Pier 28+545
Pier 28+545
Pier 28+545
(CH. 28+545)
SALIENT FEATURES OF THE BRIDGE :
LEVEL DETAILS
Formation level = 454.645 m
Ground Level (Min Bed Level) = 449.687 m
Foundation Bottom Level = 445.450 m
LWL = 449.687 m
HFL = 452.751 m
MSL (As per Hydrological Calculation) = 447.687 m
Reinforcing Steel:
Grade of Reinforcement fyk = 500 MPa
Design yield strength of reinforcement fyd = 0.80 x fyk
= 400 MPa
Modulus of Elasticity Es = 200000 MPa
RCC Density = 2.50 t/m3
Dry density of earth = 2.00 t/m3
ANALYSIS ASSUMPTION
Enviromental parameters
Relative humidity = 80 %
Exposure condition = SEVERE
Modulus of Elasticity for Concrete
For short Term loading Ecm = 32000 MPa
For long Term loading Ecm' = Ecm / ( 1 + Φ)
where, Φ = Creep coefficent
Creep coefficent for Foundation Φ = 1
( As ho = ∞, For foundations)
Ecm' = 16000 MPa
SEISMIC PARAMETER
Seismic Zone = III
Type of soil = rocky
Zone factor Z = 0.16
Importance factor I = 1.20
Response Reduction Factor, Rlong. = 3.00
Response Reduction Factor, Rtrans. = 1.00
Response Reduction Factor, Rvert. = 3.00
Buoyancy
LWL Condition
HFL Condition
Volume of Foundation = 72.36 m3
Volume of pier cap = 4.86 m3
Volume of pier shaft = 93.31 m3
Total = 170.53 m3
Buoyant weight over Foundation = -170.53 t
Buoyant weight over pier shaft = -98.17 t
Force due to DL about c/l of Pile Cap bottom Left span Right span
Vertical Load (Sup DL Reaction) 206.000 t 206.000 t
eL 0.450 t 0.450 t
Moment MTT 92.700 t 92.700 t
Moment MLL 0.000 t 0.000 t
Cg. From Foundation bottom 8.770 t 8.770 t
0.065 thick WC
11 11
Type of Vehicles
1. Class 70R Loading 7.00 t 14.00 t 14.00 t 14.00 t 14.00 t 7.00 t
Tracked Distance 0.95 m 0.95 m 0.95 m 0.95 m 0.95 m
2. Class 70R Loading 17.00 t 17.00 t 17.00 t 17.00 t 12.00 t 12.00 t 8.00 t
Wheeled Distance 1.37 m 3.05 m 1.37 m 2.13 m 1.52 m 3.96 m
3. Class A Loading 2.70 t 2.70 t 11.40 t 11.40 t 6.80 t 6.80 t 6.80 t 6.80 t
Distance 1.10 m 3.20 m 1.20 m 4.30 m 3.00 m 3.00 m 3.00 m
0.50 m
1.50 m 7.50 m
0.50 m
1.50 m 7.50 m
0.50 m
1.50 m 7.50 m
0.50 m
1.50 m 7.50 m
0.50 m
1.50 m 7.50 m
0.50 m
1.50 m 7.50 m
Horizontal force at bearing level in the longitudinal direction on unyielding supports and where no bearings
are provided
Refer Clause 211.5.1 IRC: 6-2014
i) i) Fh/2
= Maximum of or,
ii) ii) m x Rg
Where
Fh = Applied Horizontal force
Rg = Reaction at free end due to dead load and SIDL
Rq = Reaction at free end due to live load load
µ = Coefficent of Friction at movable bearing = 0.03 or 0.05 which ever govern
Fh (braking force)
For class 70R wheeled Fh = ( 0.2 x 100 ) = 20.00 t
For Class A 1 lane Fh = ( 0.2 x 55.4 ) = 11.08 t
For class A 2 lanes Fh = ( 0.2 x 55.4 ) + ( 0.05 x 55.4 ) = 13.85 t
For class A 3 lanes Fh = ( ( 0.2 x 55.4 ) + ( 0.05 x 55.4 x 2 ) x 0.9 ) = 14.96 t
For class 70R wheeled + Class A 1 Lane Fh = ((( 0.2 x 100 ) + ( 0.05 x 55.4 )) x 0.9 ) = 20.49 t
Reaction due to Dead Load and SIDL at free end of Left & Right span
Load description Left span Right span
Dead Load 206.00 t 206.00 t
SIDL 41.09 t 41.09 t
Rg 247.09 t 247.09 t
Reaction due to Live Load at fixed/free end of Left & Right span
Load description Left span Right span
Rq R11 R12 R21 R22
Maximum Reaction case 50.85 t 99.82 t 33.01 t 47.14 t
Minimum Reaction case 0.00 t 0.00 t 64.67 t 125.04 t
Maximum Moment case 0.00 t 0.00 t 129.48 t 64.67 t
For Design of Foundations Seismic Forces are increased by 35% (Cl. 219.8, IRC:6-2014) = 1.350
Design Horizontal Longitudinal seismic coeff., AhL = Ah'/R(Long.) = 0.108
Design Horizontal Transverse seismic coeff., AhT = Ah'/R(Trans.) = 0.164
Design Vertical Seismic Coefficient - Av= Av'/R(vert.) = 0.072
SEISMIC LONGITUDINAL :
Longitudinal seismic coefficent AhL = 0.108
Left span Right span
Description Weight ey MTT Weight ey MTT
tonne meter tm tonne meter tm
Total DL & SIDL (Vertical Load) 494.170 0.000 494.170 8.915
Seismic Component 0.000 53.370
Force Transferred to foundation 0.000 0.000 0.000 53.370 8.915 475.823
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.16
Left span Right span
Description Weight ey MLL Weight ey MLL
tonne meter tm tonne meter tm
Total DL & SIDL (Vertical Load) 247.085 8.915 247.085 8.915
Seismic Component 40.537 40.537
Force Transferred to foundation 40.537 8.915 361.406 40.537 8.915 361.406
SEISMIC VERTICAL :
Horizontal seismic coefficent AV = 0.072
Left span Right span
Description Weight eL MTT Weight eL MTT
tonne meter tm tonne meter tm
Total DL & SIDL (Vertical Load) 247.085 0.000 247.085 0.000
Seismic Component 17.790 17.790
Force Transferred to Pile 17.790 0.000 0.000 17.790 0.000 0.000
SEISMIC LONGITUDINAL :
Longitudinal seismic coefficent AhL = 0.080
Left span Right span
Description Weight ey MTT Weight ey MTT
tonne meter tm tonne meter tm
Total DL & SIDL (Vertical Load) 494.170 0.000 494.170 8.070
Seismic Component 0.000 39.534
Force Transferred to Pier 0.000 0.000 0.000 39.534 8.070 319.029
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.121526135
Left span Right span
Description Weight ey MLL Weight ey MLL
tonne meter tm tonne meter tm
Total DL & SIDL (Vertical Load) 247.085 8.070 247.085 8.070
Seismic Component 30.027 30.027
Force Transferred to Pier 30.027 8.070 242.315 30.027 8.070 242.315
SEISMIC VERTICAL :
Horizontal seismic coefficent AV = 0.053333333
Left span Right span
Description Weight eL MTT Weight eL MTT
tonne meter tm tonne meter tm
Total DL & SIDL (Vertical Load) 247.085 0.000 247.085 0.000
Seismic Component 13.178 13.178
Force Transferred to Pier 13.178 0.000 0.000 13.178 0.000 0.000
SEISMIC LONGITUDINAL :
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.16406
Maximum Reaction Case
Left span Right span
Description Weight ey Weight ey
tonne meter tonne meter
Live Load Reaction (20%) 15.910 2.700
Seismic Component Transferred to Pier 2.610 10.395 0.443 10.395
Total Horizontal force transferred to pier HT (including 20% Braking Force) = 3.873 t
Lever Arm above footing base = 10.40 m
Moment about TT axis MTT = 40.26 tm
Total Horizontal force transferred to pier HT (including 20% Braking Force) = 2.263 t
Lever Arm above footing base = 10.40 m
Moment about TT axis MTT = 23.52 tm
Total Horizontal force transferred to pier HT (including 20% Braking Force) = 4.21 t
Lever Arm above footing base = 10.40 m
Moment about TT axis MTT = 43.72 tm
SEISMIC VERTICAL :
Horizontal seismic coefficent AhT = 0.072
Maximum Reaction Case
Left span Right span
Description Weight eL eT Weight eL eT
tonne meter meter tonne meter meter
Live Load Reaction (20%) 15.91 2.700
Seismic Component Transferred to Pier 1.146 0.000 3.790 0.194 0.000 3.790
SEISMIC LONGITUDINAL :
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.122
Maximum Reaction Case
Left span Right span
Description Weight ey Weight ey
tonne meter tonne meter
Live Load Reaction (20%) 15.910 2.700
Seismic Component Transferred to Pier 1.934 9.195 0.328 9.195
SEISMIC VERTICAL :
Horizontal seismic coefficent AhT = 0.053
Maximum Reaction Case
Left span Right span
Description Weight eL eT Weight eL eT
tonne meter meter tonne meter meter
Live Load Reaction (20%) 15.91 2.700
Seismic Component Transferred to Pier 0.849 0.000 0.000 0.144 0.000 0.000
SEISMIC LONGITUDINAL :
Longitudinal seismic coefficent AhL = 0.108
Total weight of Sub-structure = 454.14 t
Seismic Component = 49.05 t
Lever arm above base slab = 5.22 m
Moment about T-T axis MTT = 256.2 tm
SEISMIC TRANSVERSE :
Longitudinal seismic coefficent AhT = 0.164
Total weight of Sub-structure = 454.14 t
Seismic Component = 74.51 t
Lever arm above base slab = 5.22 m
Moment about L-L axis MLL = 389.2 tm
SEISMIC VERTICAL :
Longitudinal seismic coefficent AV = 0.072
Total weight of Sub-structure = 454.14 t
Seismic Component = 32.70 t
Lever arm along LL axis = 0.00 m
Lever arm along TT axis = 0.00 m
Moment about L-L axis MLL = 0.00 tm
Moment about T-T axis MTT = 0.00 tm
SEISMIC LONGITUDINAL :
Longitudinal seismic coefficent AhL = 0.080
Total weight of Sub-structure = 273.24 t
Seismic Component = 21.86 t
Lever arm above base slab = 4.70 m
Moment about T-T axis MTT = 102.73 tm
SEISMIC TRANSVERSE :
Longitudinal seismic coefficent AhT = 0.122
Total weight of Sub-structure = 273.24 t
Seismic Component = 33.21 t
Lever arm above base slab = 4.70 m
Moment about L-L axis MLL = 156.06 tm
SEISMIC VERTICAL :
Longitudinal seismic coefficent AV = 0.053
Total weight of Sub-structure = 273.24 t
Seismic Component = 14.57 t
Lever arm along LL axis = 0.00 m
Lever arm along TT axis = 0.00 m
Moment about L-L axis MLL = 0.00 tm
Moment about T-T axis MTT = 0.00 tm
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.164
Total weight of Sub-structure = 119.56 t
SEISMIC VERTICAL :
Horizontal seismic coefficent Av = 0.072
Total weight of Sub-structure = 119.56 t
Dimension K Value
Component Type
Trans Long. Long. dirn Trans. dirn
Pier Rect 18 0.80 1.5 1.5
Foundation Rect 18 4.2 1.5 1.5
0 Rect 0 0 0 0
Pressure diagram
Forces Up to Foundation
Variation in water current direction = 20 o
Total force Forces in
Units
In Transverse Direction Longitudinal Transverse
Forces over pier shaft
Pressure intensity at HFL t/m2 0.593 0.203 0.557
2
Pressure intensity at Pier shaft bottom t/m -0.121 -0.042 -0.114
2
Obstracted area m 4.881 109.818 4.881
Total Force up to foundation t 1.151 8.859 1.082
Lever arm above foundation m 5.791 5.791 5.791
Total force at foundation t 1.151 8.859 1.082
Moment at pile cap ottom tm 6.667 51.302 6.264
For Design of Foundations Seismic Forces are increased by 25% (Cl. 219.8, IRC:6-2014) = 1.350
Design Horizontal Longitudinal seismic coeff., AhL = Ah'/R(Long.) = 0.108
Design Horizontal Transverse seismic coeff., AhT = Ah'/R(Trans.) = 0.324
Design Vertical Seismic Coefficient - Av= Av'/R(vert.) = 0.072
SEISMIC LONGITUDINAL :
Longitudinal seismic coefficent AhL = 0.108
Left span Right span
Seis Seis Comp.
Description Weight Comp. Hl ey MTT Weight ey MTT
Hl
tonne tonne meter tm tonne tonne meter tm
Total weight of DL & SIDL 494.17 0.00 0.00 0.00 494.17 53.37 8.92 475.82
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.324
Left span Right span
Seis Seis Comp.
Description Weight ey MLL Weight ey MLL
Comp. Hl Hl
tonne tonne meter tm tonne tonne meter tm
Total weight of DL & SIDL 247.09 80.06 8.92 713.73 247.09 80.06 8.92 713.73
SEISMIC VERTICAL :
Reaction due to DL & SIDL @ Pile cap bottom
Left span Right span
Description V MTT MLL V MTT MLL
tonne tm tm tonne tm tm
Total Super-Structure DL 206.00 92.70 0.00 206.00 92.70 0.00
Total Super-Structure SIDL 27.23 0.00 0.00 27.23 0.00 0.00
Total Wearing Coat 13.86 0.00 0.00 13.86 0.00 0.00
Total 247.09 92.70 0.00 247.09 92.70 0.00
Horizontal seismic coefficent AV = 0.072
Right span
At Fixed End, Force about pile cap V HL HT ey MLL MTT
bottom t t t m tm tm
Seismic Longitudinal 53.370 8.915 475.823
Seismic Transverse 80.056 8.915 713.735
Seismic Vertical 17.7901 0.000 6.674
SEISMIC LONGITUDINAL :
Longitudinal seismic coefficent AhL = 0.080
Left span Right span
Seis Seis Comp.
Description Weight Comp. Hl ey MTT Weight ey MTT
Hl
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.122
Left span Right span
Seis Seis Comp.
Description Weight Comp. Hl ey MLL Weight ey MLL
Hl
SEISMIC VERTICAL :
Reaction due to DL & SIDL @ Pile cap top
Left span Right span
Description V MTT MLL V MTT MLL
tonne tm tm tonne tm tm
Total Super-Structure DL 206.00 92.70 0.00 206.00 92.70 0.00
Total Super-Structure SIDL 27.23 0.00 0.00 27.23 0.00 0.00
Total Wearing Coat 13.86 0.00 0.00 13.86 0.00 0.00
Total 247.09 92.70 0.00 247.09 92.70 0.00
Horizontal seismic coefficent AV = 0.053
Right span
At Fixed End, Force about pile cap V HL HT ey MLL MTT
bottom t t t m tm tm
Seismic Longitudinal 39.534 8.045 318.031
Seismic Transverse 30.027 8.045 241.557
Seismic Vertical 13.1779 0.000 4.944
SEISMIC LONGITUDINAL :
No Live Load seismic component is considered in longitudinal direction
* 20% of braking force is considered
Fh = 20.49 x 1 = 20.49 t
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.324
Maximum Live Load Reaction Case : Left span Right span
Maximum Live Load reaction (20%) 15.910 2.700
Seismic Component HT 5.155 0.875
Lever arm above base slab 10.395 10.395
Moment about LL axis MLL 53.585 9.095
SEISMIC VERTICAL :
Vertical seismic coefficent AV = 0.072
Maximum Live Load Reaction Case : Left span Right span
Maximum Live Load reaction(20%) 15.91 t 2.70 t
Seismic Component 1.15 t 0.19 t
MLL 21.71 tm 3.68 tm
MTT 0.00 tm 0.00 tm
Right Span
At Fixed/ Free End V HL HT ey MLL MTT
t t t m tm tm
Seismic Longitudinal 20.493 10.395 23.007
Seismic Transverse 0.875 10.395 9.095
Seismic Vertical 0.194 3.684 0.000
Right Span
At Fixed/ Free End V HL HT ey MLL MTT
t t t m tm tm
Seismic Longitudinal 20.49 t 10.395 23.007
Seismic Transverse 2.850 10.395 29.621
Seismic Vertical 0.633 8.549 0.000
Right span
At Fixed/ Free End V HL HT ey MLL MTT
t t t m tm tm
Seismic Longitudinal 20.493 10.395 23.007
Seismic Transverse 6.687 10.395 69.512
Seismic Vertical 1.486 28.161 0.000
SEISMIC LONGITUDINAL :
No Live Load seismic component is considered in longitudinal direction
* 20% of braking force is considered
Fh = 20.49 x 1 = 20.49 t
SEISMIC TRANSVERSE :
Horizontal seismic coefficent AhT = 0.121526
Maximum Live Load Reaction Case : Left span Right span
Maximum Live Load reaction 79.55 t 13.50 t
Seismic Component HT 9.67 t 1.64 t
Lever arm above base slab 9.20 m 9.20 m
Moment about LL axis MLL 88.89 tm 15.09 tm
SEISMIC VERTICAL :
Vertical seismic coefficent AV = 0.053333
Maximum Live Load Reaction Case : Left span Right span
Maximum Live Load reaction 79.55 t 13.50 t
Seismic Component 4.24 t 0.72 t
MLL 16.08 tm 2.73 tm
MTT 0.00 tm 0.00 tm
Right Span
At Fixed/ Free End V HL HT ey MLL MTT
t t t m tm tm
Seismic Longitudinal 20.493 9.195 15.075
Seismic Transverse 1.641 9.195 15.087
Seismic Vertical 0.720 2.729 0.000
Right span
At Fixed/ Free End V HL HT ey MLL MTT
t t t m tm tm
Seismic Longitudinal 20.493 9.195 15.075
Seismic Transverse 12.541 9.195 115.315
Seismic Vertical 5.504 20.860 0.000
SEISMIC TRANSVERSE :
Horizontal seismic coefficent, AhT 0.122 0.324
Total weight of Sub-structure 273.24 t 454.14 t
Seismic Component HT 33.21 t 147.14 t
Lever arm above base slab 4.70 m 0.52 m
Moment about LL axis MLL 156.06 tm 77.08 tm
SEISMIC VERTICAL :
Horizontal seismic coefficent, Av 0.053 0.072
Total weight of Sub-structure 273.24 t 454.14 t
Seismic Component 14.57 t 32.70 t
Lever arm along LL axis 0.00 m 0.00 m
Lever arm along TT axis 0.00 m 0.00 m
Moment about LL axis MLL 0.00 tm 0.00 tm
Moment about TT axis MTT 0.00 tm 0.00 tm
SUMMARY OF FORCES
for Pier Shaft Design
Forces about toe
S.N. Description V HL HT MLL MTT
tonne tonne tonne tm tm
NORMAL CASE
1) Sub-structure & Foundation 273.240 0.000 0.000
2) Earth fill 0.000 0.000 0.000
Permanent Loads from left span
3) Super-structure DL Left span 206.000 0.000 92.700
4) SIDL Left span 27.225 0.000 0.000
5) Wearing Coat 13.860 0.000 0.000
Permanent Loads from Right span
3) Super-structure DL right span 206.000 0.000 92.700
4) SIDL Right span 27.225 0.000 0.000
5) Wearing Coat 13.860 0.000 0.000
5) Live Load Reaction
Maximum Reaction Case
5.1) Maximum Reaction Live Load Left Span 99.816 378.311 0.000
5.2) Maximum Reaction Live Load Right Span 33.010 125.110 0.000
Minimum Reaction Case
5.1) Minimum Reaction Live Load Left Span 0.000 0.000 0.000
5.2) Minimum Reaction Live Load Right Span 64.667 174.601 0.000
Maximum Longitudinal Moment Case
Maximum Longitudinal Moment Live Load Left
5.1) 0.000 0.000 0.000
Span
Maximum Longitudinal Moment Live Load
5.2) 129.480 490.740 0.000
Right Span
6) Live load longitudinal forces (Braking Force)
6.1) LL Longitudinal Force Maximum Reaction Case 27.431 260.046
6.2) LL Longitudinal Force Minimum Reaction Case 4.942 46.847
6.3) LL Longitudinal force Maximum Moment Case 25.435 241.121
6.4) Longitudinal force No Live Load Condition 4.942 46.847
Longitudinal Force Left Span Dislodge
6.5) 12.354 117.118
Condition
7) Buoyancy LWL 0
HFL -98.172
8) Water current forces
8.1) Water Current 100 % in transverse direction 0.185 6.157
8.2) Water Current at 20% variation 7.442 0.174 50.556 5.786
SEISMIC CASE
9) LWL
9.1) Longitudinal Seismic Effect
Sub Structure 21.859 102.734
DL + SIDL + Surfacing Component 39.534 319.029
Live Load
Maximum Reaction Case 20.493 188.433
Minimum Reaction Case 20.493 188.433
Maximum Moment Case 20.493 188.433
α α
MEDT MEDL
+ ≤ 1
T As4 T= MRDT MRDL
As4 18000.00
As3 fck = 35.00 Mpa
L fcd = 15.75 Mpa
fyd = 400 Mpa
2
Ac = 14400000.00 mm
As = 120755.0 mm2
As2
L= 800
Ac = 14400000 mm2
As1 As = 120755 mm2
fcd = 15.75 Mpa
fyd = 400 Mpa
Slenderness criteria
T As4 Moment of Inertia about TT axis
ITT = 7.68E+11 mm4
As3 L T= Moment of Inertia about LL axis
18000 ILL = 3.89E+14 mm4
Radius of gyration along LL axis
iL = √ ( ITT /A )
= 230.940 mm
As2 Radius of gyration along TT axis
iT = √ ( ILL /A )
= 5196.152 mm
L= 800
Check
λL / λT = 13.696 > 2.000 Check for limiting slenderness ratio
And λT / λL = 0.073 < 2.000 Ignore second order effect
3/2 1/2
As2 νmin = 0.031 k fck = 0.337
0.33
VRdc = Max ( 0.12 K (80 ρ1 fck ) + 0.15 σcp ) bw d
(νmin +0.15σcp ) bw d
L= 800
Max Shear Capacity
fck = 35.00 Mpa ν = 0.6 * ( 1- fck /310) = 0.5323
fcd = 15.75 Mpa
fyk = 500 Mpa VRdc, max = 0.5 bw d ν fcd = 6035.81 Tonne
Ac = 14400000 mm2
As = 120755 mm2
Ac = 14400000 mm2
As1 As = 120754.9676 mm2
fcd = 15.75 Mpa
fyd = 400 Mpa
T
As4 T= Slenderness criteria
18000 Moment of Inertia about TT axis
L ITT = 7.68E+11 mm4
As3 Moment of Inertia about LL axis
ILL = 3.89E+14 mm4
Radius of gyration along LL axis
As2 iL = √ ( ITT /A )
= 230.940 mm
Radius of gyration along TT axis
L= 800 iT = √ ( ILL /A )
= 5196.152 mm
LOAD COMBINATION
SERVICEABILITY LIMIT STATE
As1
T
As4 T=
As3 18000
L
As2
L= 800
V HL HT MLL MTT
S.No. Load Combinations
tonne tonne tonne tm tm
Quasi-permanent Combination
1 LWL 752.684 7.442 0.358 56.713 191.186
Quasi-permanent Combination
2 HFL 752.684 7.442 0.358 56.713 191.186
Rare Combination (LWL)
3 1) Max Reaction 788.492 28.015 0.358 434.279 386.221
4 2) Min Reaction 737.373 11.148 0.358 187.664 226.322
5 3) Max Long. Moment 785.982 26.518 0.358 424.768 372.027
Rare Combination (HFL)
6 1) Max Reaction 788.492 116.008 0.358 434.279 504.616
7 2) Min Reaction 737.373 99.141 0.358 187.664 344.717
8 3) Max Long. Moment 785.982 114.511 0.358 424.768 490.422
Rare Combination (LWL) (Span Dislodged Case) with Earth Pressure
9 1) 688.872 0.000 0.000 0.000 185.400
Rare Combination (HFL) (Span Dislodged Case) with Earth Pressure
10 1) 574.060 79.529 0.299 47.261 257.985
2 3 Section Dimension
As1 D = 800 mm
B = 18000 mm
Material Properties
As3 fck = 35 N/mm2
As4 17875 fyk = 500 N/mm2
Es = 200000 N/mm2
T T = 18000
Maximum permissible stress in concrete
Rare Combination 16.8 MPa
Quasi-permanent Combination 12.6 MPa
Φ NA xu
Reinforcement Details:
Eff As per
Dia Spacing Cover No.s Spacing Total As From To
Reinf. Cover Unit
mm mm mm mm No.s mm mm2 L T L T mm2/mm
As1 25 100 50 207 4 122.67 1963.50 207 17875 575 17875 3
As2 25 100 50 207 4 122.67 1963.50 207 62.5 575 62.5 3
25 150 50 62.5 119 150.95 58413.99 62.5 62.5 62.5 17875 3
As3
0 150 107 62.5 119 150.95 0.00 62.5 62.5 62.5 17875 0
25 150 50 62.5 119 150.95 58413.99 62.5 62.5 62.5 17875 3
As4
0 150 107 62.5 119 150.95 0.00 62.5 62.5 62.5 17875 0
Equivalent Modulus of Elasticity for Rare Combination: Ec,eq = Ecm*(MQP+MST) = 21404 MPa
= MST +(1+Φ)* MQP
2.5(h-d) = 0.563 m
hc,eff = Min h-x/3 = 0.800 m
h/2 = 0.400 m
Here, h = 0.800 m
d = 0.575 m Therefore, hc,eff = 400.00 mm
x = 0.000 m
σsc = 9.3006
Ac eff = 320000 mm2
ρp,eff = 0.1117
Maximum Cracking Space (Sr, max) = 3.4 c + 0.17 φ / ρp,eff = 208.04 mm
Es = 200000 Mpa
Ecm' = 16000 Mpa (For long term loading)
αc = 12.500
kt = 0.5 (Factor dependent on duration of load)
εsm - εcm = 0.000028
wk = Sr, max ( εsm - εcm ) = 0.006 mm < 0.3 mm OK
L 87.81 L 0.8
O
Taking transformed area of steel as (m-1)As , both in tensile and compressive zones
Ordinates of CGeff wrt the physical centroid:(take moments of effective area about TT and LL axes
respectively).
Ieff T = 220.972 m4
Ieff L = -1.7944 m4
Ieff LT = -0.3895 m4
SUMMARY OF FORCES
for Open Foundation
Forces about toe
S.N. Description V HL HT MLL MTT
tonne tonne tonne tm tm
NORMAL CASE
1) Sub-structure & Foundation 454.140 0.000 0.000
2) Earth fill 119.556 0.000 0.000
Permanent Loads from left span
3) Super-structure DL Left span 206.000 0.000 92.700
4) SIDL Left span 27.225 0.000 0.000
5) Wearing Coat 13.860 0.000 0.000
Permanent Loads from Right span
3) Super-structure DL right span 206.000 0.000 92.700
4) SIDL Right span 27.225 0.000 0.000
5) Wearing Coat 13.860 0.000 0.000
5) Live Load Reaction
Maximum Reaction Case
5.1) Maximum Reaction Live Load Left Span 99.816 378.311 0.000
5.2) Maximum Reaction Live Load Right Span 33.010 125.110 0.000
Minimum Reaction Case
5.1) Minimum Reaction Live Load Left Span 0.000 0.000 0.000
5.2) Minimum Reaction Live Load Right Span 64.667 174.601 0.000
Maximum Longitudinal Moment Case
Maximum Longitudinal Moment Live Load
5.1) 0.000 0.000 0.000
Left Span
Maximum Longitudinal Moment Live Load
5.2) 129.480 490.740 0.000
Right Span
6) Live load longitudinal forces (Braking Force)
6.1) LL Longitudinal Force Maximum Reaction Case 27.431 260.046
6.2) LL Longitudinal Force Minimum Reaction Case 4.942 46.847
6.3) LL Longitudinal force Maximum Moment Case 25.435 241.121
6.4) Longitudinal force No Live Load Condition 4.942 46.847
Longitudinal Force Left Span Dislodge
6.5) 12.354 117.118
Condition
7) Buoyancy LWL -61.0128
HFL -170.532
8) Water current forces
8.1) Water Current 100 % in transverse direction 0.185 6.157
8.2) Water Current at 20% variation 7.442 0.174 50.556 5.786
SEISMIC CASE
9) LWL
9.1) Longitudinal Seismic Effect
Sub Structure 49.047 256.207
Earthfill 12.912 0.000
DL + SIDL + Surfacing Component 53.370 475.823
Live Load
Maximum Reaction Case 4.099 42.605
Minimum Reaction Case 4.099 42.605
Maximum Moment Case 4.099 42.605
LOAD COMBINATION
This Combination is for Base Pressure Check
Load at foundation
Load Calculation for Foundation Checking - Combination 1
Combination 1_LWL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left Span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right Span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 99.816 0.000 0.000 378.311 0.000 1.00
LL from Right Span 33.010 0.000 0.000 125.110 0.000 1.00
Braking Force 0.000 27.431 0.000 0.000 260.046 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -61.013 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1139.68 34.873 0.358 560.134 451.232
Load at Foundation
Load Calculation for Foundation Checking - Combination 1
LWL (Span Dislodged Case)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.00
Braking Force 0.000 0.000 0.000 0.000 0.000 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -61.013 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 759.768 7.442 0.358 56.713 98.486
Load at Foundation
Load Calculation for Foundation Checking - Combination 1
HFL (Span Dislodged Case)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.00
Braking Force 0.000 0.000 0.000 0.000 0.000 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -170.532 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 650.249 7.442 0.358 56.713 98.486
Load at Foundation
Load Calculation for Foundation Checking - Combination 2
Combination 2_LWL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left Span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right Span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 99.816 0.000 0.000 378.311 0.000 1.00
LL from Right Span 33.010 0.000 0.000 125.110 0.000 1.00
Braking Force 0.000 27.431 0.000 0.000 260.046 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -61.013 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1139.679 34.873 0.358 560.134 451.232
Load at Foundation
Load Calculation for Foundation Checking - Combination 2
Combination 2_HFL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 99.816 0.000 0.000 378.311 0.000 1.00
LL from Right Span 33.010 0.000 0.000 125.110 0.000 1.00
Braking Force 0.000 27.431 0.000 0.000 260.046 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -170.532 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1030.160 34.873 0.358 560.134 451.232
Load at Foundation
Load Calculation for Foundation Checking - Combination 2
LWL (Span Dislodged Case)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.00
Braking Force 0.000 0.000 0.000 0.000 0.000 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -61.013 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 759.768 7.442 0.358 56.713 98.486
Load at Foundation
Load Calculation for Foundation Checking - Combination 2
HFL (Span Dislodged Case)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.00
Braking Force 0.000 0.000 0.000 0.000 0.000 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -170.532 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 650.249 7.442 0.358 56.713 98.486
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Longitudinal (LWL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 19.963 0.000 0.000 75.662 0.000 1.00
LL from Right Span 6.602 0.000 0.000 25.022 0.000 1.00
Braking Force 0.000 5.486 0.000 0.000 52.009 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -61.013 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 49.047 0.000 0.000 256.207 1.00
Earth fill Over Pile Cap 0.000 12.912 0.000 0.000 0.000 1.00
DL + SIDL + Surfacing Component 0.000 53.370 0.000 0.000 475.823 1.00
Braking Force 0.000 20.493 0.000 0.000 23.007 1.00
Seismic Transverse
Sub Structure 0.000 0.000 22.352 116.759 0.000 0.30
Earth fill Over Pile Cap 0.000 0.000 5.884 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 0.000 24.322 216.844 0.000 0.30
Live Load 0.000 0.000 0.916 9.522 0.000 0.30
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.970 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.402 0.000 0.000 0.000 1.524 0.30
Total 1056.886 141.309 53.474 443.809 996.939
Seismic Transverse
Sub Structure 0.000 0.000 22.352 116.759 0.000 0.30
Earth fill Over Pile Cap 0.000 0.000 5.884 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 0.000 24.322 216.844 0.000 0.30
Live Load 0.000 0.000 1.016 10.559 0.000 0.30
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.970 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.190 0.000 0.000 0.000 0.720 0.30
Total 1043.042 136.811 53.574 379.082 953.496
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Transverse (LWL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 19.963 0.000 0.000 75.662 0.000 1.00
LL from Right Span 6.602 0.000 0.000 25.022 0.000 1.00
Braking Force 0.000 5.486 0.000 0.000 52.009 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -61.013 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 14.714 0.000 0.000 76.862 0.30
Earth fill Over Pile Cap 0.000 3.874 0.000 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 16.011 0.000 0.000 142.747 0.30
Seismic Transverse
Sub Structure 0.000 0.000 74.506 389.197 0.000 1.00
Earth fill Over Pile Cap 0.000 0.000 19.614 0.000 0.000 1.00
DL + SIDL + Surfacing Component 0.000 0.000 81.074 722.812 0.000 1.00
Live Load 0.000 0.000 3.053 31.739 0.000 1.00
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.970 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.402 0.000 0.000 0.000 1.524 0.30
Total 1056.886 40.085 178.248 1244.432 461.511
Seismic Transverse
Sub Structure 0.000 0.000 74.506 389.197 0.000 1.00
Earth fill Over Pile Cap 0.000 0.000 19.614 0.000 0.000 1.00
DL + SIDL + Surfacing Component 0.000 0.000 81.074 722.812 0.000 1.00
Live Load 0.000 0.000 3.386 35.198 0.000 1.00
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.970 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.190 0.000 0.000 0.000 0.720 0.30
Total 1043.042 35.587 178.580 1182.128 418.068
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Vertical (LWL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 19.963 0.000 0.000 75.662 0.000 1.00
LL from Right Span 6.602 0.000 0.000 25.022 0.000 1.00
Braking Force 0.000 5.486 0.000 0.000 52.009 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -61.013 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 14.714 0.000 0.000 76.862 0.30
Earth fill Over Pile Cap 0.000 3.874 0.000 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 16.011 0.000 0.000 142.747 0.30
Seismic Transverse
Sub Structure 0.000 0.000 22.352 116.759 0.000 0.30
Earth fill Over Pile Cap 0.000 0.000 5.884 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 0.000 24.322 216.844 0.000 0.30
Live Load 0.000 0.000 0.916 9.522 0.000 0.30
Seismic Vertical
Sub Structure 32.698 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 8.608 0.000 0.000 0.000 9.899 1.00
DL + SIDL + Surfacing Component 35.580 0.000 0.000 0.000 0.000 1.00
Live Load 1.340 0.000 0.000 0.000 5.079 1.00
Total 1111.645 40.085 53.474 443.809 471.996
Seismic Transverse
Sub Structure 0.000 0.000 22.352 116.759 0.000 0.30
Earth fill Over Pile Cap 0.000 0.000 5.884 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 0.000 24.322 216.844 0.000 0.30
Live Load 0.000 0.000 1.016 10.559 0.000 0.30
Seismic Vertical
Sub Structure 32.698 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 8.608 0.000 0.000 0.000 9.899 1.00
DL + SIDL + Surfacing Component 35.580 0.000 0.000 0.000 0.000 1.00
Live Load 0.633 0.000 0.000 0.000 2.400 1.00
Total 1097.306 35.587 53.574 379.082 426.678
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Longitudinal (HFL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 19.963 0.000 0.000 75.662 0.000 1.00
LL from Right Span 6.602 0.000 0.000 25.022 0.000 1.00
Braking Force 0.000 5.486 0.000 0.000 52.009 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -170.532 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Hydrodynamic forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 49.047 0.000 0.000 256.207 1.00
Earth fill Over Pile Cap 0.000 12.912 0.000 0.000 0.000 1.00
DL + SIDL + Surfacing Component 0.000 53.370 0.000 0.000 475.823 1.00
Braking Force 0.000 20.493 0.000 0.000 23.007 1.00
Seismic Transverse
Sub Structure 0.000 0.000 22.352 116.759 0.000 0.30
Earth fill Over Pile Cap 0.000 0.000 5.884 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 0.000 24.322 216.844 0.000 0.30
Live Load 0.000 0.000 0.916 9.522 0.000 0.30
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.970 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.402 0.000 0.000 0.000 1.524 0.30
Total 947.367 141.309 53.474 443.809 996.939
Seismic Transverse
Sub Structure 0.000 0.000 22.352 116.759 0.000 0.30
Earth fill Over Pile Cap 0.000 0.000 5.884 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 0.000 24.322 216.844 0.000 0.30
Live Load 0.000 0.000 0.916 9.522 0.000 0.30
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.970 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.402 0.000 0.000 0.000 1.524 0.30
Total 933.735 136.811 53.474 378.044 954.299
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Transverse (HFL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 19.963 0.000 0.000 75.662 0.000 1.00
LL from Right Span 6.602 0.000 0.000 25.022 0.000 1.00
Braking Force 0.000 5.486 0.000 0.000 52.009 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -170.532 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Hydrodynamic forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 14.714 0.000 0.000 76.862 0.30
Earth fill Over Pile Cap 0.000 3.874 0.000 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 16.011 0.000 0.000 142.747 0.30
Seismic Transverse
Sub Structure 0.000 0.000 74.506 389.197 0.000 1.00
Earth fill Over Pile Cap 0.000 0.000 19.614 0.000 0.000 1.00
DL + SIDL + Surfacing Component 0.000 0.000 81.074 722.812 0.000 1.00
Live Load 0.000 0.000 3.053 31.739 0.000 1.00
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.970 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.402 0.000 0.000 0.000 1.524 0.30
Total 947.367 40.085 178.248 1244.432 461.511
Seismic Transverse
Sub Structure 0.000 0.000 74.506 389.197 0.000 1.00
Earth fill Over Pile Cap 0.000 0.000 19.614 0.000 0.000 1.00
DL + SIDL + Surfacing Component 0.000 0.000 81.074 722.812 0.000 1.00
Live Load 0.000 0.000 3.386 35.198 0.000 1.00
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.970 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.190 0.000 0.000 0.000 0.720 0.30
Total 933.523 40.085 178.580 1182.128 460.708
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Vertical (HFL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 19.963 0.000 0.000 75.662 0.000 1.00
LL from Right Span 6.602 0.000 0.000 25.022 0.000 1.00
Braking Force 0.000 5.486 0.000 0.000 52.009 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -170.532 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 14.714 0.000 0.000 76.862 0.30
Earth fill Over Pile Cap 0.000 3.874 0.000 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 16.011 0.000 0.000 142.747 0.30
Seismic Transverse
Sub Structure 0.000 0.000 22.352 116.759 0.000 0.30
Earth fill Over Pile Cap 0.000 0.000 5.884 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 0.000 24.322 216.844 0.000 0.30
Live Load 0.000 0.000 0.916 9.522 0.000 0.30
Seismic Vertical
Sub Structure 32.698 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 8.608 0.000 0.000 0.000 9.899 1.00
DL + SIDL + Surfacing Component 35.580 0.000 0.000 0.000 0.000 1.00
Live Load 1.340 0.000 0.000 0.000 5.079 1.00
Total 1002.125 40.085 53.474 443.809 471.996
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Span Dislodged Case
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 77.250 1.00
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.00
Braking Force 0.000 0.000 0.000 0.000 0.000 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -170.532 0.000 0.000 0.000 0.000 1.00
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Hydrodynamic forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 49.047 0.000 0.000 213.506 1.00
Earth fill Over Pile Cap 0.000 12.912 0.000 0.000 0.000 1.00
DL + SIDL + Surfacing Component 0.000 53.370 0.000 0.000 396.519 1.00
Seismic Transverse
Sub Structure 0.000 0.000 22.352 116.759 0.000 0.30
Earth fill Over Pile Cap 0.000 0.000 5.884 0.000 0.000 0.30
DL + SIDL + Surfacing Component 0.000 0.000 24.322 216.844 0.000 0.30
Live Load 0.000 0.000 0.000 0.000 0.000 0.30
Seismic Vertical
Sub Structure 9.809 0.000 0.000 0.000 0.000 0.30
Earth fill Over Pile Cap 2.582 0.000 0.000 0.000 2.475 0.30
DL + SIDL + Surfacing Component 10.674 0.000 0.000 0.000 0.000 0.30
Live Load 0.000 0.000 0.000 0.000 0.000 0.30
Total 673.315 115.330 52.558 333.603 689.75
LOAD COMBINATION
(For Structural Design of Foundation)
Load at Foundation
Load Calculation for Foundation Checking - Combination 1
LWL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left Span 314.854 0.000 0.000 0.000 125.145 1.35
DL + SIDL from Right Span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 24.255 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 149.724 0.000 0.000 567.466 0.000 1.50
LL from Right Span 49.515 0.000 0.000 187.666 0.000 1.50
Braking Force 0.000 41.147 0.000 0.000 390.069 1.50
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 179.334 0.000 0.000 0.000 0.000 1.50
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1660.73 48.589 0.358 811.845 646.145
Load at Foundation
Load Calculation for Foundation Checking - Combination 1
HFL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 314.854 0.000 0.000 0.000 125.145 1.35
DL + SIDL from Right span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 24.255 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 149.724 0.000 0.000 567.466 0.000 1.50
LL from Right Span 49.515 0.000 0.000 187.666 0.000 1.50
Braking Force 0.000 41.147 0.000 0.000 390.069 1.50
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 179.334 0.000 0.000 0.000 0.000 1.50
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1644.30 48.589 0.358 811.845 646.145
Load at Foundation
Load Calculation for Foundation Checking - Combination 1
LWL (Span Dislodged Case)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.35
DL + SIDL from Right span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.50
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.50
Braking Force 0.000 0.000 0.000 0.000 0.000 1.50
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 179.334 0.000 0.000 0.000 0.000 1.50
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1122.380 7.442 0.358 56.713 130.931
Load at Foundation
Load Calculation for Foundation Checking - Combination 1
HFL (Span Dislodged Case)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.35
DL + SIDL from Right span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.50
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.50
Braking Force 0.000 0.000 0.000 0.000 0.000 1.50
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 179.334 0.000 0.000 0.000 0.000 1.50
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1105.952 7.442 0.358 56.713 130.931
Load at Foundation
Load Calculation for Foundation Checking - Combination 2
LWL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left Span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right Span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 129.761 0.000 0.000 491.804 0.000 1.30
LL from Right Span 42.913 0.000 0.000 162.644 0.000 1.30
Braking Force 0.000 35.660 0.000 0.000 338.060 1.30
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 155.423 0.000 0.000 0.000 0.000 1.30
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1267.254 43.103 0.358 711.161 529.246
Load at Foundation
Load Calculation for Foundation Checking - Combination 2
HFL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 129.761 0.000 0.000 491.804 0.000 1.30
LL from Right Span 42.913 0.000 0.000 162.644 0.000 1.30
Braking Force 0.000 35.660 0.000 0.000 338.060 1.30
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 155.423 0.000 0.000 0.000 0.000 1.30
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1250.826 43.103 0.358 711.161 529.246
Load at Foundation
Load Calculation for Foundation Checking - Combination 2
LWL (Span Dislodged Case)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.30
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.30
Braking Force 0.000 0.000 0.000 0.000 0.000 1.30
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 155.423 0.000 0.000 0.000 0.000 1.30
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 847.496 7.442 0.358 56.713 98.486
Load at Foundation
Load Calculation for Foundation Checking - Combination 2
HFL (Span Dislodged Case)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.30
LL from Right Span 0.000 0.000 0.000 0.000 0.000 1.30
Braking Force 0.000 0.000 0.000 0.000 0.000 1.30
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 155.423 0.000 0.000 0.000 0.000 1.30
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 831.068 7.442 0.358 56.713 98.486
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Longitudinal (LWL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 314.854 0.000 0.000 0.000 125.145 1.35
DL + SIDL from Right span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 24.255 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 14.972 0.000 0.000 56.747 0.000 0.75
LL from Right Span 4.951 0.000 0.000 18.767 0.000 0.75
Braking Force 0.000 4.115 0.000 0.000 39.007 0.75
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 73.571 0.000 0.000 384.310 1.50
Earth fill Over Pile Cap 0.000 19.368 0.000 0.000 0.000 1.50
DL + SIDL + Surfacing Component 0.000 80.056 0.000 0.000 713.735 1.50
Braking Force 0.000 30.740 0.000 0.000 34.510 1.50
Seismic Transverse
Sub Structure 0.000 0.000 33.528 175.139 0.000 0.45
Earth fill Over Pile Cap 0.000 0.000 8.826 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 0.000 36.483 325.265 0.000 0.45
Live Load 0.000 0.000 1.374 14.282 0.000 0.45
Seismic Vertical
Sub Structure 14.714 0.000 0.000 0.000 0.000 0.45
Earth fill Over Pile Cap 3.874 0.000 0.000 0.000 4.455 0.45
DL + SIDL + Surfacing Component 16.011 0.000 0.000 0.000 0.000 0.45
Live Load 0.603 0.000 0.000 0.000 2.285 0.45
Total 1456.836 207.848 80.211 590.200 1428.59
Seismic Transverse
Sub Structure 0.000 0.000 33.528 175.139 0.000 0.45
Earth fill Over Pile Cap 0.000 0.000 8.826 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 0.000 36.483 325.265 0.000 0.45
Live Load 0.000 0.000 1.524 15.839 0.000 0.45
Seismic Vertical
Sub Structure 14.714 0.000 0.000 0.000 0.000 0.45
Earth fill Over Pile Cap 3.874 0.000 0.000 0.000 4.455 0.45
DL + SIDL + Surfacing Component 16.011 0.000 0.000 0.000 0.000 0.45
Live Load 0.285 0.000 0.000 0.000 1.080 0.45
Total 1446.294 204.475 80.361 542.433 1395.41
Seismic Transverse
Sub Structure 0.000 0.000 111.760 583.796 0.000 1.50
Earth fill Over Pile Cap 0.000 0.000 29.422 0.000 0.000 1.50
DL + SIDL + Surfacing Component 0.000 0.000 121.611 1084.218 0.000 1.50
Live Load 0.000 0.000 5.079 52.797 0.000 1.50
Seismic Vertical
Sub Structure 14.714 0.000 0.000 0.000 0.000 0.45
Earth fill Over Pile Cap 3.874 0.000 0.000 0.000 4.455 0.45
DL + SIDL + Surfacing Component 16.011 0.000 0.000 0.000 0.000 0.45
Live Load 0.285 0.000 0.000 0.000 1.080 0.45
Total 1446.294 52.640 267.871 1747.00 592.265
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Vertical (LWL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 314.854 0.000 0.000 0.000 125.145 1.35
DL + SIDL from Right span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 24.255 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 14.972 0.000 0.000 56.747 0.000 0.75
LL from Right Span 4.951 0.000 0.000 18.767 0.000 0.75
Braking Force 0.000 4.115 0.000 0.000 39.007 0.75
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 22.071 0.000 0.000 115.293 0.45
Earth fill Over Pile Cap 0.000 5.810 0.000 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 24.017 0.000 0.000 214.120 0.45
Seismic Transverse
Sub Structure 0.000 0.000 33.528 175.139 0.000 0.45
Earth fill Over Pile Cap 0.000 0.000 8.826 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 0.000 36.483 325.265 0.000 0.45
Live Load 0.000 0.000 1.374 14.282 0.000 0.45
Seismic Vertical
Sub Structure 49.047 0.000 0.000 0.000 0.000 1.50
Earth fill Over Pile Cap 12.912 0.000 0.000 0.000 14.849 1.50
DL + SIDL + Surfacing Component 53.370 0.000 0.000 0.000 0.000 1.50
Live Load 2.010 0.000 0.000 0.000 7.618 1.50
Total 1538.974 56.013 80.211 590.200 641.177
Seismic Transverse
Sub Structure 0.000 0.000 33.528 175.139 0.000 0.45
Earth fill Over Pile Cap 0.000 0.000 8.826 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 0.000 36.483 325.265 0.000 0.45
Live Load 0.000 0.000 1.524 15.839 0.000 0.45
Seismic Vertical
Sub Structure 49.047 0.000 0.000 0.000 0.000 1.50
Earth fill Over Pile Cap 12.912 0.000 0.000 0.000 14.849 1.50
DL + SIDL + Surfacing Component 53.370 0.000 0.000 0.000 0.000 1.50
Live Load 0.950 0.000 0.000 0.000 3.600 1.50
Total 1527.690 52.640 80.361 542.433 605.179
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Longitudinal (HFL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 314.854 0.000 0.000 0.000 125.145 1.35
DL + SIDL from Right span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 24.255 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 14.972 0.000 0.000 56.747 0.000 0.75
LL from Right Span 4.951 0.000 0.000 18.767 0.000 0.75
Braking Force 0.000 4.115 0.000 0.000 39.007 0.75
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Hydrodynamic forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 73.571 0.000 0.000 384.310 1.50
Earth fill Over Pile Cap 0.000 19.368 0.000 0.000 0.000 1.50
DL + SIDL + Surfacing Component 0.000 80.056 0.000 0.000 713.735 1.50
Braking Force 0.000 30.740 0.000 0.000 34.510 1.50
Seismic Transverse
Sub Structure 0.000 0.000 33.528 175.139 0.000 0.45
Earth fill Over Pile Cap 0.000 0.000 8.826 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 0.000 36.483 325.265 0.000 0.45
Live Load 0.000 0.000 1.374 14.282 0.000 0.45
Seismic Vertical
Sub Structure 14.714 0.000 0.000 0.000 0.000 0.45
Earth fill Over Pile Cap 3.874 0.000 0.000 0.000 4.455 0.45
DL + SIDL + Surfacing Component 16.011 0.000 0.000 0.000 0.000 0.45
Live Load 0.603 0.000 0.000 0.000 2.285 0.45
Total 1440.408 207.848 80.211 590.200 1428.592
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Transverse (HFL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 314.854 0.000 0.000 0.000 125.145 1.35
DL + SIDL from Right span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 24.255 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 14.972 0.000 0.000 56.747 0.000 0.75
LL from Right Span 4.951 0.000 0.000 18.767 0.000 0.75
Braking Force 0.000 4.115 0.000 0.000 39.007 0.75
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Hydrodynamic forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 22.071 0.000 0.000 115.293 0.45
Earth fill Over Pile Cap 0.000 5.810 0.000 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 24.017 0.000 0.000 214.120 0.45
Seismic Transverse
Sub Structure 0.000 0.000 111.760 583.796 0.000 1.50
Earth fill Over Pile Cap 0.000 0.000 29.422 0.000 0.000 1.50
DL + SIDL + Surfacing Component 0.000 0.000 121.611 1084.218 0.000 1.50
Live Load 0.000 0.000 4.580 47.608 0.000 1.50
Seismic Vertical
Sub Structure 14.714 0.000 0.000 0.000 0.000 0.45
Earth fill Over Pile Cap 3.874 0.000 0.000 0.000 4.455 0.45
DL + SIDL + Surfacing Component 16.011 0.000 0.000 0.000 0.000 0.45
Live Load 0.603 0.000 0.000 0.000 2.285 0.45
Total 1440.408 56.013 267.371 1791.13 625.450
Seismic Transverse
Sub Structure 0.000 0.000 111.760 583.796 0.000 1.50
Earth fill Over Pile Cap 0.000 0.000 29.422 0.000 0.000 1.50
DL + SIDL + Surfacing Component 0.000 0.000 121.611 1084.218 0.000 1.50
Live Load 0.000 0.000 5.079 52.797 0.000 1.50
Seismic Vertical
Sub Structure 14.714 0.000 0.000 0.000 0.000 0.45
Earth fill Over Pile Cap 3.874 0.000 0.000 0.000 4.455 0.45
DL + SIDL + Surfacing Component 16.011 0.000 0.000 0.000 0.000 0.45
Live Load 0.285 0.000 0.000 0.000 1.080 0.45
Total 1429.867 56.013 267.871 1747.00 624.245
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Vertical (HFL)
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 314.854 0.000 0.000 0.000 125.145 1.35
DL + SIDL from Right span 314.854 0.000 0.000 0.000 125.145 1.35
Wearing Coat From Left Span 24.255 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 24.255 0.000 0.000 0.000 0.000 1.75
LL from Left Span 14.972 0.000 0.000 56.747 0.000 0.75
LL from Right Span 4.951 0.000 0.000 18.767 0.000 0.75
Braking Force 0.000 4.115 0.000 0.000 39.007 0.75
Substructure and Pile Cap 613.089 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 22.071 0.000 0.000 115.293 0.45
Earth fill Over Pile Cap 0.000 5.810 0.000 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 24.017 0.000 0.000 214.120 0.45
Seismic Transverse
Sub Structure 0.000 0.000 33.528 175.139 0.000 0.45
Earth fill Over Pile Cap 0.000 0.000 8.826 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 0.000 36.483 325.265 0.000 0.45
Live Load 0.000 0.000 1.374 14.282 0.000 0.45
Seismic Vertical
Sub Structure 49.047 0.000 0.000 0.000 0.000 1.50
Earth fill Over Pile Cap 12.912 0.000 0.000 0.000 14.849 1.50
DL + SIDL + Surfacing Component 53.370 0.000 0.000 0.000 0.000 1.50
Live Load 2.010 0.000 0.000 0.000 7.618 1.50
Total 1522.546 56.013 80.211 590.200 641.177
Seismic Transverse
Sub Structure 0.000 0.000 33.528 175.139 0.000 0.45
Earth fill Over Pile Cap 0.000 0.000 8.826 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 0.000 36.483 325.265 0.000 0.45
Live Load 0.000 0.000 1.524 15.839 0.000 0.45
Seismic Vertical
Sub Structure 49.047 0.000 0.000 0.000 0.000 1.50
Earth fill Over Pile Cap 12.912 0.000 0.000 0.000 14.849 1.50
DL + SIDL + Surfacing Component 53.370 0.000 0.000 0.000 0.000 1.50
Live Load 0.950 0.000 0.000 0.000 3.600 1.50
Total 1511.262 56.013 80.361 542.433 637.159
Load at Foundation
Load Calculation for Foundation Checking - Seismic Combination
Seismic - Span Dislodged Case
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 0.000 0.000 0.000 0.000 0.000 1.35
DL + SIDL from Right span 262.378 0.000 0.000 0.000 104.288 1.35
Wearing Coat From Left Span 0.000 0.000 0.000 0.000 0.000 1.75
Wearing Coat From Right Span 20.213 0.000 0.000 0.000 0.000 1.75
LL from Left Span 0.000 0.000 0.000 0.000 0.000 0.75
LL from Right Span 0.000 0.000 0.000 0.000 0.000 0.75
Braking Force 0.000 0.000 0.000 0.000 0.000 0.75
Substructure and Pile Cap 510.907 0.000 0.000 0.000 0.000 1.35
Earth fill Over Pile Cap 99.630 0.000 0.000 0.000 0.000 1.00
Buoyancy -21.316 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 0.000 0.000 0.000 0.000 1.00
Hydrodynamic forces 0.000 0.000 0.000 0.000 0.000 1.00
Seismic Component
Seismic Longitudinal
Sub Structure 0.000 61.309 0.000 0.000 320.258 1.50
Earth fill Over Pile Cap 0.000 19.368 0.000 0.000 0.00 1.50
DL + SIDL + Surfacing Component 0.000 33.356 0.000 0.000 297.39 1.50
Seismic Transverse
Sub Structure 0.000 0.000 27.940 145.949 0.000 0.45
Earth fill Over Pile Cap 0.000 0.000 7.355 0.000 0.000 0.45
DL + SIDL + Surfacing Component 0.000 0.000 15.201 135.527 0.000 0.45
Live Load 0.000 0.000 0.000 0.000 0.000 0.45
Seismic Vertical
Sub Structure 12.262 0.000 0.000 0.000 0.000 0.45
Earth fill Over Pile Cap 3.228 0.000 0.000 0.000 3.712 0.45
DL + SIDL + Surfacing Component 6.671 0.000 0.000 0.000 0.000 0.45
Live Load 0.000 0.000 0.000 0.000 0.000 0.45
Total 893.973 114.033 50.497 281.476 725.65
LOAD COMBINATION
Quasi Permanent Combination Case
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
HFL
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1042.29 7.442 0.358 56.713 191.186
LOAD COMBINATION
Rare Combination Case
Load at Foundation
LWL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left Span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right Span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 99.816 0.000 0.000 378.311 0.000 1.00
LL from Right Span 33.010 0.000 0.000 125.110 0.000 1.00
Braking Force 0.000 27.431 0.000 0.000 260.046 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1191.54 34.873 0.358 560.134 451.232
2) Minimum Reaction Case
DL + SIDL from Left Span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right Span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 64.667 0.000 0.000 174.601 0.000 1.00
Braking Force 0.000 4.942 0.000 0.000 46.847 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1123.381 12.384 0.358 231.314 238.033
3) Maximum Longitudinal Moment Case
DL + SIDL from Left Span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right Span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 129.480 0.000 0.000 490.740 0.000 1.00
Braking Force 0.000 25.435 0.000 0.000 241.121 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -9.152 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1188.194 32.877 0.358 547.453 432.307
Load at Foundation
HFL
V HL HT MLL MTT
Loading Factors
tonne tonne tonne tm tm
1) Maximum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 99.816 0.000 0.000 378.311 0.000 1.00
LL from Right Span 33.010 0.000 0.000 125.110 0.000 1.00
Braking Force 0.000 27.431 0.000 0.000 260.046 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1175.11 34.873 0.358 560.134 451.232
2) Minimum Reaction Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 64.667 0.000 0.000 174.601 0.000 1.00
Braking Force 0.000 4.942 0.000 0.000 46.847 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1106.953 12.384 0.358 231.314 238.033
3) Maximum Longitudinal Moment Case
DL + SIDL from Left span 233.225 0.000 0.000 0.000 92.700 1.00
DL + SIDL from Right span 233.225 0.000 0.000 0.000 92.700 1.00
Wearing Coat From Left Span 13.860 0.000 0.000 0.000 0.000 1.00
Wearing Coat From Right Span 13.860 0.000 0.000 0.000 0.000 1.00
LL from Left Span 0.000 0.000 0.000 0.000 0.000 1.00
LL from Right Span 129.480 0.000 0.000 490.740 0.000 1.00
Braking Force 0.000 25.435 0.000 0.000 241.121 1.00
Substructure and Pile Cap 454.140 0.000 0.000 0.000 0.000 1.00
Earth fill Over Pile Cap 119.556 0.000 0.000 0.000 0.000 1.00
Buoyancy -25.580 0.000 0.000 0.000 0.000 0.15
Water current forces 0.000 7.442 0.358 56.713 5.786 1.00
Total 1171.766 32.877 0.358 547.453 432.307
Base Pressure
= P/ A ± MTT *x / ITT ± MLL *z / ILL
Sl.No. Forces about toe Base pressure at footing corners Pmax Pmin
V HL HT MTT MLL A B C D
t t t tm tm t/m2 t/m2 t/m2 t/m2 t/m3 t/m4
LC 1 1139.68 34.87 0.36 560.13 451.23 20.34 19.89 9.81 10.26 20.34 9.81 Combination 1_LWL1) Maximum Reaction Case
LC 2 1071.52 12.38 0.36 231.31 238.03 16.37 16.14 11.98 12.21 16.37 11.98 Combination 1_LWL2) Minimum Reaction Case
LC 3 1136.33 32.88 0.36 547.45 432.31 20.17 19.75 9.89 10.32 20.17 9.89 Combination 1_LWL3) Maximum Longitudinal Moment Case
LC 4 1030.16 34.87 0.36 560.13 451.23 18.89 18.45 8.37 8.81 18.89 8.37 Combination 1_ HFL1) Maximum Reaction Case
LC 5 962.00 12.38 0.36 231.31 238.03 14.92 14.69 10.53 10.76 14.92 10.53 Combination 1_ HFL2) Minimum Reaction Case
LC 6 1026.81 32.88 0.36 547.45 432.31 18.72 18.30 8.44 8.87 18.72 8.44 Combination 1_ HFL3) Maximum Longitudinal Moment Case
LC 7 759.77 7.44 0.36 56.71 98.49 10.61 10.51 9.49 9.59 10.61 9.49 LWL (Span Dislodged Case) 1) Maximum Reaction Case
LC 8 650.25 7.44 0.36 56.71 98.49 9.16 9.06 8.04 8.14 9.16 8.04 HFL (Span Dislodged Case)1) Maximum Reaction Case
LC 9 1139.68 34.87 0.36 560.13 451.23 20.34 19.89 9.81 10.26 20.34 9.81 Combination 2_LWL1) Maximum Reaction Case
LC 10 1071.52 12.38 0.36 231.31 238.03 16.37 16.14 11.98 12.21 16.37 11.98 Combination 2_LWL2) Minimum Reaction Case
LC 11 1136.33 32.88 0.36 547.45 432.31 20.17 19.75 9.89 10.32 20.17 9.89 Combination 2_LWL3) Maximum Longitudinal Moment Case
LC 12 1030.16 34.87 0.36 560.13 451.23 18.89 18.45 8.37 8.81 18.89 8.37 Combination 2_HFL1) Maximum Reaction Case
LC 13 962.00 12.38 0.36 231.31 238.03 14.92 14.69 10.53 10.76 14.92 10.53 Combination 2_HFL2) Minimum Reaction Case
LC 14 1026.81 32.88 0.36 547.45 432.31 18.72 18.30 8.44 8.87 18.72 8.44 Combination 2_HFL3) Maximum Longitudinal Moment Case
LC 15 759.77 7.44 0.36 56.71 98.49 10.61 10.51 9.49 9.59 10.61 9.49 LWL (Span Dislodged Case) 1) Maximum Reaction Case
LC 16 650.25 7.44 0.36 56.71 98.49 9.16 9.06 8.04 8.14 9.16 8.04 HFL (Span Dislodged Case)1) Maximum Reaction Case
LC 17 1056.89 141.31 53.47 443.81 996.94 18.46 17.49 9.50 10.47 18.46 9.50 Seismic - Longitudinal (LWL)1) Maximum Reaction Case
LC 18 1043.04 136.81 53.57 379.08 953.50 17.68 16.74 9.92 10.85 17.68 9.92 Seismic - Longitudinal (LWL)2) Minimum Reaction Case
LC 19 1056.26 140.91 53.57 442.31 993.32 18.44 17.47 9.51 10.48 18.44 9.51 Seismic - Longitudinal (LWL)3) Maximum Longitudinal Moment Case
LC 20 1056.89 40.09 178.25 1244.43 461.51 25.40 24.95 2.56 3.01 25.40 2.56 Seismic - Transverse (LWL)1) Maximum Reaction Case
Base Pressure
= P/ A ± MTT *x / ITT ± MLL *z / ILL
Sl.No. Forces about toe Base pressure at footing corners Pmax Pmin
V HL HT MTT MLL A B C D
t t t tm tm t/m2 t/m2 t/m2 t/m2 t/m3 t/m4
LC 21 1043.04 35.59 178.58 1182.13 418.07 24.64 24.23 2.95 3.36 24.64 2.95 Seismic - Transverse (LWL)2) Minimum Reaction Case
LC 22 1056.26 39.69 178.58 1245.36 457.89 25.40 24.95 2.54 2.99 25.40 2.54 Seismic - Transverse (LWL)3) Maximum Longitudinal Moment Case
LC 23 1111.64 40.09 53.47 443.81 472.00 18.93 18.47 10.48 10.94 18.93 10.48 Seismic - Vertical (LWL)1) Maximum Reaction Case
LC 24 1097.31 35.59 53.57 379.08 426.68 18.13 17.72 10.89 11.31 18.13 10.89 Seismic - Vertical (LWL)2) Minimum Reaction Case
LC 25 1111.12 35.59 53.57 442.31 429.91 18.89 18.47 10.51 10.93 18.89 10.51 Seismic - Vertical (LWL)3) Maximum Longitudinal Moment Case
LC 26 947.37 141.31 53.47 443.81 996.94 17.01 16.04 8.05 9.03 17.01 8.05 Seismic - Longitudinal (HFL)1) Maximum Reaction Case
LC 27 933.74 136.81 53.47 378.04 954.30 16.22 15.29 8.48 9.42 16.22 8.48 Seismic - Longitudinal (HFL)2) Minimum Reaction Case
LC 28 946.74 136.81 53.57 442.31 954.47 16.97 16.04 8.08 9.01 16.97 8.08 Seismic - Longitudinal (HFL)3) Maximum Longitudinal Moment Case
LC 29 947.37 40.09 178.25 1244.43 461.51 23.96 23.50 1.11 1.56 23.96 1.11 Seismic - Transverse (HFL)1) Maximum Reaction Case
LC 30 933.52 40.09 178.58 1182.13 460.71 23.21 22.76 1.49 1.94 23.21 1.49 Seismic - Transverse (HFL)2) Minimum Reaction Case
LC 31 946.74 35.59 178.58 1245.36 419.04 23.93 23.52 1.11 1.52 23.93 1.11 Seismic - Transverse (HFL)3) Maximum Longitudinal Moment Case
LC 32 1002.13 40.09 53.47 443.81 472.00 17.48 17.02 9.03 9.49 17.48 9.03 Seismic - Vertical (HFL)1) Maximum Reaction Case
LC 33 987.79 40.09 53.57 379.08 469.32 16.71 16.25 9.42 9.88 16.71 9.42 Seismic - Vertical (HFL)2) Minimum Reaction Case
LC 34 1001.60 35.59 53.57 442.31 429.91 17.44 17.02 9.06 9.48 17.44 9.06 Seismic - Vertical (HFL)3) Maximum Longitudinal Moment Case
LC 35 673.31 115.33 52.56 333.60 689.75 12.25 11.57 5.57 6.24 12.25 5.57 Seismic - Span Dislodged Case1) Maximum Reaction Case
B C
4.20
Base Pressure
= P/ A ± MTT *x / ITT ± MLL *z / ILL
Sl.No. Forces about toe Base pressure at footing corners Pmax Pmin
V HL HT MTT MLL A B C D
2 2 2 2 3 4
t t t tm tm t/m t/m t/m t/m t/m t/m
LC 1 1660.73 48.59 0.36 811.85 646.15 29.59 28.96 14.35 14.98 29.59 14.35 LWL1) Maximum Reaction Case
LC 2 1558.49 14.85 0.36 318.61 326.35 23.64 23.32 17.59 17.91 23.64 17.59 LWL2) Minimum Reaction Case
LC 3 1655.71 45.59 0.36 792.82 617.76 29.34 28.73 14.46 15.07 29.34 14.46 LWL3) Maximum Longitudinal Moment Case
LC 4 1644.30 48.59 0.36 811.85 646.15 29.37 28.74 14.13 14.76 29.37 14.13 HFL1) Maximum Reaction Case
LC 5 1542.06 14.85 0.36 318.61 326.35 23.42 23.10 17.37 17.69 23.42 17.37 HFL2) Minimum Reaction Case
LC 6 1639.28 45.59 0.36 792.82 617.76 29.12 28.52 14.25 14.85 29.12 14.25 HFL3) Maximum Longitudinal Moment Case
LC 7 1122.38 7.44 0.36 56.71 130.93 15.42 15.29 14.27 14.40 15.42 14.27 LWL (Span Dislodged Case) 1) Maximum Reaction Case
LC 8 1105.95 7.44 0.36 56.71 130.93 15.20 15.08 14.05 14.18 15.20 14.05 HFL (Span Dislodged Case)1) Maximum Reaction Case
LC 9 1267.25 43.10 0.36 711.16 529.25 23.42 22.90 10.10 10.62 23.42 10.10 LWL1) Maximum Reaction Case
LC 10 1178.65 13.87 0.36 283.69 252.09 18.27 18.02 12.91 13.16 18.27 12.91 LWL2) Minimum Reaction Case
LC 11 1262.90 40.51 0.36 694.67 504.64 23.20 22.71 10.21 10.70 23.20 10.21 LWL3) Maximum Longitudinal Moment Case
LC 12 1250.83 43.10 0.36 711.16 529.25 23.20 22.69 9.89 10.41 23.20 9.89 HFL1) Maximum Reaction Case
LC 13 1162.22 13.87 0.36 283.69 252.09 18.05 17.80 12.70 12.94 18.05 12.70 HFL2) Minimum Reaction Case
LC 14 1246.48 40.51 0.36 694.67 504.64 22.99 22.49 9.99 10.48 22.99 9.99 HFL3) Maximum Longitudinal Moment Case
LC 15 847.50 7.44 0.36 56.71 98.49 11.77 11.67 10.65 10.75 11.77 10.65 LWL (Span Dislodged Case) 1) Maximum Reaction Case
LC 16 831.07 7.44 0.36 56.71 98.49 11.55 11.46 10.43 10.53 11.55 10.43 HFL (Span Dislodged Case)1) Maximum Reaction Case
LC 17 1456.84 207.85 80.21 590.20 1428.59 25.28 23.88 13.26 14.66 25.28 13.26 Seismic - Longitudinal (LWL)1) Maximum Reaction Case
LC 18 1446.29 204.48 80.36 542.43 1395.41 24.70 23.33 13.57 14.93 24.70 13.57 Seismic - Longitudinal (LWL)2) Minimum Reaction Case
Sl.No. Pmax Pmin Projection BM long. (kN-m) BM trans. (kN-m) SF long. (kN) SF trans. kN)
2 2
t/m t/m Long Trans. Edge at deff. Edge at deff. Edge at deff. Edge at deff.
LC 1 26.36 11.12 1.60 0.00 33.7 26.4 42.2 20.8
LC 2 20.41 14.36 1.60 0.00 26.1 20.4 32.7 16.1
LC 3 26.11 11.23 1.60 0.00 33.4 26.1 41.8 20.6
LC 4 26.14 10.90 1.60 0.00 33.5 26.2 41.8 20.6
LC 5 20.19 14.14 1.60 0.00 25.8 20.2 32.3 15.9
LC 6 25.89 11.02 1.60 0.00 33.1 25.9 41.4 20.4
LC 7 12.19 11.04 1.60 0.00 15.6 12.2 19.5 9.6
LC 8 11.97 10.82 1.60 0.00 15.3 12.0 19.2 9.4
LC 9 20.19 6.87 1.60 0.00 25.8 20.2 32.3 15.9
LC 10 15.04 9.68 1.60 0.00 19.2 15.0 24.1 11.8
LC 11 19.97 6.98 1.60 0.00 25.6 20.0 32.0 15.7
LC 12 19.97 6.66 1.60 0.00 25.6 20.0 32.0 15.7
LC 13 14.82 9.47 1.60 0.00 19.0 14.8 23.7 11.7
LC 14 19.76 6.76 1.60 0.00 25.3 19.8 31.6 15.6
LC 15 8.54 7.42 1.60 0.00 10.9 8.5 13.7 6.7
LC 16 8.32 7.20 1.60 0.00 10.7 8.3 13.3 6.6
LC 17 22.05 10.03 1.60 0.00 28.2 22.1 35.3 17.4
LC 18 21.47 10.34 1.60 0.00 27.5 21.5 34.3 16.9
LC 19 22.04 10.03 1.60 0.00 28.2 22.1 35.3 17.4
LC 20 32.46 -0.38 1.60 0.00 41.6 32.5 51.9 25.6
LC 21 31.91 -0.11 1.60 0.00 40.8 31.9 51.1 25.1
LC 22 32.49 -0.42 1.60 0.00 41.6 32.5 52.0 25.6
LC 23 22.75 11.50 1.60 0.00 29.1 22.8 36.4 17.9
LC 24 22.15 11.80 1.60 0.00 28.4 22.2 35.4 17.4
LC 25 22.73 11.52 1.60 0.00 29.1 22.7 36.4 17.9
LC 26 21.83 9.81 1.60 0.00 27.9 21.8 34.9 17.2
LC 27 21.24 10.14 1.60 0.00 27.2 21.2 34.0 16.7
LC 28 21.81 9.82 1.60 0.00 27.9 21.8 34.9 17.2
SLS Combination
Base Pressure
= P/ A ± MTT *x / ITT ± MLL *z / ILL
Sl.No. Forces about toe Base pressure at footing corners Pmax Pmin
V HL HT MTT MLL A B C D
2 2 2 2 3 4
Description
t t t tm tm t/m t/m t/m t/m t/m t/m
LC 1 1191.54 34.87 0.36 560.13 451.23 21.02 20.58 10.50 10.94 21.02 10.50 LWL1) Max Reaction
LC 2 1123.38 12.38 0.36 231.31 238.03 17.06 16.82 12.66 12.89 17.06 12.66 LWL2) Min Reaction
LC 3 1188.19 32.88 0.36 547.45 432.31 20.85 20.43 10.58 11.00 20.85 10.58 LWL3) Max Long. Moment
LC 4 1175.11 34.87 0.36 560.13 451.23 20.81 20.36 10.28 10.72 20.81 10.28 HFL1) Max Reaction
LC 5 1106.95 12.38 0.36 231.31 238.03 16.84 16.61 12.44 12.68 16.84 12.44 HFL2) Min Reaction
LC 6 1171.77 32.88 0.36 547.45 432.31 20.64 20.21 10.36 10.79 20.64 10.36 HFL3) Max Long. Moment
Sl.No. Pmax Pmin Projection BM long. (kN-m) BM trans. (kN-m) SF long. (kN) SF trans. kN)
2 2
t/m t/m Long Trans. Edge at deff. Edge at deff. Edge at deff. Edge at deff.
LC 1 17.79 7.27 1.60 0.00 22.8 17.8 28.5 14.0
LC 2 13.83 9.43 1.60 0.00 17.7 13.8 22.1 10.9
LC 3 17.62 7.35 1.60 0.00 22.6 17.6 28.2 13.9
LC 4 17.57 7.05 1.60 0.00 22.5 17.6 28.1 13.8
LC 5 13.61 9.21 1.60 0.00 17.4 13.6 21.8 10.7
LC 6 17.41 7.13 1.60 0.00 22.3 17.4 27.9 13.7
max 22.8 17.8 28.5 14.0
min 17.4 13.6 21.8 10.7
Quasi Combination
Base Pressure
= P/ A ± MTT *x / ITT ± MLL *z / ILL
Sl.No. Forces about toe Base pressure at footing corners Pmax Pmin
V HL HT MTT MLL A B C D
2 2 2 2 3 4
Description
t t t tm tm t/m t/m t/m t/m t/m t/m
LC 1 1058.71 7.44 0.36 56.71 191.19 14.61 14.42 13.40 13.59 14.61 13.40 LWL
LC 2 1042.29 7.44 0.36 56.71 191.19 14.39 14.20 13.18 13.37 14.39 13.18 HFL
Sl.No. Pmax Pmin Projection BM long. (kN-m) BM trans. (kN-m) SF long. (kN) SF trans. kN)
2 2
t/m t/m Long Trans. Edge at deff. Edge at deff. Edge at deff. Edge at deff.
LC 1 11.38 10.17 1.60 0.00 14.6 11.4 18.2 9.0
LC 2 11.16 9.95 1.60 0.00 14.3 11.2 17.9 8.8
STRESS CHECK
Footing Long. Dir
Sr. No. LOAD DATA
edge deff.
1 MOMENT KN-M 227.74 178.01
2 Grade of Steel Fe500 Fe500
3 Characteristic strength of reinf. (fyk) Mpa 500.00 500.00
4 Partial factor for steel (Уs) 1.15 1.15
5 Design value for tensile strength (fyd = fyk/Уs) Mpa 434.78 434.78
6 Modulus of Elasticity of Steel (Es) Gpa 200.00 200.00
7 Grade of Concrete M35 M35
8 Charecterstic comp. strength (fck) Mpa 35.00 35.00
9 α 0.67 0.67
10 Concrete material factor (Уm) 1.50 1.50
11 Design value for Concrete comp. strength (fcd = Mpa 15.63 15.63
12 Modulus of Elasticity of Concrete (Ecm) GPa 31.00 31.00
13 Width of slab(b) mm 1000.00 1000.00
14 Total depth of slab mm 900.00 812.50
15 Clear Cover mm 75.00 75.00
16 Dia of reinforcement mm 16.00 16.00
17 mm 0.00 0.00
18 Spacing of reinforcement mm 100.00 100.00
19 Spacing of reinforcement mm 100.00 100.00
20 Number of Bar Nos. 0.00 0.00
21 Area of reinforcement mm² 2010.62 2010.62
22 Reinforcement (%) 0.25 0.28
23 Dia of Shear Reinforcement mm 0.00 10.00
24 Spacing of reinforcement mm 0.00 200.00
25 number of legs Nos. 0.00 5.00
26 Reinforcement(%) 0.00 0.00
27 Effective depth of section (d = D-c-φ/2) 817.00 729.50
28 Concrete Cross Sectional Area (Ac) mm² 900000.0 812500.0
29 Perimeter in contact with atmosphere (u) mm 1000.00 1000.00
30 Notional size (=2Ac/u) mm 1800.00 1625.00
31 Age of loading Days 28.00 28.00
32 Relative humidity % 80.00 80.00
33 Final creep co-efficent of 28 days (φ) 0.97 1.04
34 Effective modulus of Elasticity of Concrete Mpa 15762.71 15163.04
35 Modular ratio 12.69 13.19
36 Allowable stress in steel Mpa 400.00 400.00
37 Allowable stress in Concrete Mpa 12.60 12.60
38 Postion of NA axis from compression flange (x) mm 716.41 649.87
39 MOA of Compression area mm² 2.6E+08 2.1E+08
40 MOA of Tension Area mm² 2.6E+08 2.1E+08
41 Diff. mm² 0.0E+00 0.0E+00
42 MOI of Cracked Section mm4 1.2E+11 9.2E+10
43 Stress in tension reinforcement σsc MPa 195.90 172.63
44 Status O.K. O.K.
45 Stress in concrete Mpa 1.328 1.262
46 Status O.K. O.K.
47 Eff area of conc in tension surrounding reinf Ac, eff mm² 61197.2 54208.7