This final dimension inspection report summarizes the measurement of dimensions for item BRIDGE for the MOC Cracker project. It lists the drawing dimensions, actual measured dimensions, deviations from specifications, and tolerances for 28 check items. The inspection was accepted as all dimensions were within the allowed tolerances of ±20mm.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views4 pages

Final Dimension

This final dimension inspection report summarizes the measurement of dimensions for item BRIDGE for the MOC Cracker project. It lists the drawing dimensions, actual measured dimensions, deviations from specifications, and tolerances for 28 check items. The inspection was accepted as all dimensions were within the allowed tolerances of ±20mm.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

FINAL DIMENSION INSPECTION Report

Page
No. : FDI-00
1 of 1
REPORT Date : 1/28/2009
Client : Association of 3 Co., Ltd. Item No. BRIDGE
Project : MOC Cracker REQ. No. 43-51-101
Check Dimension Check Dimension
Item DWG. Actual Deviation Tolerrance Item DWG. Actual Deviation Tolerrance
A1R 31 32 1 ± 20 B1R 31 29 -2 ± 20
A2R 53 54 1 ± 20 B2R 53 52 -1 ± 20
A3R 66 70 4 ± 20 A3R 66 68 2 ± 20
A4R 70 78 8 ± 20 B4R 70 72 2 ± 20
A5R 66 72 6 ± 20 A5R 66 72 6 ± 20
A6R 53 58 5 ± 20 B6R 53 59 6 ± 20
A7R 31 32 1 ± 20 A7R 31 35 4 ± 20
A1L 31 34 3 ± 20 B1L 31 28 -3 ± 20
A2L 53 57 4 ± 20 A2L 53 54 1 ± 20
A3L 66 68 2 ± 20 B3L 66 72 6 ± 20
A4L 70 67 -3 ± 20 A4L 70 78 8 ± 20
A5L 66 60 -6 ± 20 B5L 66 66 0 ± 20
A6L 53 50 -3 ± 20 B6L 53 53 0 ± 20
A7L 31 31 0 ± 20 B7L 31 34 3 ± 20

Inspection resal ✘ Accept Reject


Note : All dimension are measured in (mm.

Rev.0/23 Apr 2004


PILLIN OWNER OWNER
Date : Date : Date :

Rev.0/23 Apr 2004


FINAL DIMENSION INSPECTION Report
Page
No. : FDI-00
1 of 1
REPORT Date : 1/28/2009
Client : Association of 3 Co., Ltd. Item No. BRIDGE
Project : MOC Cracker REQ. No. 43-51-101
The sketches part

Inspection resalt ✘ Accept Reject


Note : All dimension are measured in (mm.)

Rev.0/23 Apr 2004


SSC TTCL OWNER
Date : Date : Date :

Rev.0/23 Apr 2004