07-Chapter 7 Dynamic Resource Control Procedure Analysis PDF
07-Chapter 7 Dynamic Resource Control Procedure Analysis PDF
Table of Contents
i
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
7.1 Overview
Dynamic resource control is the process to control the radio resources through such
means as the channel reconfiguration, radio bearer (RB) reconfiguration and so on. In
this way, it can achieve appropriate allocation and efficient utilization of the resources.
In this chapter, we will describe the dynamic resource control process through
examples, including:
z RAB modification
z Dynamic channel reconfiguration
7.2.1 Overview
When the service parameters change, the RAB modification procedure shall be
initiated by the CN to reconfigure the RAB to adapt to the QoS change. This procedure
is initiated by the CN and implemented by the UTRAN.
Corresponding to the RAB setup and release procedures, RAB modification has the
following four kinds according to the RRC connection status before and after the RAB
modification:
z DCH-DCH: The RRC connection is in CELL_DCH state before the RAB
modification and also in CELL_DCH state after the RAB modification.
z CCH-CCH: The RRC connection is in CELL_FACH state before the RAB
modification and also in CELL_FACH state after the RAB modification.
z CCH-DCH: The RRC connection is in CELL_FACH state before the RAB
modification and in CELL_DCH state after the RAB modification.
z DCH-CCH: The RRC connection is in CELL_DCH state before the RAB
modification and in CELL_FACH state after the RAB modification.
This section describes only the DCH-DCH RAB modification procedure. Other kinds of
procedures can be deduced by analogy.
7-1
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
Similar to the RAB setup procedure, the DCH-DCH RAB modification procedure can
also be implemented through the following two ways:
z Synchronous radio link reconfiguration
z Asynchronous radio link reconfiguration
This section describes only the DCH-DCH RAB modification procedure in the case of
synchronous radio link reconfiguration as shown in Figure 7-1.
NodeB Serving
UE RNC CN
Serving RNS
1. RAB ASSIGNMENT REQUEST
RANAP RANAP
[Modify]
2. Select L1, L2 andIu Data
Transport Bearer parameters
e.g. for Radio Bearer
reconfiguration.)
Actualizing Radio Bearer modification (e.g. Apply new transport format set)
7-2
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
I. Message Structure
IE/Group name Presence Semantics description
Message Type MP –
UE Information elements –
Activation time MD –
New U-RNTI OP –
New C-RNTI OP –
7-3
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
CN information elements –
CN Information info OP –
URA identity OP –
RB information elements –
CHOICE mode OP –
>FDD –
>>CPCH set ID OP –
7-4
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
>TDD –
Frequency info MD –
CHOICE mode MP –
>FDD –
>TDD –
7-5
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
7-6
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
II. Example
7.3.1 Overview
7-7
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
When the UE initiates a service request, the RNC shall allocate an appropriate
channel bandwidth as per the requested QoS. The RNC keeps monitoring the traffic
measurement, downlink code transmit power, and so on during the service process.
When there is a change in the rate of service origin or the quality of air interface, the
RNC adjusts the channel bandwidth to satisfy the new requirement of the service
origin. This procedure is called dynamic channel reconfiguration.
The RNC informs the UE of the new radio link parameters through this.
The radio bearer reconfiguration procedure is used to reconfigure a radio bearer. This
section describes the dynamic channel reconfiguration procedure, as illustrated in
Figure 7-2, with radio bearer reconfiguration as an example. The RRC connection of
the UE is in CELL_FACH state before the radio bearer reconfiguration and in
CELL_DCH state after the radio bearer reconfiguration.
UE NodeB CRNC
1. RADIO LINK SETUP REQUEST
NBAP NBAP
2. RADIO LINK SETUP RESPONSE
NBAP NBAP
7-8
Protocols and Signalling Analysis
HUAWEI UMTS Radio Access Network Chapter 7 Dynamic Resource Control Procedure Analysis
5) After successfully handed over to the target cell, the UE sends a RADIO
BEARER RECONFIGURATION COMPLETE message to the CRNC on the
DCCH.
6) After detecting the uplink synchronization of the new radio link, the NodeB sends
a RADIO LINK RESTORE INDICATION message to the CRNC. The message
shall contain the information about the radio link detected as synchronized. The
radio bearer reconfiguration procedure ends.
7-9