This document outlines responsibilities for various project roles in a responsibility assignment matrix (RACI). It assigns responsibilities using letters (R=Responsible, A=Accountable, C=Consulted, I=Informed) for tasks related to:
1. Interpreting plans and specifications, submitting requests for information, and processing submittals.
2. Monitoring construction schedules and notifying contractors to update schedules.
3. Overseeing construction operations and safety compliance.
4. Conducting quality assurance through inspections, material testing, and ensuring work complies with standards.
5. Reviewing material receipts and verifying quantities.
6. Documenting potential claims and reviewing change orders.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
198 views
Appendix A - Responsibility Assignment Matrix
This document outlines responsibilities for various project roles in a responsibility assignment matrix (RACI). It assigns responsibilities using letters (R=Responsible, A=Accountable, C=Consulted, I=Informed) for tasks related to:
1. Interpreting plans and specifications, submitting requests for information, and processing submittals.
2. Monitoring construction schedules and notifying contractors to update schedules.
3. Overseeing construction operations and safety compliance.
4. Conducting quality assurance through inspections, material testing, and ensuring work complies with standards.
5. Reviewing material receipts and verifying quantities.
6. Documenting potential claims and reviewing change orders.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6
RESPONISBILITY ASSIGNMENT (RACI) MATRIX
Reside Docume Projec
CQAM/ Site Design Environm No COP/DCO nt nt t Responsibilities DCQA Inspect Manag ent TOCOR . P Engine Controll Contr M or er Officer er er ol (A Interpretation of Plans and Specifications: ) Provide clarification of Task Order 1. I A R I C C documents and related codes. Process and maintain a log of all 2. I A C R requests for information (RFI) Process material submittals for 3. I A C R review. Maintain a submittal log. (B) Construction Schedule: Monitor and review the Contractor’s work schedules, verify 1. I A R C C I and take actions to pursue timely project completion Notify the Contractor to update his 2. I A R C C I construction schedules as required. Monitor and coordinate construction scheduling for 3. I A R C C I continuity and logical placing of the various work components (C) Construction Operations: Confirm that the Contractor installs temporary facilities as required and 1. removes them when no longer I C A R I needed and restores the area to its original condition. Monitor other work within the project limits, which could 2. I C A R I impact/affect construction operations. (D Safety: ) 1. Monitor the Contractor at all I C A R I construction worksites, and immediately notify the Contractor’s R = Responsible A = Accountable C = Consulted I = Informed RESPONISBILITY ASSIGNMENT (RACI) MATRIX
management staff of any unsafe
conditions or unsafe acts observed. A written notice must succeed any verbal notice. Monitor construction activities and procedures to ensure that minimal 2. damage is done to the environment I C C R A I including introduction of pollutants and control of erosion. Reside Docume Projec CQAM/ Site Design Environm No COP/DCO nt nt t Responsibilities DCQA Inspect Manag ent TOCOR . P Engine Controll Contr M or er Officer er er ol (E Quality Assurance: ) Observe the work, materials, and witness tests so that all are following the Task Order 1. I C A R I documents and all applicable codes and that the work conforms to good construction practices Notify and verify whether the Contractor corrects/remedies any 2. I C A R I work in non- compliance of Task Order documents. Confirm and review the Contractor’s quality control programs. Monitor compliance of 3. the Contractor of their quality I A R C I control programs and take necessary corrective actions when appropriate. Secure certified copies of all test results from the Contractor. Review 4. I C A R all test results for compliance with the Task Order. 5. Witnessing testing conducted by I C A R I the Contractor, random checking
R = Responsible A = Accountable C = Consulted I = Informed
RESPONISBILITY ASSIGNMENT (RACI) MATRIX
and sampling of construction
materials to ensure compliance with agreed upon quality. (F Materials Receiving: ) 1. Review Contractor’s reports. I C A R I Verify materials for conformance 2. I C A R I with the Task Order documents Verify quantities of the materials 3. I C A R I stored on site (G Construction Changes and ) Claims: Maintain accurate records of facts regarding materials, labor and 1. I C A R C I equipment associated with any potential claim or dispute. Review and submit recommendations to the TOCO regarding the validity of all 2. A R C C C C Contractor changes or claims related to costs, price, time, or design.
R = Responsible A = Accountable C = Consulted I = Informed
RESPONISBILITY ASSIGNMENT (RACI) MATRIX
Reside Docume Projec
CQAM/ Site Design Environm Social No COP/DCO nt nt t Responsibilities DCQA Inspect Manag ent Mobiliz TOCOR . P Engine Controll Contr M or er Officer er er er ol Prepare for issuance by the TOCO supporting documents for all change orders, change order 3. sketches or drawings or any other I C A R C I material modification or adjustment relating to proposed construction changes. (H Record of Task Order Drawings ) Maintain a record of Task Order 1. I A C R drawings (I) Progress Payments: Review the Contractor’s monthly 1. progress estimates for progress I A R C I payments (J) Records: Obtain, account for, and maintain: meeting minutes, correspondence, 1. test records and reports, shop I A C R drawings, submittal logs, RFI logs, submittal samples etc. (K Inspection Services: ) Conduct pre-final and final inspections with the Contractor, 1. C A R I and other agencies required to participate Prepare a punch list of deficient 2. items and substandard work for I A R C I review by the TOCOR Continue inspection services until 3. the Contractor completes all punch I C A R I list items (L) Post-construction Services: R = Responsible A = Accountable C = Consulted I = Informed RESPONISBILITY ASSIGNMENT (RACI) MATRIX
Confirm submission of field posted
As-built Drawings to the TOCOR 1. I A R C I within 60 days from Final Acceptance of the project. File project records in accordance 2. I C A C R I with TOCOR Turn over guarantee and warranty 3. I A R C I data to the TOCOR
R = Responsible A = Accountable C = Consulted I = Informed
RESPONISBILITY ASSIGNMENT (RACI) MATRIX
Reside Docume Projec
CQAM/ Site Design Environm Social No COP/DCO nt nt t Responsibilities DCQA Inspect Manag ent Mobiliz TOCOR . P Engine Controll Contr M or er Officer er er er ol Turn over construction contract maintenance monitoring 4. responsibilities to the TOCOR after I A R C I the completion of all punch list items or plant establishment period Verify and take actions within the Contractor’s authority to ensure 5. the I C A R I Contractor corrects all deficient items in a timely manner Confirm submission of 3 hard copies of Project Operations and 6. I A R C I Maintenance (O & M) manual and an electronic copy.
R = Responsible A = Accountable C = Consulted I = Informed