Schedule - B: (See Clause 2.1)
Schedule - B: (See Clause 2.1)
Schedule - B: (See Clause 2.1)
(Schedule-B)
(i) The Project Highway shall follow the existing alignment unless otherwise specified
by the Authority and shown in the alignment plans specified in Annex-III of
Schedule-A. Geometric deficiencies, if any, in the existing horizontal and vertical
profiles shall be corrected as per the prescribed standards for [plain/rolling] terrain
to the extent land is available.
(a) The Paved carriageway shall be 18 (Eighteen) meter wide excluding the
median as per IRC: SP: 84-2014.
Provided that in the following built-up areas the 7.5 m service road shall be
provided with the main carriageway as per IRC:SP:84-2014.
Sl.No. Built-up stretch Location (km to km) Remarks
(Township)
(i) General
The ruling design speed shall be 100 km per hr for plain/rolling terrain]. The
minimum design speed of 80 Km per hour shall be adopted only where site
conditions are restrictive as indicated in the schedule.
(a) Lateral and vertical clearances at overpasses shall be as per the provision
of relevant Manual.
(b) Lateral clearance: The width of the opening at the overpasses shall be
as follows:
Service roads shall be constructed at the locations and for the lengths indicated
below:
Sl.No. Design chainage Length in m Side
4
From (km) To (km)
Total 14215
(c) In the case of grade separated structures, the type of structure and the level of the
Project Highway and the cross roads shall be as follows:
Different types of Cross sections for different segments of four lane stretch shall be
developed as provided in “Manual of Specifications and Standard for four laning of
Highways through Public Private Partnership (IRC: SP: 84-2014) referred in
Schedule – D.
5
Design Chainage Length
Shift
From To m
278+600 278+740 140 Concentric
278+740 278+910 170 Concentric
278+910 280+500 1590 RHS
280+500 280+540 40 Concentric
280+540 281+200 660 RHS
281+200 281+390 190 Concentric
281+390 281+580 190 LHS
281+580 281+730 150 Concentric
281+730 282+730 1000 RHS
282+730 282+980 250 Concentric
282+980 283+130 150 RHS
283+130 283+250 120 Concentric
283+250 283+310 60 LHS
283+310 283+400 90 Concentric
283+400 283+490 90 RHS
283+500 284+160 660 Concentric
284+160 284+250 90 RHS
284+250 284+410 160 Concentric
284+410 284+800 390 RHS
284+800 285+050 250 Concentric
285+050 285+150 100 RHS
285+150 285+250 100 Concentric
285+250 285+900 650 RHS
285+900 287+510 1610 Concentric
287+510 287+800 290 LHS
287+800 287+830 30 Concentric
287+830 288+520 690 RHS
288+520 288+600 210 Concentric
7
Balance Quantity of BC
From To Length in m Side
278+600 288+600 10000 LHS
8
287+900 288+600 RHS 700
Total (2 Lane) 14215
Total (4 Lane) 7.107 km
9
8 284+205 T LEFT MINOR
(ii) Raising of the existing road [Refer to paragraph 4.2.1, 4.2.2 and 4.2.3 of the
Manual and specify sections to be raised] as per the alignment plan & profile given
in the Annexure – III of Schedule – A.
5. Pavement Design
(i) Pavement design shall be carried out in accordance with the section 5 of the
Manual.
The following stretches of the existing road shall be reconstructed. These shall
be designed as new pavement.
Sl. No. Stretch From km to km Remark
s
NIL
6. Roadside Drainage
Drainage system including surface and subsurface drains for the Project
Highway shall be provided as per Section 6 of the Manual.
Location of covered side drain:
Sl. Design chainage Length in m
No.
From (km) To (km)
Total 14215
7. Design of Structures
(i) General
(a) All bridges, culverts and structures shall be designed and constructed
in accordance with the provision of relevant Manual and shall conform to
the cross- sectional features and other details specified therein.
(b) Width of the carriageway of new bridges and structures shall be as follows:
11
Sl. No. Bridge at km Width of carriageway
and cross-sectional
features*
NIL
(f) Cross-section of the new culverts and bridges at deck level for the
Project Highway shall conform to the typical cross-sections given in the
Section 7 of the Manual.
(ii) Culverts
(a) Overall width of all culverts shall be equal to the roadway width of
the approaches.
(b) Reconstruction of existing culverts:
The existing culverts at the following locations shall be re-constructed as
new culverts:
Sl.No. New Type of Proposed Remarks Comments
Location Culvert Size
as per
Design (mtr.)
12
(c) Widening of existing culverts:
All existing culverts which are not to be reconstructed shall be widened to
the roadway width of the Project Highway as per the typical cross section
given in the p r o v i s i o n o f r e l e v a n t M a n u a l . Repairs a n d
st rengt h eni ng o f e x i s t i n g structures where required shall be carried
out.
7.2.4. (A). Status of Hume Pipe Culvert executed and Balance Quantity:
13
2 280+617 Hume 1 x 1200 27.60 22.00 BS 5.6 m,
Pipe mm Head wall-1no,
protection work
3 282+670 Hume 1 x 1200 36.50 12.50 RHS 24.0 m,
Pipe mm Head wall 1no,
protection work
4 284+275 Hume 1 x 1200 36.50 15.00 RHS 21.5 m,
Pipe mm Head wall 1no,
protection work
5 285+811 Hume 1 x 1200 36.50 15.00 RHS Head wall 1 no
Pipe mm protection work
(f) Floor protection works shall be as specified in the relevant IRC Codes
and MoRTH Specifications.
(iii) Bridges
Adequacy or
Sl. Bridge Salient details otherwise of the
Remarks
No. location of existing existing waterway,
(km) bridge vertical clearance,
etc*
NIL
14
(b) Additional new bridges
New bridges at the following locations on the Project Highway shall
be constructed.
NIL
(c) The railings of existing bridges shall be replaced by crash barriers at the
following locations:
The grade separated structures shall be provided at the locations and of the type
and length specified in paragraphs 2 (ix) and 3 of this Annex-I of Schedule - B.
The existing bridges and structures to be repaired/strengthened, and the nature and
extent of repairs /strengthening required are given below:
(a) Bridges
(i) Traffic control devices and road safety works shall be provided in accordance with
16
the section – 9 of the Manual.
9. Roadside Furniture
NIL
[Refer to the provision of relevant Manual and specify the number of trees which
are required to be planted by the Contractor as compensatory afforestation.]
The safety barriers shall also be provided at the following hazardous locations:
17
(Schedule B-1)
1. The shifting of utilities and felling of trees shall be carried out by the
Contractor. The cost of the same shall be borne by the Authority. The details of
utilities are as follows:
Sr. Location/stretch
Type of Utility Unit Quantity
No (LHS/RHS)
A Electrical Utilities
A1 Electrical Poles Nos.
496
282+000 to 285+650 =7.30 KM
A2 Electrical cables meters LT = 14,600 m & BHS
HT = 21,900 m
A3 Transformers 25 KVA Nos. 1
- Transformers 100 KVA Nos. 8
- Transformers 250 KVA Nos. 1
B Water/Sewage pipeline
B1 Sewage meters
B2 Water supply 282+370 to 283+800 = 1430m
meters 4715 RHS, 283+800 to 287+085=
3285m RHS.
- Street Tap Nos. 34 Puranigudam PWSS
- ------- --
C Felling of Tress Nos. 9 Nos.
1 280+740 No 1 RHS
2 281+170 No 1 RHS
3 282+282 No 1 RHS
4 283+430 No 1 LHS
5 285+590 No 1 LHS
6 285+600 No 1 RHS
7 285+650 No 1 RHS
8 285+680 No 1 RHS
9 288+190 No 1 LHS
18