0% found this document useful (0 votes)
48 views3 pages

Routine 1st Batch

This document outlines a 12-day induction training schedule for new Assistant Engineers in the Public Works Department of West Bengal. The training covers a wide range of topics to introduce the engineers to their roles and responsibilities, including the salient features of relevant service rules, estimate preparation, contractual clauses, treasury rules, substation design, project reports, communication skills, budgeting, procurement, and site visits. Experienced officers from the Public Works Department act as instructors on technical subjects.

Uploaded by

Papri Mahata
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views3 pages

Routine 1st Batch

This document outlines a 12-day induction training schedule for new Assistant Engineers in the Public Works Department of West Bengal. The training covers a wide range of topics to introduce the engineers to their roles and responsibilities, including the salient features of relevant service rules, estimate preparation, contractual clauses, treasury rules, substation design, project reports, communication skills, budgeting, procurement, and site visits. Experienced officers from the Public Works Department act as instructors on technical subjects.

Uploaded by

Papri Mahata
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

ADMINISTRATIVE TRAINING INSTITUTE

GOVERNMENT OF WEST BENGAL


Induction Training for the Assistant Engineers (Electrical) of the Public Works Department
From : 06.04.2020 to 18.04.2020

Day- I : 06.04.2020 (Monday)


9.45 a.m. – 10.15 a.m. REPORTING, REGISTRATION AND SUBMISSION OF PROFILE
10.00 a.m.-10.45 a.m. Inauguration
10.45 a.m.-11.15 a.m. Tea break
11.15 a.m. –1:15 p.m. Salient Features of West Bengal Services Rules Part I- By . ATI
1:15 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. Salient Features of West Bengal Health Scheme- By ATI
3:45 p.m. – 4:00 p.m. Tea break
4:00 p.m. – 5:30 p.m. Salient Features of West Bengal Services Rules Part II- By . ATI

Day- II : 07.04.2020 (Tuesday)


10:15 a.m – 11:45 a.m. Standard Operating Procedure(SOP) for preparation of Estimate – Sh Subhasis
Biswas,Chief Engineer(Electrical) PWD
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Estimate Preparation and Vetting – Sh Swaraj Das SE(Elect) PWD
1:30 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. Electrical Wiring,Standard & Practice – Sh Ujjwal Basu,Retd.SE(Elect) PWD
3:45 p.m. – 4:00 p.m. Tea break
4:00 p.m. – 5:30 p.m Solar Power and Net Metering Concept – Sh Suman Karmakar Exe. Engineer(Elect)
PWD

Day- III: 08.04.2020 (Wednesday)


10:15 a.m – 11:45 a.m. Contractual Clauses and Role of Audit in PWD – Sh Sumantra Chaudhury Addl.
Secretary PWD
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Contractual Clauses and Role of Audit in PWD Sh Sumantra Chaudhury Addl. Secretary
PWD
1:30 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. NIT Preparation,Form no 2911 & Clauses of Contract– Sh Rajarshi Roy SE(Elect) PWD
3:45 p.m. – 4:00 p.m. Tea break
4:00 p.m. – 5:30 p.m Salient Features of PWD Code Vol I - Sh Rajarshi Roy SE(Elect) PWD

Day- IV : 09.04.2020 (Thursday)


10:15 a.m – 11:45 a.m. Salient Features of W B Financial Rules & W B Treasury Rules – Sh Ayan Mitra AFA
PWD
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Salient Features of W B Financial Rules & W B Treasury Rules – Sh Ayan Mitra AFA
PWD
1:30 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. Substation Design and Execution – Sh Rajat Ghosh SE(Elect) PWD
3:45 p.m. – 4:00 p.m. Tea break
4:00 p.m. – 5:30 p.m Substation Design and Execution – Sh Rajat Ghosh SE(Elect) PWD

Day- V : 10.04.2020 (Friday) – Holiday


Day- VI : 11.04.2020 (Saturday)
10:15 a.m – 11:45 a.m. Preparationof Project Report inclu.Building Services Components -Smt.Nupur
Banerjee,Retd. Chief Govt.Architect PWD
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Preparation of Project Report inclu.Building Services Components -Smt.Nupur
Banerjee,Retd. Chief Govt.Architect PWD
1:30 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. Lunch break
3:45 p.m. – 4:00 p.m. Design and Installation of Fire Detection equipments – Sh Debojyoti Dasgupta Executive
Engineer(Elect) PWD

4:00 p.m. – 5:30 p.m Points to ponder for Installation of Lift – Sh Apurba Ghosh Lift Inspector,South Zone
PWD

Day- VII : 13.04.2020 (Monday)


10:15 a.m – 11:45 a.m. Communication Skills and Writing Abilities– By ATI
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Officer like Qualities - By ATI
1:30 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. Air Conditioning through Unitary/VRF/Chiller machine – Sh R Gupta Sarma SE(Elect)
PWD
3:45 p.m. – 4:00 p.m. Tea break
4:00 p.m. – 5:30 p.m Air Conditioning through Unitary/VRF/Chiller machine – Sh R Gupta Sarma SE(Elect)
PWD

Day- VIII : 14.04.2020 (Tuesday) – Holiday

Day- IX : 15.04.2020 (Wednesday)


10:15 a.m – 11:45 a.m. Budget &Works - Sh R Gupta Sarma SE(Elect) PWD
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Budget &Works - Sh R Gupta Sarma SE(Elect) PWD
1:30 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. Selection of UPS – Sh Tapas Pal Executive Engineer(Elect) PWD
3:45 p.m. – 4:00 p.m. Tea break
4:00 p.m. – 5:30 p.m Criteria for Selection of LED fittings-Sh Kalyan Prodhan Executive
Engineer(Elect)PWD

Day- X : 16.04.2020 (Thursday)


10:15 a.m – 11:45 a.m. HRMS and DDO functioning – Sh Goutam Ghosh Executive Engineer(Elect) PWD
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Procurement through GeM - Sh Goutam Ghosh Executive Engineer(Elect) PWD
1:30 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. Designing of LAN/WAN – Sh Biplab Barik SE(Elect) PWD and Sh S Mallick Exe.
Engineer(Elect) PWD
3:45 p.m. – 4:00 p.m. Tea break
4:00 p.m. – 5:30 p.m Criteria for Selection of CCTV,Video Conference & Smart Class Equipment – Sh
Biplab Barik SE(Elect) PWD and Sh S Mallick Exeutive Engineer(Elect) PWD

Day-XI : 17.04.2020 (Friday)


10:15 a.m – 11:45 a.m. Energy Conservation Building Code 2017 – Rep.of SDA
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Green Building Concept and GRIHA & IGBC rating - Rep.of SDA
1:30 p.m. – 2:15 p.m. Lunch break
2.15 p.m. – 3.45p.m. Site Inspection at Judicial Academy Rajarhat

3:45 p.m. – 4:00 p.m. Site Inspection at Judicial Academy Rajarhat

4:00 p.m. – 5:30 p.m Site Inspection at Judicial Academy Rajarhat

Day-XII
: 18.04.2020 (Saturday)
10:15 a.m – 11:45 a.m. Structure of PWD and Duties and Responsibilities of PWD Officers – Sh K K
Chaudhury Chief Engineer(Electrical)PWD
11.45 a.m. – 12:00 noon Tea break
12:00 noon – 1:30 p.m. Online Assessment
1:30 p.m. – 2:05 p.m. Valediction