee member Guide Project Coordinator HOD


M.A.M. COLLEGE OF ENGINEERING AND
TECHNOLOGY
Siruganur, Tiruchirappalli – 621 105.
Department of Electronics and Communication Engineering
DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING
Project Evaluation Form
1st Review

Name of the Student


Register Number
Batch Number Year
Name of the Project Name of the
Coordinator Guide
Committee members
Project Title
Maximum Marks awarded Review Date

Rubrics Max Marks awarded


marks 1 2 3 4
25
25
25

25
Total 100

Completion Status of the Project :

Overall Comments and Suggestions

Committee member Guide Project Coordinator HOD


M.A.M. COLLEGE OF ENGINEERING AND
TECHNOLOGY
Siruganur, Tiruchirappalli – 621 105.
Department of Electronics and Communication Engineering

Review 2 Date :

Comments

Review 3 Date :

Comments
M.A.M. COLLEGE OF ENGINEERING AND
TECHNOLOGY
Siruganur, Tiruchirappalli – 621 105.
Department of Electronics and Communication Engineering

Signature of the Committee members

You might also like