The document summarizes the design of a settling basin using Camp's Method. Key details include: 1) The design discharge is 22.5 m3/s and the settling basin flushing discharge is 2.25 m3/s. 2) The settling basin is 100m long with a width of 23.8m and water depth of 6m. 3) Calculations determine the trap efficiency for different particle sizes ranging from 40-100% efficient. 4) Dimensions and discharge capacity of the flushing gate are provided.

Uploaded by

pushkar078
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
369 views2 pages

Settling Basin Design

The document summarizes the design of a settling basin using Camp's Method. Key details include: 1) The design discharge is 22.5 m3/s and the settling basin flushing discharge is 2.25 m3/s. 2) The settling basin is 100m long with a width of 23.8m and water depth of 6m. 3) Calculations determine the trap efficiency for different particle sizes ranging from 40-100% efficient. 4) Dimensions and discharge capacity of the flushing gate are provided.

Uploaded by

pushkar078
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Trishuli Rehabilitaion Project

Subject: Settling basin design (using Camp's Method)

Description Symbol Formula Calculation Units Remarks


Input
3
Design discharge Qd 22.50 m /s
~10% of Qd, for
3
Settling basin flushing discharge Qsf 2.25 m /s continues flushing
Max. discharge into the settling basin Q 24.75 m3/s
Length of settling basin (parallel section) L 100 m L/B<=10
Effective length of settling basin Lef 80 m
No. of bay 2
Hopper in each bay 2
Width of each bay W 11.50 m
Water depth above hopper H 6.00 m
Total width of settling basin W sb 23.8 m wall thickness 0.8
3
Discharge in each basin Qbasin 12.38 m /s VG
Manning's number M 67 n=0.015
Water temperature t 20 oC
Accleration due to gravity g 9.81 m/s2
Density of water ρw 1000 kg/m
3

Density of sediment ρs 2600 kg/m


3

Calculations
2
Effective surface area of basin As 920.00 m Deposition criteria
Side slope of hopper 45 degrees B = 7.2*Q0.5
Depth of hopper Dhopper 1.88 m Width of basin
2
Area of hopper Ahopper 12.69 m B 24.4 m
Total height of settling basin Hsettling 7.88 OK
2
Cross sectional area of the basin Ai W*H+0.5*A hopper 75.35 m
Wetted perimeter Pi 23.50 m
Hydraulic radius R 3.21 m
Hydraulic gradient Se Se = Q2/(M2*A2*R4/3) 0.000001
Shear velocity v* v* = (gRSe)0.5 0.006
Velocity in the uniform section Vbasin 0.16 m/s

Permissible horizontal velocity v  0.44 dlimit 0.20 m/s ITDG,73


Check for permissible horizontal velocity OK

Trap efficiency by different methods


Fall velocity Efficiency h(%) = Cremoved/Coriginal (%)
(w) using Hazen
Rouse m (V. Good) m (good)
Standard particle size (mm) diagram wAs/Q w/v* Camp 0.17 0.50 Vetter
0.10 0.006 0.4 0.949 40% 35% 33% 36%
0.15 0.015 1.1 2.372 85% 64% 59% 67%
0.20 0.020 1.5 3.163 100% 74% 67% 77%
0.25 0.030 2.2 4.745 100% 85% 78% 89%
0.30 0.035 2.6 5.535 100% 88% 81% 93%
0.40 0.050 3.7 7.908 100% 94% 88% 98%
0.50 0.067 5.0 10.596 100% 97% 92% 99%

Trap efficiency vs Particle size curve


110%

100%

90%

80%
Efficiency h(%)

70%

60%

50%

40%

30% Camp Hazen Vetter Hazen

20%
0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55
Particle size (Standard Fall diameter) (mm)
Check for efficiency according to Camp Ok

Trap efficiency vs Particle size curve


110%

100%

90%

80%
Efficiency h(%)

70%

60%

50%

40%

30% Camp Hazen Vetter Hazen

20%
0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55
Particle size (Standard Fall diameter) (mm)

Description Symbol Formula Calculation Units Remarks


Flushing gate
Width of flushing gate W gate 2.0 m B= 11.50
Depth of flushing gate Dgate 1.5 m
max Head of flushing gate Hgate 8.63 m D hopper=
at the max level of
Max Discharge through flushing channel Qmax-flushing Q  CA 2 g (hr  hh ) 23.42 m3/s water H= 6.00

H settling basin= 7.88 1.88


45
W Flushing = 2.0 D Flushing= 1.5