Simulation Project PDF, Amro Aried
Simulation Project PDF, Amro Aried
ARIED,AMRO
Page 1 of 6
Table of Contents
1.Abstract: .................................................................................................................................................... 2
2.Introduction: .............................................................................................................................................. 2
2.1. Context: .............................................................................................................................................. 2
2.2. Problems: ........................................................................................................................................... 3
3.Methods & Procedure: .............................................................................................................................. 3
3.1. Setting up the model: ......................................................................................................................... 3
3.2. Running the model: ............................................................................................................................ 3
3.3. Solution Approach: ............................................................................................................................. 4
4.Results: ...................................................................................................................................................... 4
4.1. Queue times: ...................................................................................................................................... 4
4.2. Parking Spaces: .................................................................................................................................. 5
5.Discussion: ................................................................................................................................................. 6
6.Conclusion:................................................................................................................................................. 6
1.Abstract:
Many businesses conduct their day to day activities with little to no planning, mostly relying
on instinct, or just randomly going with a plan and seeing where it leads them. While that tends
to work for a few businesses, most of the time it would lead to irreversible consequences, such
as, customer dissatisfaction, revenue losses and much more consequences that inevitably lead
to the business closing, because of how serious these consequences can be, proper forecasting,
planning as well as simulation must be conducted to ensure that everything is set up correctly
at the correct times and the correct amount, in this research article we will be conducting a
simulation and analysis using the Arena software on a 5 Star Restaurant.
2.Introduction:
2.1. Context:
The restaurant owner already has a plan in place, which includes a three period working day consisting
of breakfast starting at 8 AM to 12 PM, followed by lunch from 12PM to 4PM, and finally dinner from 4
PM to 8 PM with an optional dessert available for lunch and dinner meals, forecasted data for arrival
times, time it takes for customers to order/pay for the meal, as well as several chefs, waiters, and a
cashier, also there is a fixed time of preparation for each meal offered on the menu, moreover there is
forecasted data for the percentage of customers that order meals from each period. The customers can
also eat at the restaurant and pay after they are finished or directly pay for the meal and take it home.
2.2. Problems:
The restaurant owner wishes to know whether his current plan is worth keeping or a change
must occur, with his priorities being:
1. Knowing the optimal number of chefs for each meal type.
2. Knowing how much parking spaces should be available based on the highest number of
customers at the restaurant at the same time.
3. Eliminating long queues and guaranteeing customer satisfaction.
Based on the first results we can see how there is obviously a problem with the setup, from the figure
above the problem is specifically located in the Dinner and Lunch Periods. However, when we check the
queues section, we also find that there’s problems with the breakfast and dessert queues as well:
We can see in the above figure how big of a problem we have with queue times ranging from 0.26 hours
up to 16.04 hours with the original plan the customer owner has, because of that a change must occur in
the plan.
The main change that needs be done is number of chefs available for each more type, because of that
we add two more breakfast chefs, 3 more Seafood Chefs, 1 more American chef, 2 more Brazilian chefs,
and 2 more Dessert Chefs.
4.Results:
4.1. Queue times:
By implementing the changes discussed previously we get the following results:
5.Discussion:
We can see from the results above the drastic effect adding a few chefs made to the restaurant
and by using The graph for the work in process above we can see how the maximum number of
customers present at the restaurant at the same was about 31 customers, because of that the
restaurant needs to have at least 31 parking spaces available for the customers.
6.Conclusion:
By observing the results we can see how important it is for businesses to construct simulation
and analysis models for their plans knowing how much of change they could do for maximizing
revenue and reducing cost at times, as well as guaranteeing customer satisfaction at all times
whether it was at parking or the operation queues.