Cost Estimate
Cost Estimate
eathworks
excavation 623908 m3 93.33 58229333.64
backfill 617669 m3 50 30883450
disposal 620 m3 100 62000
clay layer capping 3940 m3 250 985000
gravel bedding 1578 m3 200 315600
sub-total 90475383.64
boring works
water proffing works
HDPE membrane 107403 m2 300 32220900
sub-total 32220900
piping/gas vent pipe
6" dia. HDPE pipe with fitting 1980 500 990000
sub-total 990000
General requirements
Mobilization/Demobilization 1 lot 500000 500000
field offices and sheds 1 lot 800000 800000
office facilities and equipments 1 lot 100000 100000
quality control 1 lot 1600000 1600000
sub-total 3000000