MOM Detail WTT Project Date: 28-11-2018 SR No Job Detail Status

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

MOM detail

WTT PROJECT Date: 28-11-2018

Sr No Job Detail Status

1 Decide & Finalisation of Different agencies for electrical, Rendering, Plumbing work and asking for WIP
quotation

2 Follow up to Hiteshbhai for electrical work & asking for Quatation & Ranjit Rawat for Plumbing work WIP
& asking for Quatation

3 Barchart & Scheduling (Monthwise & All Over) WIP

4 Follow up to harjit singh for Quotation of shifting tower crane from sun orbit to WTT site
In 2 Days
5 Ask for all pending drawings
Pending
6 Formwork Order Qty (Column, Lift & Shear Wall)
Done
Formwork Order Qty (Beam Bottom & Slab)
7 Pending
MOM Detail

ANAM-I Project
Date: 28-11-2018
Sr. NO. Job Detail Status

Follow up Different agencies for Shuttering, Steel,Pouring, electrical, Rendering, Plumbing


1 WIP
work and asking for quotation

2 Calculate BBS Qty for all floors including slab Pending

3 Calculate RCC Qty For gardes M10, M15, M30 Pending

4 Formwork detail calculation WIP

5 Follow up Harjitsingh for new tower crane operator and ask for quotation in 2 Days

6 Prepare revised Bar Chart (Monthwise And All over) Done

7 Ask for all pending drawings Pending


MOM Work detail

SHILP SHALIGRAM Project


11/28/2018
Sr. NO. Job Detail Status

1 Make Revised Logistic plan Pending

2 Calculate Office Qty including BBS, RCC, Masonry & Plaster Done

3 Follow up And ask different Sub Contractor for RCC work, Brick masonry with quotation (Block wise different) WIP

4 Prapare Bar Chart for office (Monthwise And All over)


Pending

PVC Chairs 3 Nos Available More


5 Take follow up fo Punching machine & PVC chairs 4 Nos Requirment & Punching
Machine will be
reachTommorow

You might also like