Assignment On Project Crashing: Activities Normal Time (Weeks) Crash Time Normal Cost Crash Cost Imm. Predec
Assignment On Project Crashing: Activities Normal Time (Weeks) Crash Time Normal Cost Crash Cost Imm. Predec
Industrial
Solution
ADG= 16
BFG=12
3. Find the activity to crash if we want to reduce the completion date by one week
Normal Crash
Crash Normal Crash Imm. Critical
Activities Time cost per
Time Cost Cost Predec path?
(weeks) week
A 4 3 2000 2600 600 -- yes
B 2 1 2200 2800 600 -- no
C 3 3 500 500 0 -- no
D 8 4 2300 2600 75 A yes
E 6 3 900 1200 100 B no
F 3 2 3000 4200 1200 C no
G 4 2 1400 2000 300 D, E yes
We wish to reduce the completion date by one week, from this table, it indicates that activity
D is the best chosen because it is in the critical path and cost the cheapest price 75 per week
amount all activities.
Normal
Activities Time Cost
(weeks)
A 3 2600
B 2 2200
C 3 500
D 4 2600
E 5 1000
F 3 3000
G 2 2000
Solution
a+ 4 m+ b
t=
6
Which a: Optimistic time
m: Most likely time
b: Pessimistic time
ABEFGHIL= 230
ACDGHJKL= 240
ACDGHIL=260
ACDGHJKL=240
Project variance
σ P= √ Project variance
¿ √ 319.44=17.8728
(270−260 )
Z=
σP
(270−260 )
Z= =0.55
17.8728
3. if it is necessary to crash to 250 or 240 days, Find the cost to increase. Assuming
that the optimistic time can be used as crash time.
Activity Expected time Crash Time Days can be crushed Crush cost/day
A 30 20 10 1500
C 65 50 15 4000
D 55 30 25 1900
G 30 25 5 2500
H 20 10 10 2000
J 10 8 2 6000
K 0.1 0.1 0 0
L 30 20 10 400