Volume-IIIC Functional Guarantee
Volume-IIIC Functional Guarantee
Volume- IIIC
Part-1: Functional Guarantees
GWSSB
Page 1 of 114
VOLUME III C PART 1- Functional Guarantees STP Based On Open technology
This document sets out the functional guarantees required to be provided by the Bidder for assessing the performance of the W orks.
These guarantees shall be used by the Employer to evaluate Bidder’s satisfactory performance during the Tests after Completion, and
also throughout the Operation and Maintenance Period.
The Bidder shall complete the following sections and provide values for the electrical energy usage and chemical usage for
the Works covered under the contract, based on the raw sewage flows and characteristics and specified treated sewage and
sludge quality requirements as given in Part - 2 of Volume III A of tender document.
The Bidder guarantees that the plant effluent and sludge quality requirements specified in Part 2 of Volume IIIA will be full y and
completely met, under either actual or simulated design raw sewage flows, loadings, and characteristics, as demonstrated by the Tests
after Completion. The bidder further guarantees that the specified requirements will continue to be fully and completely met throughout
the Operation and Maintenance Period.
The Bidder guarantees that electrical energy usage of various components of the Works will not exceed the values listed in the table
below, as demonstrated by the Tests after Completion and throughout the Operation and Maintenance Period.
GWSSB
Page 2 of 114
VOLUME III C PART 1- Functional Guarantees STP Based On Open technology
The electricity rate shall be used as Rs.7/- per kwh for tender bidding/ evaluation, which shall be revised (Increase or decrease w.r.t Rs. 7/- Per
kwh) during O & M period, the difference of the amount against power cost shall be adjusted by Employer.
The power guarantee (PG) submitted here shall be directly converted to Quoted Power Cost (C P) component in total O&M cost, during financial
bid evaluation.
The power guarantee will be used to arrive at C P to compare the actual power consumption with, during actual operation in lieu with penalty
clause as per Vol. IV, Clause 6.1.
The Guaranteed power consumption for all the units in the STPs shall be justified as per Electrical load list cum power consumption statement
provided below:
GWSSB
Page 3 of 114
VOLUME III C PART 1- Functional Guarantees STP Based On Extended Aeration with BNR
of the plant
(BOD removal of minimum 250mg/l or higher as accessed by the bidder to be considered while calculating aeration power
requirement)
Efficiency
Working Motor Motor Operating Total Power
Item of B kW for
Equipment Name units Efficiency Rating hours Consumption
No Equipment operation
(Nos.) (%) (kW) (h/day) (kWh/day)
(%)
1. Mechanical Fine Screen
2. Belt Conveyor
3. Grit Mechanism
4. Grit Classifier Mechanism
5. Organic Return Pump
6. Anoxic / Anaerobic Tank Mixer
7. Process Air Blower
8. Secondary Clarifier mechanism
Pump : Thickener Feed / RAS /
9.
WAS / Internal recirculation
10. Clarifier Mechanism
11. Filter Feed Pumps
12. Backwash Pumps
13. Air Scour Blowers
14. Gravity Sludge Thickener
15. Thickener Dilution water Pumps
16. Digester Feed Pumps
17. Sludge Digester mixers
18. Flaring System
Thickened Sludge Sump Mixers /
19.
Blowers
20. Centrifuge Feed Pumps
21. Centrifuge with VFD
22. Supernatant / Centrate
GWSSB
Page 4 of 114
VOLUME III C PART 1- Functional Guarantees STP Based On Extended Aeration with BNR
of the plant
Recirculation pump(s)
Polyelectrolyte (PE) Tank Agitator
23.
(s)
Polyelectrolyte (PE) dosing pump
24.
(s)
25. Coagulant Tank Agitator(s)
26. Coagulant dosing pump(s)
27. Chlorine Booster pump(s)
28. NaOH recirculating Pump(s)
29. Service Water pumps
30. Drain Pumps
Lighting & Ventilation/ Air
31.
conditioner Loads
32. Motorised Gates/ Valves
EOT crane for
33.
blowers/pumps/equipments
Total
Note: Format given above is indicative only. Bidder shall incorporate all the equipment (required for successful operation of plant) as per
selected process in Power consumption Statement and accordingly arrive on guaranteed power consumption.
GWSSB
Page 5 of 114
VOLUME III C PART 1- Functional Guarantees STP Based On Extended Aeration with BNR
of the plant
1.2.2 Dewatering Polymer Usage per Unit Volume of Plant Effluent for Biological Sludge
GWSSB
Page 6 of 114
VOLUME III C PART 1- Functional Guarantees STP Based On Extended Aeration with BNR
of the plant
1.2.3 Coagulant/ Other Chemical Usage per Unit Volume of Plant Effluent (if required)
1.2.4 Land Requirement: Land requirement has to accommodate all the following:
A1 Treatment plant with all the process units and associated buildings and structures of proposed capacity, to achieve specified treated
sewage quality with internal roads of minimum 4.5 meters width
A2 Green zone of min. 33% along the compound wall (A2= 33% A1)
A3 Sludge drying bed (SDB) for 25% of sludge generated (only area to be en-marked)
A5 Compound wall all along the plot boundary as specified in Clause No.23 of volume III B, Part-1.
GWSSB
Page 7 of 114
VOLUME III C PART 1- Functional Guarantees STP Based On Extended Aeration with BNR
of the plant
B1 The Bidder shall have to submit the extent of land requirement in Technical Bid duly justified in the Layout Plan. In case of any
contradiction, area guaranteed in Vol. III D shall be considered final. However, the land requirement shall not be taken into account for
evaluating the price bid of the Bidder.
GWSSB
Page 8 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
Volume-IIIC, Part-2
Technical Datasheet for Process & Civil Woks
(To be submitted by the contractor after award of the works)
GWSSB
Page 9 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
Sr Units
No Bidder’s Design Values
4 Parshall Flume
(i) Throat Width (m)
Primary Clarifier Distribution Structure
(i) Size of inlet channel
GWSSB
Page 10 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
5 Primary Clarifiers
No. of clarifiers
Capacity, of each ( in MLD)
Diameter of each (m)
Surface area each (m2)
HRT (Hrs)
Side water depth (m)
Surface overflow rate (m3/m2/day)
8 Aeration Basins
(i) No. of basins
GWSSB
Page 11 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
9 Anaerobic Zones
(i) No. of zones per basin
(ii) Volume per basin (m3)
(iii) Total anaerobic volume (m3)
i. No. of basins
ii. Dimension of Each Basin
iii. Volume per basin at (m3)
iv. Max, Average, and Min water levels (m)
v. HRT (hr)
vi. SRT (Days)
Overall F/M ratio (Kg BOD removed / Kg
vii. MLVSS per Day)
viii. MLSS (mg/l)
ix. MLVSS (mg/l)
x. Total Cycle Time ( Hr)
GWSSB
Page 12 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
GWSSB
Page 13 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
F/M ratio
xv.
(Kg BOD removed / Kg MLVSS per Day)
xvi. Vacuum applied
xvii. Flux ( lit/m2/day)
xviii. SRT (Days)
xix. MLR (% of Influent & m3/day)
11 Secondary clarifier(s) Distribution Structure (not applicable to SBRs or MBRs)
i. No. of branches
ii. Size of each branch box (m)
iii.Type of arrangement for equal dist. of flow
No. and size of gated openings and weir gates
iv.
(m)
12 Secondary clarifiers
(i) No. of clarifiers
(ii) Capacity, each (MLD)
(iii) Diameter, each (m)
(iv) Surface area each (m2)
(v) Total HRT (Hrs)
(vi) Side water depth (m)
(vii) Surface overflow rate at average flow
(m3/m2/day)
(viii) Surface overflow rate at peak flow (m3/m2/day)
(ix) Solids loading rate at average flow (Kg/m2/day)
(x) Bottom floor slope
(xi) Diameter of Inlet Pipe (mm)
(xii) Diameter of centre column (mm)
13 Return Activated Sludge Pumping Station
i. Dia. (mm) and length (m) of rising main for RAS
ii. Dia. (mm) and length (m) of rising main for
WAS
iii. Size of RAS Pumps Station Building (m)
iv. All building slab elevations (m)
14 Filtration (Tertiary Treatment)
GWSSB
Page 14 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
GWSSB
Page 15 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
GWSSB
Page 16 of 114
Volume – IIIC, Part-2: Technical Datasheet for STP Based On Open Technology
Process & Civil Works
Miscellaneous
32 The Bidder shall list here details of any other / additional
items required for a complete installation.
Note:
1) Sizes of units shall mean Length x Width x Depth/Height as applicable and shall be expressed in
“metres” unless otherwise stated.
2) Bidder shall furnish details in above table and write “NIL” wherever not applicable to the
respective plant depending upon the process.
GWSSB
Page 17 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
Volume-IIIC
Part-3: Technical Datasheet for Mechanical Works
(To be submitted by the contractor after award of the works)
GWSSB
Page 18 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
To be filled by
Sr. No. Description Units Contractor
(a) General
(i) Make
(ii) Model
(iii) Quantity (W+S) Nos.
(iv) Type
(b) Screen
(i) Clear Spacing mm
(ii) Width mm
(iii) Height mm
(iv) Raking speed m/min
(v) Motor rating kW
(vi) Water Level m
(c) Materials of Construction
(i) Frame
(ii) Rake carriage
(iii) Screen bars
(iv) Fasteners
(v) Canopy
(d) Belt Conveyor System
(i) Material of belt
(ii) Width of conveyor mm
(iii) Speed of conveyor m/sec
(iv) Thickness of belt and ply rating
(v) Make of the belt
(vi) Motor rating kW
(vi) Safety device
(e) Screw Conveyor System
(i) Make
(ii) Material
(iii) Speed rpm
(iv) Motor rating kW
(v) Size of screw mm
GWSSB
Page 19 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. No. Description
To be filled by
Units
Contractor
S. To be filled by
Description Units
No. Contractor
(a) General
(i) Make
(ii) Model
(iii) Quantity (W+S) Nos.
(iv) Type
(b) Screen
(i) Width mm
(ii) Height mm
(iii) Spacing/opening mm
(iv) Water Level m
(v) Drum size
(vi) Raking speed m/min
(vii) Motor rating kw
(c) Materials of Construction
(i) Screen
(ii) Drum
(iii) Rake
GWSSB
Page 20 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. To be filled by
Description Units
No. Contractor
(iv) Fasteners
(v) Screw conveyor
(vi) Chute
(vii) Canopy
(d) Screw Conveyor System
(i) Type
(ii) Width/diameter of mm
conveyor
(iii) Speed of conveyor m/sec
(iv) Motor rating kW
(e) Unit Control Panel
(i) Make
(ii) Over all dimensions mm x
mm x
mm
(iii) Degree of protection
(iv) Screen operations control
Make
Type
GWSSB
Page 21 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
(ii) Type
Pump
Motor
(ii) Motor rating kW
GWSSB
Page 22 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
GWSSB
Page 23 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
Reductions of organics to
GWSSB
Page 24 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
To be filled by Contractor
No of unit
Output signal
GWSSB
Page 25 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
GWSSB
Page 26 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S.
Description Units To be filled by Contractor
No.
(a) General
(i) Make
(ii) Model
(iii) Type
(iv) Diffuser OD x Length mm x
(v) Aeration/SBR Basin mm
Dimensions (L x W xSWD) mm x mm
GWSSB
Page 27 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
GWSSB
Page 28 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
(a) General
(i) Make
(ii) Type
(iii) Quantity (W+S) Nos.
(iv) Capacity at NTP m3/min
(v) Design maximum discharge mlc
pressure
(vi) Efficiency %
(vii) Speed, blower rp
(viii) Absorbed power mk
(ix) Motor rating Wk
(x) Speed, motor W
rp
(xi) Noise level at Duty Point m
dB(A)
in dB(A) at 1.86 m from
the unit
(xii) Vibration mm/sec
(xiii) With Acoustic Hood dB(A)
(xiv) Without Acoustic Hood dB(A)
(xv) Weight – Blower kg
(xvi) Maximum lifting weight kg
(xvii) Dimensions ( L x W x H) m x sm xm
(xviii) Coupling Type
(xix) Coupling Make
(xx) Cooling System
(b) Material of construction:
(i) Casing
(ii) Impeller/Lobes
(iii) Shaft
(iv) Common Base frame
(v) Orientation
(c) Acoustic Hood:
(i) Type
(ii) Material of Construction
(d) Inlet/Outlet silencer
(i) Type
(ii) Make
(iii) Filter media
(ii) Mean air velocity m/s
GWSSB
Page 29 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
GWSSB
Page 30 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S.
No. Description Units To be filled by Contractor
(a) Make
(i) Crane
(ii) Chain pulley block
(iii) Trolley
(b) Crane
(i) Capacity Tonne
(ii) Type
(iii) Lift m
(iv) Span m
(v) Hook approach m
(vi) Rail size kg/m
(vii) Crane girder size mm
(viii) Type of brake
GWSSB
Page 31 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
Sub
S. S. Description Units To be filled by Contractor
No No
. .
(a) Automatic Changeover
Device
(i) Make
(ii) Type
(iii) Quantity (W+S)
(iv) Model
(b) Chlorinator
(i) Make
(ii) Type
(iii) Quantity (W+S)
(iv) Model
(v) Max capacity kg/hr
(vi) Min Capacity kg/hr
(vii) Accuracy as a percent of ±
actual rate in the operating %
range
(viii) Details of Instruments
mounted
(ix) Cabinet Material
GWSSB
Page 32 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
Sub
S. S. Description Units To be filled by
No. No Contractor
.
(iii) Quantity (W+S) Nos.
- Chlorine tonners
- Roller supports
(iv) Tonner capacity Kg
(v) Material of construction:
Body
Rollers
Bush
(f) Liquid Chlorine
Pipe
work, valves
(i) and fittings:
Make
(ii) Type
(iii) Quantity (W+S) Nos
(iv) Rating .
(g) Material of
(i) construction:
Pipe
(ii) Fittings
(iii) Valves
(iv) Type
(v) Body
(vi) Shaft
(vii) Plug/Disc/Diaphragm
(h) Valve Actuator:
(i) Make
(ii) Type
(iii) Model
(i) Pressure Gauges:
(i) Make
(ii) Type
(iii) Range
(j) Gas Chlorine Pipe
work,
(i) valves
Make and fittings:
(ii) Type
(iii) Quantity (W+S)
(iv) Rating
(k) Material of
construction:
(i) Pipe
(ii) Fittings
GWSSB
Page 33 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
Sub To be filled by
S. S. Description Units Contractor
No. No
(iii)
. Valves
(iv) Type
(v) Quantity
(vi) Body
(vii) Shaft
(viii) Plug/Disc/Diaphragm
(l) Valve Actuator:
(i) Make
(ii) Type
(iii) Quantity (W+S) no’s
(iv) Model
(m) Pressure Gauges:
(i) Make
(ii) Type
(iii) Range
(n) Chlorine Ejectors:
(i) Make
(ii) Type
(iii) Quantity (W+S) no’s
(iv) Model Nos.
(v) Rating
(vi) Material of construction :
(vii) End connections
(o) Tonner lifting Beam with
Hooks
(i) Make
(ii) Quantity (W+S)
(iii) Material of construction
(p) Chlorine Tonner
weighing equipment
(i) Make
(ii) Type
(iii) Quantity (W+S)
(iv) Range
(v) Accuracy
(q) Safety Equipment:
(i) Make:
(ii) Quantity:
(iii) Type:
(iv) Self contained breathing
GWSSB
Page 34 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
Sub
S. S. Description Units To be filled by Contractor
No No
. . apparatus quantity
(v) Positive air-line breathing
apparatus quantity
(vi) Instant action
resuscitators quantity
(vii) Safety clothing complete set
quantity
(viii) Emergency showers
quantity
(ix) Eye Baths quantity
(x) Portable compressor, recharging
cylinder, quick
release coupling complete
set quantity
(r) Chlorine Gas scrubber :
(i) Make
(ii) Type
(iii) Model
(iv) Quantity (W+S)
(v) Rating Kg
(vi) Weight Kg
(vii) Capacity Kg
(viii) Caustic pump Cum/hr
capacity/head
(ix) Blower capacity/pressure Cum/hr
S. Sub S.
Description Units To be filled by Contractor
No. No.
Chlorine cylinder
room
Exhaust fans:
(a)
(i) Make
(ii) Model
(iii) Quantity(W+S)
(iv) Capacity m3/s
(v) Speed rpm
(vi) Motor rating kW
GWSSB
Page 35 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
(b) Ducting :
GWSSB
Page 36 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
Description Units To be filled by Contractor
No. No.
(i) Standard
(ii) Type
(iii) Dimension
(iv) Material
(c) Chlorinator Room:
(i) Exhaust fans
(ii) Make
(iii) Model
(iv) Quantity (W+S)
(v) Capacity m3/s
S. Sub
No S. Description Units To be filled by Contractor
. No.
(a) Chemical Handling Crane
( Make
(ii Type and class
)i)
(ii Safe working Load tonne
i)
(i Hoist speed high/low m/min
v) ( Long Travel speed m/min
v
(v Cross travel speed m/min
i))
(vii) Span m
(b) Hoisting Rope:
( Diameter
i(i Construction
i))
(ii Quality of steel
i)
(i Minimum Breaking Load K
v)
( Factor of safety g
v s
)
GWSSB
Page 37 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
No No. Description Units To be filled by Contractor
.
(c) Motors for Hoist/Long
travel/cross travel :
(i) Make
(ii) Type
(iii) Rating
(d) Details of Brakes for Hoist/cross kW
travel/Long travel:
(i) Make
(ii) Design Holding Torque
(iii) Net weight
(e) Electric Hoist – MLR Pump Area
(i) Make
(ii) Type and class
(iii) Safe working Load tonne
(iv) Hoist speed high/low m/min
(v) Long Travel speed m/min
(vi) Cross travel speed m/min
(vii) Span m
(f) Hoisting Rope:
(i) Diameter mm
(ii) Construction
(iii) Quality of steel
(iv) Minimum Breaking Load kgs
(v) Factor of safety
(g) Motors for Hoist/Long
travel/cross travel :
(i) Make
(ii) Type
(iii) Rating kW
(h) Details of Brakes for Hoist/cross
travel/Long travel:
(i) Make
(ii) Design Holding Torque N-mm
(iii) Net weight kgs
(i) Dewatering Building-Crane
(i) Make
(ii) Type and class
(iii) Safe working Load tonne
(iv) Hoist speed high/low m/min
GWSSB
Page 38 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub
No S. Description Units To be filled by Contractor
. No.
( Long Travel speed m/min
v
(v Cross travel speed m/min
i))
(vii) Span m
(j) Hoisting Rope:
( Diameter
i(i Construction
)
i)
(ii Quality of steel
i)
(i Minimum Breaking Load kg
v)( Factor of safety
(k) v
Motors for
)
Hoist/Long
( Make
travel/cross travel:
(ii Type
i))
(ii Rating kW
(l) i)
Details of Brakes for
Hoist/cross travel/Long travel:
( Make
i(i Design Holding Torque N.m
i))
(ii Net weight kg
(m) i)
EOT Crane– Process Air
Blower Room
( Make
(ii Type and class
i))
(ii Safe working Load tonne
i)
(i Hoist speed high/low m/min
v)( Long Travel speed m/min
v
(v Cross travel speed m/min
i))
(vii) Span m
(n) Hoisting Rope:
( Diameter mm
(ii Construction
)i)
(ii Quality of steel
i)
(i Minimum Breaking Load kgs
v)( Factor of safety
(o) v
Motors for
)
Hoist/Long travel/cross travel :
( Make
i(i Type
)
i)
(ii Rating kW
(p) i)
Details of Brakes for
Hoist/cross travel/Long travel:
GWSSB
Page 39 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S Sub S.
. No. Description Units
N
o (i) Make
. (ii) Design Holding Torque N-mm
(iii) Net weight kg
S. Sub S.
No No. Description Units To be filled by Contractor
.
(a) (i) Tank capacity cum
(ii) Tank Dimensions mm
(b) Pump
(i) Pump Make
(ii) Type
(iii) Model
(iv) Quantity (W+S) Nos.
(v) Capacity m3/s
(vi) Head mlc
(vii) Shut off Head metres
(viii) NPSH required metres
(ix) Submergence required metres
(x) Efficiency %
(xi) Absorbed power at duty kW
point
(xii) Motor rating kW
(xiii) Speed rpm
Material of construction:
(c) (i) Casing
(ii) Impeller
(iii) Shaft
(iv) Sleeves
(v) Sealing
(vi) Discharge size mm
(vii) Suction size mm
(viii) Flange Drilling standard:
(ix) Weight (Pump + Motor) kgs
(d) Testing & Inspection:
(i) Pump performance
testing standard
(ii) Maximum Noise level dB(A)
GWSSB
Page 40 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
No Description Units To be filled by Contractor
No.
.
13.0 Gates
S. Sub S.
No No. Description Units To be filled by Contractor
.
(a) (i) Make
(ii) Model
(iii) Quantity (W+S)
(iv) Service
(v) Type
(vi) Spindle Type
(vii) Size mm x mm
(viii) Weight kg
(ix) Seating Head m
(x) Unseating Head m
Material of
(b) construction:
(i) Wall Thimble
(ii) Gate
(iii) Frame
(iv) Spindle
(v) Stem coupling
(vi) Seating face
(vii) Wedge
(viii) Headstock
(ix) Gear House cover & stem
guide
(x) Lift Nut
(xi) Fasteners & Anchors
(xii) Lifting mechanism, Gear
House & stem guide
GWSSB
Page 41 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
No No. Description Units To be filled by Contractor
.
(c) Gate Actuators +
(i) Make
(ii) Type
(iii) Model
(iv) Service
(v) Number Nos
(vi) Motor Rating kw
(vii) Motor speed rpm
(viii) Protection
(ix) Gear Reducer Make
(x) Type
+Bidder to provide above details for each size of Gate and Service
14.0 Valves
S. Sub S. No.
No Description Units To be filled by Contractor
.
(a) Butterfly valves : #
(i) Make
(ii) Type
(iii) Model
(iv) Service
(v) Quantity (W+S) Nos.
(vi) Size m
(vii) Rating m
P
(viii) Test pressure N
b
Material of construction a
r
(ix) Body
(x) Disc
(xi) Sealing face
(xii) Shaft
Gear Reducers
(i) Make
(ii) Material
(iii) Flange Drilling standard
(b) Butterfly Valve Actuators #
(i) Make
GWSSB
Page 42 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
No No. Description Units To be filled by Contractor
.
(ii) Type
(iii) Model
(iv) Service
(v) Quantity (W+S) Nos.
(vi) Motor rating kW
(vii) Design Torque N-m
(viii) Time for full open to full seconds
close
(c) Plug valve
(i) Make
(ii) Type
(iii) Model
(iv) Service
(v) Quantity (W+S) Nos.
(vi) Size mm
(vii) Rating PN
(viii) Test pressure bar
(ix) Body material
(d) Non-return valves #
(i) Make
(ii) Type
(iii) Model
(iv) Service
(v) Quantity (W+S) Nos.
(vi) Size mm
(vii) Rating PN
(viii) Test Pressure bar
(ix) Design standard
(v) Flange drilling standard
(e) Material of construction:
(i) Body
(ii) Disc/plates
(iii) Spring
(iv) Shaft
(f) Sluice valves :#
(i) Make
(ii) Type
(iii) Model
(iv) Service
(v) Number Nos
(vi) Size mm
GWSSB
Page 43 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
(vii) Rating PN
(viii) Test pressure bar
Material of construction
(ix) Body
(x) Gate
(xi) Sealing face
(xii) Shaft
Gear Reducers
(i) Make
(ii) Material
(iii) Flange Drilling standard
Sluice Valve Actuators #
(i) Make
(ii) Type
(iii) Number
(iv) Motor rating kW
(v) Design Torque N-m
(vi) Time for full open to full seconds
close
Knife Gate valves : #
(i) Make
(ii) Type
(iii) Model
(iv) Service
(v) Number
(vi) Size mm
(vii) Rating PN
(viii) Test pressure bar
(ix) Body material
(x) gate material
(xi) Sealing face material
(xii) Shaft material
(xiv) Gear Reducers :
(xv) Make
(xvi) Material
(xvii) Flange Drilling standard
Knife Gate Valve Actuators
#
(i) Make
(ii) Type
(iii) Number
(iv) Motor rating kW
(v) Design Torque kg-m
(vi) Time for full open to full seconds
close
Telescopic valve
GWSSB
Page 44 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
(i) Make
(ii) Quantity (W+S) Nos.
(iii) Type
(iv) Pressure rating PN
(v) Diameter /size m
(vi) End connection
(vii) Material of construction:
(viii) Valve Body
(ix) Spindle
(x) Disc/gate
(xi) Lining
(xii) Fasteners
# Bidder to provide above details for each size, type of Valve and Service
GWSSB
Page 45 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
No No. Description Units To be filled by Contractor
.
(a) (i) Make
(ii) Type
(iii) Quantity (W+S) Nos.
(iv) Size (Diameter x SWD x FB) m
(v) Scraper speed rpm
(vi) Peripheral Velocity m/s
(vii) Design Torque N-m
(viii) Feed rate per thickener cum/hr
(ix) Feed well size mm
(x) Walkway (width x Height) mm
(xi) Weir plate size (Thick x mm
width)
(b) Surface preparation &
protection:
(i) Wetted parts
(ii) Exposed parts
(c) Material of construction:
(i) Bridge and Superstructure
(ii) Feed well
(iii) Shaft
(iv) Walkway Gratings
(v) Squeegees
(vi) Weir plate
(vii) Clamps & Hardware
(d) Motor :
(i) Motor rating kW
(ii) Motor speed rpm
(iii) Make
(iv) Protection
GWSSB
Page 46 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
Sub S.
Description Units To be filled by Contractor
No.
(i) Make
(ii) Type
(iii) Model
(iv) Quantity (W+S)
(v) Capacity cum/hr
(vi) Head mlc
(vii) Efficiency %
(viii) Max.solid size mm
(ix) Speed rpm
(x) Motor rating kW
Material of
construction
(i) :Casing
(ii) Rotor
(iii) Stator
(iv) Line shaft
(v) Sealing
(vi) Base Plate
(i) Protection
(ii) Flange drilling
(iii) standarddiameter
Suction mm
(iv) Discharge mm
(xi) diameter
Coupling
type/make
GWSSB
Page 47 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
Sub
S. S. No. To be filled by Contractor
Description Units
No.
GWSSB
Page 48 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
Description Units To be filled by Contractor
No. No.
(a) Pumps
(i) Make
(ii) Type
(iii) Quantity (W+S) no’s
(iv) Model
(v) Capacity max/min l/s
(vi) Head mlc
(vii) Stroke adjustment mm
(viii) Stroking speed rpm
max/min
(ix) Casing material
(x) Diaphragm material
(xi) Shaft material
(xiii) Motor rating kW
(xiv) Motor Make
(b) Polyelectrolyte
preparation Tank:
(i) Make
(ii) Model
(iii) Quantity (W+S)
(iv) Size (Diameter x mxm
Height)
(v) Material of
construction
Poly solution
(c) Agitator
(i) Make
(ii) Model
(iii) Type
(iv) Quantity (W+S)
(v) Motor rating kW
(vi) Motor speed rpm
(vii) Mixer speed rpm
(viii) Impeller material
(ix) Shaft material
(x) Solids recovery
GWSSB
Page 49 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
Description Units To be filled by Contractor
No. No.
S. Sub S.
No No. Description Units To be filled by Contractor
.
GWSSB
Page 50 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
No No. Description Units To be filled by Contractor
.
(v) Feed rate per cum/hr
(vi) centrifuge
Mass feed rate
(vii) % dried solids
(viii) Noise level (dBA) at dB(A)
1m distance
from the
machine
(ix) Vibration level
(xi) Bowl Diameter mm
(xiii) Bowl length mm
(xiv) Taper Angle degrees
(xv) Bowl speed rpm
(xvi) Centrifugal force Kgf
(xvii) Gear Box ratio
(xviii) Overall Dimension mm
(xix) Weight Kg
(Centrifuge +
(xx) Motor)
Protection of
centrifuge
Material
(b) of Construction:
(i) Bowl
(ii) Scroll
(iii) Blade
(iv) Scroll lead face
(v) protection
Casing-Upper &
(vi) Lower
Wear protection
(c) I Motor :
(i) Make
(ii) Motor rating(Main kW
(iii) Drive)
Motor speed rpm
(iv) Make of Motor
(v) Insulation class
(vi) Enclosure
(vii) Voltage & Frequency
II Motor -Main drive
Make
(i)
(ii) Motor rating kW
(iii) Motor speed rpm
(iv) Make of Motor
(v) Insulation class
GWSSB
Page 51 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
(vi) Enclosure
GWSSB
Page 52 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
No No. Description Units To be filled by Contractor
.
(a) (i) Make
(ii) Model
(iii) Type
(iv) Capacity Kgs/min.
(v) Dimensions mxm
(vi) Material of Construction
(b) Motor
(i) Make
(ii) Rating kW
(iii) Speed rpm
(iv) Insulation class
(v) Enclosure
(vi) Voltage & Frequency
S. Sub S.
No No. Description Units To be filled by Contractor
.
(a) (i) Make
(ii) Model
(iii) Type
(iv) Quantity (W+S) no’s
(v) Capacity Kgs/mi
(vi) Length of conveyor n.
m
(vii) Angle of Inclination
(viii) Belt width mm
(ix) Jointing detail/type
(x) Belt rating
(xi) Belt speed
(xiii) Belt scraper-Type / No.
Motor
(i) Make `
(ii) Rating kW
(iii) Speed rpm
(iv) Insulation class
(v) Enclosure
(vi) Voltage & Frequency
GWSSB
Page 53 of 114
Volume – IIIC, Part-3: Technical Datasheet for STP Based On Open Technology
Mechanical Works
S. Sub S.
No No. Description Units To be filled by Contractor
.
Sub
S.
S. No. To be filled by Contractor
No Description Units
. (i) Make
(a)
(ii) Type
(iii) Service/Location
(iv) Quantity (W+S) Nos.
(v) Capacity cum/hr
(vi) Head mlc
(vii) Efficiency %
(viii) Power absorbed kW
(ix) Speed rpm
(x) Motor rating kW
Note: Bidder shall furnish details in above table and write “NIL” wherever not applicable.
GWSSB