The document discusses the design considerations for a bridge including using a pre-stressed concrete 6 girder simply supported span structure, an 11m wide 3 lane carriageway, RCC columns to support the superstructure, open foundations, a 57 degree skew angle, M45 and M35 grade concrete, Fe 500 un-tensioned reinforcement, 12T13 and 12T15 prestressing steel, considering 3 lanes of IRC class A vehicle load or 1 lane of IRC class 70R plus 1 lane of IRC class A, and a 400 kg/m^2 crowd load while following IRC codes 6-2010, IRC 21, IRC 78 and IRC 18.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
90 views1 page
Design Considerations
The document discusses the design considerations for a bridge including using a pre-stressed concrete 6 girder simply supported span structure, an 11m wide 3 lane carriageway, RCC columns to support the superstructure, open foundations, a 57 degree skew angle, M45 and M35 grade concrete, Fe 500 un-tensioned reinforcement, 12T13 and 12T15 prestressing steel, considering 3 lanes of IRC class A vehicle load or 1 lane of IRC class 70R plus 1 lane of IRC class A, and a 400 kg/m^2 crowd load while following IRC codes 6-2010, IRC 21, IRC 78 and IRC 18.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Design Considerations
Type of Superstructure: Pre-stressed Concrete 6 girder simply supported span.
Carriageway specification: Three Lane carriageway of width 11.0 M. Type of Substructure: Superstructure is supported on 6 nos. RCC columns . Type of foundation: Open foundation Skew angle: 57 degree. Grade of concrete: M45 for superstructure, M35 for all other components
Grade of un-tensioned reinforcement: Fe 500
Grade of Prestressing steel: 12T13 low relaxation class 2 strands for 35.375 M span,
12T15 low relaxation class 2 strands for 47.000 M span
Live Load considered: 3 Lanes of IRC class A train of vehicles, or , 1 Lane of IRC class 70R
train load plus 1 Lane of IRC class A train load, whichever produces