APQP Internal Assessment Checklist: Development Phase
APQP Internal Assessment Checklist: Development Phase
Requirements: Finding:
1. Are system and/or component level Project Teams
formed?
Requirements: Finding:
Requirements: Finding:
o A systematic and sequential review of the
manufacturing process at quoted peak daily line
rate, including manpower, facilities, equipment,
material, methods, procedures, etc.?
17. Are Potential Process Failure Modes identified with
the use of Process FMEA’s at the product level,
system, and component level designs? Are high-risk
failure modes identified by station and are lists
available?