Current Transformer Test Report: 1S1-1S2 2S1-2S2 1S1-1S2 2S1-2S2

This document summarizes test results for a current transformer. It includes nameplate information, insulation resistance measurements, polarity testing, DC resistance measurements, ratio testing, voltage-ampere characteristic testing, an AC withstand voltage test, and conclusions. Test data is provided for the transformer's windings and phases. The purpose is for a power source, installation on a ship, and unloading.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
444 views2 pages

Current Transformer Test Report: 1S1-1S2 2S1-2S2 1S1-1S2 2S1-2S2

This document summarizes test results for a current transformer. It includes nameplate information, insulation resistance measurements, polarity testing, DC resistance measurements, ratio testing, voltage-ampere characteristic testing, an AC withstand voltage test, and conclusions. Test data is provided for the transformer's windings and phases. The purpose is for a power source, installation on a ship, and unloading.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

CURRENT TRANSFORMER TEST REPORT

Usage
Power source incoming Installation location Ship unloading
purpose
1.Nameplate
Type Circuit
Frequency IL
Manufacture
Code R S T
Terminal 1S1-1S2 2S1-2S2 1S1-1S2 2S1-2S2
Transformation
Ratio
Rated Output
Accuracy Class
Serial No.
2.Test Insulation Resistance:
Insulation Resistance(MΩ)
Windings
R S T
P1-1S1 2S1 E(MΩ)
1S1-2S1 P1 E(MΩ)
2S1-1S1 P1 E(MΩ)

Applied instrument:
3.Test Polarity:

Applied instrument:
4. Test DC Resistance:

Phase Winding Resistance (Ω)

1S1-1S2
R 2S1-2S2

1S1-1S2
T 2S1-2S2

Applied Instrument:

Page 1 of 2
CURRENT TRANSFORMER TEST REPORT

Usage purpose Power source incoming Installation location Ship unloading


5. Test Ratio:
Phase R S T
Windings 1S1-1S2 2S1-2S2 1S1-1S2 2S1-2S2

Pri. Current (A)


Sec. Current (A)
Test Ratio
Applied Instrument:
6.V-A Characteristic Test:
Windings Current(A) 0.5 1 2 3 4 5
1S1-1S2
R
2S1-2S2
1S1-1S2
S Voltage(V)
2S1-2S2
1S1-1S2
T
2S1-2S2
Applied instrument:
7.AC Withstand test
Primary winding Test voltage(KV) Time (min) Result
P1-P2 24
Applied instrument:
8.Test conclusion:

Tested Date Temperature

Date: Date: Date:


Prepared & Inspection: Approved By: Witnessed By:

PT.TRUBA JAYA ENGINEERING CNTIC PLN / JMK

Page 2 of 2