3 Construction Rating Audit Protocol PDF
3 Construction Rating Audit Protocol PDF
3 Construction Rating Audit Protocol PDF
Version 1.0
March 2012
Contents
1.0 Introduction .......................................................................................................................................................... 1
Estidama ‐ General ................................................................................................................................................................ 1
The Pearl Rating System for Estidama .................................................................................................................................. 1
The Pearl Rating Stages ......................................................................................................................................................... 2
Key Team Members .............................................................................................................................................................. 2
The Pearl Rating Process ....................................................................................................................................................... 3
2.0 Construction Audit Process Applicability .................................................................................................. 4
Project Applicability .............................................................................................................................................................. 4
Municipality Contact Details ................................................................................................................................................. 4
3.0 Design and Development Teams Responsibility ..................................................................................... 5
General ................................................................................................................................................................................. 5
Pearl Qualified Professional (PQP) ........................................................................................................................................ 5
Independent Commissioning Agent ...................................................................................................................................... 5
Construction Rating Submittals............................................................................................................................................. 5
4.0 Audit Stages ........................................................................................................................................................... 6
Timing and Responsibilities ................................................................................................................................................... 6
5.0 Audit Procedure .................................................................................................................................................. 8
6.0 Audits Timeline ................................................................................................................................................... 9
7.0 Communication Protocol ............................................................................................................................... 10
Construction Rating Questionnaire & Site Audits ............................................................................................................... 10
Credit Clarification Requests – Construction Elements ....................................................................................................... 10
8.0 Corrective Action Procedure ........................................................................................................................ 11
9.0 Certification ........................................................................................................................................................ 12
Municipality Certificate of Completion ............................................................................................................................... 12
Estidama Pearl Construction Rating Certificate .................................................................................................................. 12
i
1.0 Introduction
ESTIDAMA - GENERAL
Estidama, which means ‘sustainability’ in Arabic, is the initiative of the Urban Planning Council (UPC)
aimed at creating more sustainable communities, buildings and villas and to balance the four pillars of
sustainable development: environmental, economic, cultural and social.
Figure 1: The Four Pillars of Estidama
The aspirations of Estidama are incorporated into Plan 2030 and other UPC policies such as the Public
Realm Design Manual (PRDM). Estidama began two years ago and is the first program of its kind that is
tailored to the Middle East region. In the immediate term, Estidama is focused on the rapidly changing built
environment, where UPC is making significant strides to influence projects under design, development or
construction within the Emirate of Abu Dhabi.
1
THE PEARL RATING STAGES
The Pearl Rating System recognizes the reality of ownership and responsibility transitions as a project
evolves from a design team to a construction team to a facility management team. Accordingly, three rating
stages have been established: Design, Construction and Operational.
Pearl Design Rating - The Design Rating rewards measures adopted during the design development of
the project that meet the intent and requirements of each credit. A Pearl Design Rating is valid only until
construction is complete, and requires that all collateral, branding and communication materials identify the
project as a Pearl Design Rated project.
Pearl Construction Rating - The Construction Rating ensures that the commitments made for the Design
Rating have been achieved. The Construction Rating requires that all collateral, branding and
communication materials identify the project as a Pearl Construction Rated project.
Pearl Operational Rating – The Operational Rating assesses the built-in features and operational
performance of a Pearl Construction Rated project and ensures the building is operating sustainably. The
Operational Rating can only be achieved a minimum of two years after construction completion and when
the building has reached a minimum occupancy of 80%.
Pearl Assessor
Figure 2: Key Team Members
The Pearl Assessor is an Estidama representative
who assesses the Pearl Rating submission
documents.
Pearl Qualified Professional
The Pearl Qualified Professional (PQP) is a member
of the Design and Development Team who
facilitates the Pearl Rating System for both Design
and Construction stages. To become a PQP, the
individual must pass an exam which will test their
administrative and technical knowledge of the Pearl
Rating Systems.
The PQP’s role is as follows:
Understand the requirements of the Pearl
Building and Community Rating Systems and
associated Guides;
Facilitate the rating process; and
Provide quality assurance to documents prior to
submission to Estidama.
Communication with Estidama and the Pearl
Assessor will generally be via email, with frequently
asked questions available on the Estidama website.
The website will also provide information to help
guide Design and Development Teams through the
Pearl Rating Systems and will contain schedules of
training sessions, seminars and events.
2
THE PEARL RATING PROCESS
The Pearl Rating System is designed to facilitate an effective way to assess the sustainability performance
of a specific development.
Once planning approval has been obtained (if required), the project will continue toward design stage
completion and it is at this point that a Pearl Design Rating will be submitted, either to the relevant
Municipality or to the UPC’s Estidama team. A full Design Rating submission is linked to obtaining a
building permit from the Municipality and can only be made at Detailed Design stage when the project is
ready for tendering. Similarly a full Construction Rating application is linked to obtaining a certificate of
completion from the Municipality and can only be made upon the completion of construction. Up to date
information on how to submit your project and how it will be reviewed can be obtained from the Estidama
website (‘Submit Project’ page of www.estidama.org).
The general steps required as part of this process are summarised as follows:
All Step 1: Check the Estidama website for details on the submission process.
Step 2: Appoint a PQP to facilitate the rating process and co-ordinate the submission.
Design Step 3: Prepare final design credit submissions and issue to the reviewing authority
upon completion of construction documentation.
Step 4: The submission will be reviewed by a Pearl Assessor, who may request
clarifications or additional information from the PQP as necessary.
Step 5: The Pearl Assessor will award a Pearl Design Rating based on the credits
achieved by the project.
Construction Step 6: PQP will prepare the Construction Rating Questionnaire in order to initiate the
Construction Rating process and associated Site Audits
Step 7: Site Audits during each construction stage (Stages 1 – 4b). PQP to liaise with
UPC / Municipality to conduct Stage 1 – 4b site audits before building handover
Step 8: Prepare final construction credit submissions and issue to the reviewing authority
upon completion of construction.
Step 9: The submission will be reviewed by a Pearl Assessor, who may request
clarifications or additional information from the PQP. Estidama reserves the right
to undertake on-site verification if deemed necessary.
Step 10: The Pearl Assessor will award a Pearl Construction Rating based on the credits
achieved by the project.
Operational Two years following construction completion submissions can be made for the Pearl
Operational Rating (currently under development).
3
2.0 Construction Audit Process Applicability
PROJECT APPLICABILITY
This Site Audit Protocol is only applicable to community, building and villa projects that received Design
Rating Award from the Abu Dhabi Urban Planning Council Estidama Team.
The audits and Construction Site Audit Checklist related to this Protocol are only related to the Pearl Rating
System for Estidama and its associated compliance. All other Municipality and Civil Defence approvals
must be sought as per the normal construction practice within the Emirate.
All questions relating to the Construction Rating process and any site audits should be addressed to the
UPC Assessor in the first instance in accordance with the Communication Protocol section later within this
document.
For projects that have been awarded their Design Rating through the local Municipality, a separate local
protocol will be advised, for details please contact the relevant Municipality:
Email: [email protected]
Website: http://www.adm.gov.ae/en/menu/index.aspx?MenuID=115&mnu=Pri
Email: [email protected]
Website: http://am.abudhabi.ae
Website: http://www.wrm.ae/
4
3.0 Design and Development Teams Responsibility
GENERAL
As a fundamental requirement of the Pearl Rating System, it remains the Design and Development Team’s
responsibility to prove compliance with all Required and Optional Credits.
This Site Audit Protocol has been developed to assist projects in achieving Credit Compliance, and on this
basis does not remove any form of liability from the Design and Development Team.
The Design and Development Team must ensure when required that any audits are carried out in a
timeframe to suit the requirements of the project; neither the UPC nor the Municipality will accept any
responsibility for program delay in relation to non-compliance with a Credit Requirements and the
associated responsibilities.
The Design and Development Team must ensure all areas can be inspected when the visit takes place
relevant to the particular stage of the project and appropriate attendance for each stage as outlined in this
Protocol.
5
4.0 Audit Stages
Stage 3 Stage 2
Internal Fit-Out Superstructure
& MEP Works & Envelope
The following notes provide an overview of the expected discussion points during each Site Audit Stage.
6
Stage 1 – PQP Design and Development Team Estidama Awareness: This is to identify and
Site set-up and ensure that an appropriate handover process has been implemented from design
Contractor to construction and that the Construction Rating requirements are fully understood
sub-structure Senior including any handover meetings, Estidama training, sub-contractor training and
Representative documentation and evidence reporting process.
Design General procurement requirements: An appropriate procurement strategy and
Consultant approval process should be in place to ensure that materials, appliances etc have
Any other been reviewed against the requirements of the Pearl Rating System and evidence
relevant party obtained for the Construction Rating submission.
as considered Natural Systems Credits: Any valuable assets identified as part of the Natural
appropriate Systems Assessment, where applicable need to be appropriately protected.
Construction Waste Management: This is to demonstrate the implementation of
the Construction and Demolition Waste Management Plan (CDWMP) and
appropriate documentation and recording of construction and demolition waste.
7
5.0 Audit Procedure
The audit will take the form of two levels, these being:
Audit meeting; and
Site walk-around.
Generally the audit process will take no more than two hours, but can be extended to accommodate larger
or more complex developments. Time allocation is to be determined by the Design and Development Team
as applicable to their project.
General Procedure
1 Initial meeting at the pre-allocated venue (PPE and site regulations to be Contractor
supplied by the Contractor) to discuss relevant Estidama elements to the
particular audit stage
2 General site walk-around focusing on key inspection areas for the applicable PQP/
PRS for Estidama audit stage Contractor
4 The Construction Site Audit Checklist for the relevant audit stage will be PQP
completed live in the audit meeting
7 The Audit Report include minutes of meeting and the Construction Site Audit PQP
Checklist will be issued to all relevant Design and Development Team
members and the UPC team by email within five working days of the audit
Where items of concern were noted during the audit and were agreed with all parties, an intermediate audit
can be carried out to align concerns and ensure credit compliance is achieved as outlined in the Corrective
Action Procedure section below.
8
6.0 Audits Timeline
As intimated previously the Design and Development Team should request a formal time for audits to suit
their actual construction activities. Where possible, audits shall be booked at least ten working days in
advance with the UPC Estidama Team.
However, within Stage 4 of the Audit Process the following timeline must be adhered to by the Design and
Development Team.
Building
Joint Audit Joint Audit Municipality Issue Handover
Documentation Site Walk Round Completion
Stage 4a Stage 4b Certificate
‐7 ‐6 ‐5 ‐4 ‐3 ‐2 ‐1 0
Timeline (weeks)
Assessment
Correspondence
As mentioned previously, Stage 4 audits will accommodate two forms of audits, the first being PRS for
Estidama documentation and the second being a site walk-around.
The Stage 4a audit will be at the offices of UPC.
On completion of the building and formal Municipality approval being issued, the Design and Development
Team will formally submit the Construction Rating application within 3 to 4 weeks as shown above. The
UPC will then undertake the assessment and provide a response within 3 to 4 weeks.
9
7.0 Communication Protocol
It is the Appointed PQP’s responsibility to act as the main point of contact between the Design and
Development Team and the UPC. Only correspondence received from the Appointed PQP will be
addressed by the Pearl Assessor.
10
8.0 Corrective Action Procedure
Following any site audit stage, if the Construction Site Audit Checklist identifies areas of high risk or where
the mandatory requirements are not being implemented appropriately, the UPC may request corrective
action. This can be in two forms as illustrated below.
If a re-audit is deemed required, the PQP is responsible for scheduling a re-audit and submitting a
Resolution Plan to the UPC Assessor in accordance with the Communication Protocol. The re-audit will
ensure the measures in the Resolution Plan have been implemented appropriately.
Where a re-audit is deemed not necessary, but corrective measures are still required, the PQP will submit
a Resolution Plan to the UPC Assessor in accordance with the Communication Protocol.
Establish Resolution
PQP to schedule a
Corrective Action Rule
Yes re-audit and
Required (Is a re-audit
resolution plan
required)
No
UPC Assessor
PQP to issue a confirms Acceptance
resolution plan or provides
comments
11
9.0 Certification
12
Appendix A
Audit Documentation Templates
Project Name
PQP Name
PQP Email
PQP Number
Client Company
Client Main Contact
Client Email
Contractor Company
Contractor Main Contact
Contractor Email
Please note if the Design PQP and/or Commissioning Agent involved in the design stage will differ from
those at construction stage.
Construction Program
Construction Stage Enabling works Superstructure MEP & Fitout Commissioning
Start Date
Duration
Completion Date
Additional Notes
It is noted that the information provided is preliminary and construction dates may vary and must be
confirmed as the construction program progresses.
Project Summary
Project Name
Pearl Rating System
Building Use
Pearl Rating Stage Construction
PQP Name
PQP Number
Contractor Name
Contractor Company
Client Company
Date
Has the contractor completed any Estidama training? Have workers / sub‐
contractors been made aware of the Estidama and training provided?
Is the contractor aware of the Pearl Rating System and the construction
submission requirements for Estidama e.g. photographic evidence
confirming installation / purchase receipts/ delivery notes?
General Procurement Requirements
Is the design and development team aware of the specific procurement
requirements for the project to meet the required credits? Particularly:
‐ U‐Values for glazing, walls, roof, floor
‐ Air Conditioning Units/Ventilation
‐ Energy Meters
‐ Water Fixtures & Exterior Water Meter
Has the design and development team been provided / made aware of
the Estidama commitments for the project with regard to materials
procurement? e.g. within specification documents, procurement
strategy. Have material specifications been included in bid packages /
questionnaires to suppliers and sub‐contractors? Is there a
procurement approval process?
Is the contractor aware that No Asbestos Containing Materials can be
used on‐site and that timber for external structures cannot be
Chromated Copper Arsenate (CCA)‐ treated timber e.g. handrails?
Natural Systems
Is the contractor aware of the requirements of Natural Systems? If the
project includes areas of ecological value, have appropriate protection
measures been provided? e.g. fencing.
Construction Waste Management
Is there a copy of the CDWMP on site? Is it being implemented? Has a
person responsible for the CDWMP been assigned?
What is the current rate of salvaged / recycled construction and
%
demolition waste? Note Percentage
Optional Credits ‐ Site Audit
Have adequate facilities been provided for construction workers
(recreational area, sanitation and hygiene facilities etc)? Is a copy of the
Guest Worker Accommodation Plan on‐site?
Is a copy of the CEMP on‐site? How is it being implemented/audited? Has
a person responsible for its implementation been assigned?
Have measures been made to remediate the site?
As per credits selected, have recycled, regional, certified timber, rapidly
renewable materials been procured appropriately?
Can the contractor demonstrate that delivery notes have been retained
to demonstrate compliance with Estidama?
Is the contractor aware of the specific procurement requirements for the
Fit‐Out and MEP stage of the project for Water Credits?
‐ Flow rates for water fixtures,
‐ Water use reductions
‐ Exterior water monitoring
Is the contractor aware of the specific procurement requirements for the
Fit‐Out and MEP stage of the project for Energy Credits?
‐ COP for air conditioning units,
‐ Energy efficiency of appliances
Is the contractor aware of the specific procurement requirements for the
Fit‐Out and MEP stage of the project for Livable Building Credits?
‐ Ventilation
‐ Shading SRI (29)
‐ Occupant Thermal Controls (optional)
‐ High frequency lighting and/or daylight sensors (optional)
Is the contractor aware that No Asbestos Containing Materials can be
used on‐site? Is the contractor aware that timber for external structures
cannot be Chromated Copper Arsenate (CCA)‐ treated timber e.g.
handrails?
Envelope Verification & Inspection
Has a review of standard pre‐testing certificates for pre‐tested cladding
systems been carried out? If custom made cladding has been used, has
off‐site testing of prototypes been carried out?
Y es
Has on‐site water infiltration and air tightness tests been carried out on
the building envelope or included in construction program?
Have the appropriate purchase receipts and manufacturer data been
filed for U‐Values of the building envelope?
For fenestration‐type envelopes, have purchase receipts/delivery notes
and manufacturer data been filed for SHGC of fenestration?
Have all the envelope elements (e.g. window and door frames) been
installed and sealed properly?
Construction Waste Management (Update)
Is there a copy of the CDWMP on site? Is it being implemented? Has a
person responsible for the CDWMP been assigned?
What is the current rate of salvaged / recycled construction and
%
demolition waste? Note Percentage
Yes, No,
Partly or
Optional Credits ‐ Site Audit N/A Comments
Have inspections and maintenance been carried out in guest worker
accommodation?
Is a copy of the CEMP on‐site? Has a person responsible been assigned,
and is there a monitoring / implementation process?
Have measures been made to remediate the site?
Is there a copy of the Indoor Air Quality Management Plan and checklist
on‐site? Has the checklist been completed?
Is the contractor / team aware of the material emissions requirements
e.g. low VOC?
As per credits selected, have recycled, regional, certified timber, rapidly
renewable materials been used?
Has a Building Envelope Verification Report been completed and all the
appropriate evidence gathered?
Verification of Installation
Have the appropriate photographic evidence and purchase receipts /
delivery notes been recorded? e.g. A/C units, water fixtures, exterior
water monitoring, efficient appliances, renewable energy, ventilation,
shading devices, relevant materials, etc?
Independent Commissioning Agent Plan
Has pre‐commissioning checks and commissioning as per manufacturers
guidelines and design requirements been carried out and a Building Log
Book developed for:
‐ Air Conditioning Systems
‐ Ventilation Equipment
‐ Water Systems
‐ Solar Thermal Equipment
‐ Lighting & Lighting Controls
Required Credits ‐ Site Audit
For residential units ONLY, is the contractor aware of the commitment to
have weather stripping, impermeable deck to deck partitioning
installation and sealing of penetrations to walls, roofs and ceiling?
Has a Legionella Management Process audit check list been carried out?
Has exterior water monitoring system or water meter(s) been installed
for each of the following uses (where present)?
‐ Heat rejection
‐ Irrigation systems & external hose bibs
‐ Swimming pools & water features
Is the team aware of the landscaping requirements for communities in
terms of irrigation?
Have energy meters been installed?
What is the current rate of salvaged / recycled construction and
%
demolition waste? Note Percentage
Optional Credits ‐ Site Audit
Have inspections and maintenance been carried out in guest worker
accommodation?
Is there a material tracking register to comply with material emissions
requirements e.g. low VOC?
Is the Indoor Air Quality Management Plan being implemented and the
IAQ checklist being applied on a regular basis?
Have thermal occupant controls been installed?
Have water metering facilities been installed for the following interior
uses (where present)?
‐Bathroom/Toilet
‐ Kitchen/Catering
‐ Indoor Swimming Pools
‐ Ablution
General Evidence ‐ Can the PQP demonstrate photographic evidence and
purchase receipts / delivery notes for installed elements particularly the
mandatory requirements
Natural Systems protected area calculations and management strategy
Updated Natural Systems Design and Management Strategy
Updated Building Log Book
Have the Operational & Maintenance Manuals been produced?
Evidence of draft Final Commissioning Report (and Envelope Verification
Report for Villa projects)
Has the tenant fit out design & construction guide been produced? (Core
& Shell Building Projects Only) or Sustainable Building Guidelines for
Community Projects
Required Credits ‐ Supporting Documentation
Has the Legionella Management Checklist been carried out?
Building Envelope U‐value manufacturer data evidence, purchace
receipts / delivery notes & photographic evidence
Interior water data sheets and photographic evidence of installation
Manufacturer information on all installed HVAC systems
Manufacturer information on installed appliances
Has the CDWMP been updated?
What is the current rate of salvaged / recycled construction and
%
demolition waste? Note Percentage
Optional Credits ‐ Supporting Documentation
Yes, No,
Partly or
N/A Comments
Photographs, maintenance vistis and inspections of guest worker
accomodation and formation of Worker's Representative Committee and
development of Workers' social & welfare program
Signed off CEMP audit
Building Envelope Verification Report
Validation report of remediation
Tracking sheet, material safety data sheets and techincal data sheets for
all interior adhesives and sealants, paints and coatings, carpet and hard
flooring, ceiling systems and formaldehyde
Construction Indoor Air Quality completed checklists
Has noise field test report been prepared?
Photographs of installed irrigation systems, water recycling systems and
mainline colour coded, cooling towers, district cooling plant, pool
blankets where applicable
Have the storm water calculations been updated for the site?
Photographic of renewable energy installation
Manufacturer information confirming GWP for refrigerants, and fire
suppression systems
Evidence of use of recycled, regional, certified timber, rapidly renewable
materials
Confirm that external water meters have been installed
Confirm that energy meters have been installed
Confirm that bin storage has been provided
Have no smoking signage been installed? (this is not applicable for
residential buildings / villas)
Optional Credits
Have the air‐conditioning systems been set according to building design
and building flush out been carried out? Have the filters been changed /
cleaned as appropriate?
Has bicycle parking been provided?
Has preferred car parking been provided?
Confirm that internal water meters have been installed
Confirm lighting meets lighting levels and controls requirements to
satisfy light pollution reduction
Consttructio
on Aud
dit Re
eport
Subject:
Date:
Time:
T
Venue:
V
Attendees:
A
cc
c for non-
attendees:
a
Insert photo(s
s) of site reprresenting currrent constructtion stage
Description: Action by: Da
ate:
1. Introduc
ctions
2. Project Update
Stage X Audit:
Refer to
o audit form
4. Site Wa
alk-Around
5. Recomm
mendations / Summary
6. Next Sta
age
Insert relevan
nt pages of th
he Audit Form
m
Attach
A suppo
orting docume
entation
Abu Dhabi Urban Planning Council
62221 P.O.Box 62221
Abu Dhabi, United Arab Emirates
Tel: +971 2 409 6000
Fax: +971 2 443 9443
www.upc.gov.ae