SCOPE OF WORK
JOB NO : PD&T/MLNG/2020/SA040
JOB TITLE : TERM CONTRACT OF REPAIR AND REFURBISH AUTOMATIC RECIRCULATION CONTROL
(ARC) VALVE SERIES 5300 FOR MALAYSIA LNG SDN BHD
Note:
I) Column B - Compliance to technical requirements.
YES - Able to comply with the requirements
NO - Not able to comply with the requirements
(This column is mandatory to be filled in by the contractor and must be respond together with the proposal)
ii) Column C - To be filled in by the contractor if necessary. Please attach additional info in appendix if necessary.
COLUMN A COLUMN B COLUMN C
CONTRACTOR’S
REQUIREMENTS (YES/NO)
REMARKS
1. INTRODUCTION
MALAYSIA LNG SDN BHD (the “COMPANY”) intends to engage CONTRACTOR to perform repair and refurbishment
of Automatic Recirculation Valve (ARC) Series 5300.
The aim of this of these contract documents is to outline the scope of works to be offered by the bidder for this contract
whereby to cater for Inspection, Testing, Non Destructive Evaluation for Life Assessment and Determine the Viability
of Repairs
2. JOB DESCRIPTIONS
2.1 In general, the work scope will be breakdown into four (4) parts and work
stages as described below: -
PART I Perform receiving inspection and ‘As-Found’ Inspection
Perform cleaning and dimensional inspection
Perform Non Destructive Evaluation (NDE) for Valves
PART II Standard Repair & Refurbish
PART III Perform Part Replacement
PART IV Factory Test
2.2 CONTRACTOR shall attain full unit responsibility of all inspections and
repair works.
Open
Page 2 of 7
TERM CONTRACT OF REPAIR AND REFURBISH AUTOMATIC RECIRCULATION CONTROL (ARC) VALVE SERIES 5300 FOR MALAYSIA LNG SDN BHD
multiple initiation sites and overlapping cracks must be stated
as well as the change in nominal propagation, if any.
(b) Flaw morphology descriptions include aspects such as inter or
trans granularity and extent of branching if any.
(c) Measuring the flaw roughness if sample are to be taken in the
assessment.
(d) Tilt and skew of flaw which means geometric variations,
including degree of tilt and skew of flaws.
(e) The aspect ratio of a flaw which defined the ratio of the depth
to length dimension.
(f) Estimation of the damage by creep, fatigue, stresses corrosion
cracking (SCC), fatigue corrosion cracking (FCC) and etc. if
any.
3. MATERIAL DESCRIPTION
Valve Tag
Mod Pump Tag No Service Valve Size Rating
No
1PT5710
1PT5720 Boiler Feed Water SP-5705 8" 900# RF
1PM5730
1PT5701A
1 1PT5701B Deaerator Feed
SP-5708 8" 150# RF
Water
1PM5701C
1PM5701D
1PT5707A Desuperheater
SP-5712 1.1/2" 150# RF
Water
1PM5707B
2PT5710
2 2PT5720 Boiler Feed Water SP-5705 8" 900# RF
2PM5730
Open
Page 3 of 7
TERM CONTRACT OF REPAIR AND REFURBISH AUTOMATIC RECIRCULATION CONTROL (ARC) VALVE SERIES 5300 FOR MALAYSIA LNG SDN BHD
2PT5701A
2PT5701B Deaerator Feed
SP-5708 8" 150# RF
Water
2PM5701C
2PM5701D
2PT5707A Desuperheater
SP-5712 1.1/2" 150# RF
Water
2PM5707B
3PT5710
3PT5720 Boiler Feed Water SP-5705 8" 900# RF
3PM5730
3PT5701A
3 3PT5701B Deaerator Feed
SP-5708 8" 150# RF
Water
3PM5701C
3PM5701D
3PT5707A Desuperheater
SP-5712 1.1/2" 150# RF
Water
3PM5707B
4. RELATED EXPERIENCES
1. 8" 900# RF
2. 8" 150# RF
3. 1.1/2" 150# RF
6. COMPANY OBLIGATION
c) The COMPANY shall not be held responsible for any WORK delay if the
CONTRACTOR is unable to deploy the minimum required manpower and
machinery to execute the WORK.
e) Once awarded, the COMPANY shall discuss and agree on the date and
period to carry out the WORK.
f) The COMPANY reserves the right not to process invoice(s) where the
WORK is not being carried out as stated in the scope of work
7. CONTRACTOR OBLIGATION
e) CONTRACTOR shall indicate minimum lead time for taking over of the
CONTRACT with emphasis on the availability of required manpower,
planning schedule and facilities.
k) CONTRACTOR shall ensure that the required reports, plans and analysis
are delivered on time. Failure to do so will allow the COMPANY the right
Open
Page 5 of 7
TERM CONTRACT OF REPAIR AND REFURBISH AUTOMATIC RECIRCULATION CONTROL (ARC) VALVE SERIES 5300 FOR MALAYSIA LNG SDN BHD
to hold the payment until the required documents is submitted to the
COMPANY.
o) CONTRACTOR shall prepare and submit Job Hazard Analysis (JHA) and
ensure all requirements are fulfilled prior execution of works.
8. HSE REQUIREMENTS
c) CONTRACTOR shall employ personnel who have obtained OIL & GAS
SAFETY PASSPORT (OGSP) to work inside COMPANY premise. Any
personnel who do not possess a valid passport are not allowed to enter
and work in COMPANY premise (if applicable).
Open
Page 6 of 7
TERM CONTRACT OF REPAIR AND REFURBISH AUTOMATIC RECIRCULATION CONTROL (ARC) VALVE SERIES 5300 FOR MALAYSIA LNG SDN BHD
ZeTo #10: Do not use your mobile phone/walkie-talkie while driving,
follow the speed limit and use your seat belt
9. PAYMENT TERM
Payment will be made within thirty (30) days upon receipt of undisputed
invoice based on the following milestone payments;
10. INSURANCE REQUIREMENT
11. WARRANTY
CONTRACTOR shall submit documents as below in separate mode before closing bid time and date:
1. Technical Proposal:
a) Cover letter for technical proposal
b) Attachment A (Scope of Work)
c) Attachment B (Unpriced schedule of rates)
d) List of Experience and specification of auto recirculation valves that have been serviced.
2. Commercial Proposal:
a) Cover letter for commercial proposal
b) Attachment B (Priced schedule of rates)
------------------------------------ ----------------------------
NAME :
DATE :
Open
Page 7 of 7
TERM CONTRACT OF REPAIR AND REFURBISH AUTOMATIC RECIRCULATION CONTROL (ARC) VALVE SERIES 5300 FOR MALAYSIA LNG SDN BHD