5. DESIGN GUIDES (PG-18-12) (Graphic information on specific programs in the design development of VA
facilities)
6. DESIGN ALERTS (These alerts are issued on a regular basis for design and construction related issues)
7. A/E QUALITY ALERTS (These alerts are issued to guard against common and repeat design errors)
9. TECHNICAL SUMMARIES (The summaries of HVAC design requirements for special and critical areas)
2
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
3
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
4
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
5
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
STRUCTURAL REVIEW
NO. ITEM COMMENTS/
YES/NO/NA
5 Computer Application
a. Computer output summarized for primary load resisting
members
b. Computer Program Documentation
6 Reviewed A/E Quality Alert of Structural, Contract Document Phase
7 Insure that that all review issues have been resolved, and the
project files contain information on how each issue was finalized
8 Insure that the project files contain a final set of structural
calculations for future reference
9 All structural drawings and calculations to show evidence that
they have been done and checked by professional structural
engineer listed under key personnel in the A/E contract