PPAP Approval Request (PSW)
PPAP Approval Request (PSW)
Address 1 Address 2
Ye
MATERIALS REPORTING GADSL Declaration of Conformance (IMDS) No
sYe n/
Does this part contain any restricted or reportable substances? No
s
Ye a
n/
If a new revision, has the reportable material content changed? No
sYe a
Safety and/or Government Regulation No
s
Ye
Regional Certification / Partmark Required? No
sYe
Deviations/Comments? No
s
REQUIRED SUBMISSION REASON FOR SUBMISSION
PPAP Approval Form (and Appearance Approval Initial Submission
Reportpackage
PPAP if required)
with product samples, complete Design Change(s)
supporting data, and other requirements as Process/Tooling/Machine: Transfer, Replacement or
specified
ESON audit by at
ESON
manufacturing location (If Refurbishment
Sub-Supplier or-Material
PCR Attached
Source
requested by ESON QE) Change - PCR Attached
Other - please specify below:
SUBMISSION RESULTS
MEETS MEETS
YES NO N/A TESLA QE YES NO N/A TESLA QE
Supplier Quality Raw Material
Quality Assurance
Contacts Certifications
Sample Parts, Data,
Schedule Quality
and FAI
Part Evaluation
Readiness
Plan
Inspection PFS - No Critical
Rev: 00 Date: 6/18/2015 Checksheet
Standard
Process Quality
HVPT and Concerns
Capacity
Flow Chart Study
Appearance
Control Plan Standard and AAR
PFMEA Other:
Capability Results for Critical
Characteristics
Ye N
These results meet all drawing and specification requirements: (If "NO" - Explanation Required)
s o
Mold / Cavity / Production Process Represented:
Is each Customer Tool properly tagged and numbered according to ESON Multiwin Asset Management Requirements? Yes n/a
DECLARATION
I hereby affirm that the samples represented by this warrant are representative of our parts which were made by a process that meets all AIAG Production Part Approval Process
Manual 4th Edition Requirements including all ESON Multiwin additional requirements. I further affirm that these samples were produced at the production rate of
I also certify that documented evidence of such compliance is on file and available for review. I have noted any deviations from the declaration below.
EXPLANATION/COMMENTS:
AT MINIMUM, THE SUPPLIER IS EXPECTED TO MAINTAIN THE APPROVED LEVEL OF QUALITY
Title: E-mail:
BMS-0000163 rev 03