Loop Impedance - B1

1. The document reports the results of loop impedance and prospective short circuit current tests on various power sockets in the basement of a building. 2. Impedance and current values are within acceptable ranges for all sockets tested, with all sockets noted as passing the tests. 3. The tests were carried out by Winstar and approved by Louvre on December 21, 2019.

Uploaded by

madhavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
180 views5 pages

Loop Impedance - B1

1. The document reports the results of loop impedance and prospective short circuit current tests on various power sockets in the basement of a building. 2. Impedance and current values are within acceptable ranges for all sockets tested, with all sockets noted as passing the tests. 3. The tests were carried out by Winstar and approved by Louvre on December 21, 2019.

Uploaded by

madhavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

Client: Contractor:

MAINTENANCE TEST REPORT


Date 21/12/2019 Page: 1 of 5
Location BASEMENT-1
Equipment Power Socket
Feeder Description

LOOP IMPEDANCE TEST REPORT

Phase-Earth Phase-Neutral
Socket PEFC PSC Room
Reference Impedance Prospective Impedance Prospective Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current (A)

B2-DB03B-R4 0.97 227 0.92 290 PLT-3-B2-C04 PASS

B2-DB03-R5 0.91 258 1 210 PLT-4-B2-C04 PASS

B2-DB01-Y1 0.47 507 0.72 331 PLT-4-B2-C04 PASS

B2-DB01-Y3 0.75 318 0.96 278 PLT-3-B2-C03 PASS

B2-DB07-Y1 0.70 339 0.98 243 PLT-3-B2-C03 PASS

B2-DB06-Y4 0.96 221 0.98 272 PLT-4-B2-C05 PASS

B2-DB09-Y4 0.97 275 0.93 218 PLT-4-B2-C05 PASS

B2-DB15-Y2 0.68 350 0.74 322 PLT-4-B2-C05 PASS

B2-DB15-Y3 0.37 644 0.61 390 PLT-4-B2-C05 PASS

AD-LG-DB01-
0.42 565 0.49 484 PLT-1-LG-02 PASS
B1

AD-LG-DB01-
0.33 712 0.33 712 PLT-1-LG-22 PASS
R1

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 21-12-2019 21-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 21/12/2019 Page: 2 of 5
Location BASEMENT-1
Equipment Power Socket
Feeder Description

Phase-Earth Phase-Neutral
Socket PEFC PSC Room
Reference Impedance Prospective Impedance Prospective Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current (A)
AD-LG-DB01-
0.29 828 0.28 840 PLT-1-LG-03 PASS
R1
AD-LG-DB01-
0.35 679 0.79 301 PLT-1-PG-02 PASS
B7
DOOR NO PASS
BB-01-R7 0.22 1100 0.28 843
2426
EB-LG-DB03-
0.46 516 0.59 402 ADM-1-LG-03 PASS
Y3
LG-DB03-R6 0.56 422 0.72 328 Corridor PASS
EB-LG-DB03-
0.44 540 0.42 565 ADM-1-LG-04 PASS
Y6
EB-LG-DB03-
0.57 414 0.72 328 ADM-1-LG-04 PASS
R,Y,B-7
EB-LG-DB03-
0.52 456 0.73 325 ADM-1-LG-04 PASS
R,Y,B-7
AD-LG-DB01-
0.53 442 0.53 442 PLT-1-LG-23 PASS
R4
AD-LG-DB01-
0.64 367 0.64 366 PLT-1-LG-23 PASS
R6
AB-LG-DB01- DOOR NO
0.64 370 0.65 364 PASS
Y3 2147
AD-LG-DB01-
0.55 427 0.57 412 T01-1-LG-01 PASS
R4

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 21-12-2019 21-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 21/12/2019 Page: 3 of 5
Location BASEMENT-1
Equipment Power Socket
Feeder Description

Phase-Earth Phase-Neutral
Socket PEFC PSC Room
Reference Impedance Prospective Impedance Prospective Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current (A)
AD-LG-DB01-
0.36 626 0.38 365 ST0-1-LG-C01 PASS
B1
EB-LG-DB05-
0.62 384 0.97 245 ST0-4LG-12 PASS
Y9
EB-LG-DB05-
0.53 448 0.52 456 ST0-1-LG-12 PASS
B6
EB-LG-DB05-
0.54 440 0.70 340 ST0-1-LG-12 PASS
Y6
EB-LG-DB05-
0.54 439 0.54 449 PLT-4-LG-08 PASS
B7
EB-LG-DB05-
0.46 514 0.51 464 Corridor PASS
R9
EB-LG-DB05-
0.68 348 0.68 438 PLT-1-LG-16 PASS
R1
BC-LG-DB05-
0.42 562 0.44 537 PLT-1-LG-14 PASS
R3
EB-LG-DB05-
0.40 591 0.26 910 PLT-1-LG-13 PASS
R3
EB-LG-DB03-
0.55 433 0.59 403 ST0-1-LG-10 PASS
B4

B1-DB07-Y3 0.40 595 0.51 465 PLT-2-B1-10 PASS

B1-DB07-B5 0.49 486 0.50 476 PLT-2-B1-51 PASS

B1-DB07-B7 0.93 256 0.94 292 B1-DB07-B7 PASS

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 21-12-2019 21-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 21/12/2019 Page: 4 of 5
Location BASEMENT-1
Equipment Power Socket
Feeder Description

Phase-Earth Phase-Neutral
Socket PEFC PSC Room
Reference Impedance Prospective Impedance Prospective Reference Remarks
(ohm) earth fault (ohm) Short circuit
Current (A) current (A)
B1-DB11-B2 0.84 282 0.57 416 PLT-2-B1-34 PASS

B1-DB11-B2 0.97 244 0.43 425 PLT-2-B1-34 PASS

B1-DB11-B5 0.35 677 0.22 927 CORRIDOR PASS

B1-DB11-Y2 0.62 380 0.57 464 CORRIDOR PASS

SDO-2-B1-
B1-DB11-R7 0.47 500 0.70 236 PASS
03
B1-DB11-B5 0.32 742 0.37 641 PLT-2-B1-43 PASS

B1-DB11-R4 0.38 619 0.30 784 PLT-2-B1-44 PASS

B1-DB11-R2 0.49 547 0.43 547 PLT-2-B1-35 PASS

B1-DB01-Y1 0.97 257 0.95 249 PLT-2-B1-04 PASS

B1-DB01-R4 0.48 491 0.59 400 PLT-2-B1-33 PASS

B1-DB01-B3 0.37 641 0.53 447 PLT-2-B1-28 PASS

B1-DB01-B3 0.61 452 0.53 447 PLT-2-B1-29 PASS

B1-DB01-R10 0.76 311 0.49 500 PLT-2-B1-29 PASS

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 21-12-2019 21-12-2019
Client: Contractor:
MAINTENANCE TEST REPORT
Date 21/12/2019 Page: 5 of 5
Location BASEMENT-1
Equipment Power Socket
Feeder Description

Phase-Earth Phase-Neutral
Socket PEFC PSC Room
Impedanc
Reference Impedance Prospective Prospective Reference Remarks
e
(ohm) earth fault Short circuit
(ohm)
Current (A) current(A)
B1-DB01-Y5 0.52 455 0.51 464 PLT-2-B1-C06 PASS

B1-DB01-Y2 0.62 381 0.38 622 PLT-2-B1-58 PASS

B1-DB07-R3 0.56 423 0.81 293 PLT-2-B1-51 PASS

EQUIPMENT USED FOR TESTING:

Instrument Name Instrument Make Type Serial No. Cal. Due. Date
Multi-function meter Fluke 5522A 2597902 24-07-2020

COMPANY TEST CARRIEDOUT BY: WINSTAR TEST APPROVED BY: LOUVRE

SIGNATURE
NAME SHAHUL MUNIR MOHAMED
DATE 21-12-2019 21-12-2019