Abstract. Industrial development in Indonesia, manufacturing and services, are required to be able to manage
the company very well. However, in practice, the company's activities are always faced with risks. In general,
the risk can be defined as a situation faced by a person or a company in which there is a possibility that harm.
The level of risk faced losses due to highly variable depending on the cause and effect influence. To be able
to manage (risk management), it can use FMEA (Failure Mode and Effect Analysis). FMEA is a method of
analyzing potential failure are applied in product development, system engineering and operational
management and is one of a qualitative risk assessment. Using FMEA can also note the value of the RPN
(Risk Priority Number) to determine improvement priorities at risk. But there are weaknesses in the use of
FMEA, namely RPN calculation is only done by multiplying the severity, occurence and detection alone and
irrespective of the degree of importance of each input, to the FMEA method is integrated using fuzzy logic.
Fuzzy FMEA is aimed at obtaining the highest fuzzyRPN value which will be used as the focus of
improvements to minimize the possibility of these risks occur back. The results were obtained 7 out of 18
types of risks that have a high priority for repairs. Risk troublesome computer (hank / die) while doing photo
editing scored the highest RPN 540 (scale 1-1000) and also the highest FRPN 9 (scale 1-10). There is a
difference in value between RPN and FRPN. FRPN value obtained from the fuzzification, generate value by
taking into account the degree of interest of any given input.
(Hanggraeni, 2010). Fuzzy logic is one method for business operations of a company (Hanggraeni, 2010). On
analyzing systems that contain uncertainty (Kusumadewi the Project Risk Management PMBOK (2004), risk
S, 2002). The use of fuzzy logic in the FMEA to help management is a systematic process of planning,
determine the value of the Risk Priority Number (RPN) of identifying, analyzing, responding to and controlling risk.
failure occurring. Risk management is intended to ensure the
sustainability of profitability and growth in line with the
vision and mission of the company. In the control strategy
2 Literature Review and business risk management, corporate identification
and risk maps (risk mapping), quantification and
2.1 Risk Definition measurement of risk (risk measurement and assessment),
risk management (risk treatment) as well as risk
Understanding the risks within the scope of the general management policies (Hanggraeni, 2010). Risk
public better known as something harmful from the Management process starting from identifying risk,
presence of an incident. There are several definitions of analyzing risk, manage risk, risk management
risk, according to some experts, including: implementation and control of the application of risk
- Risks in the Great Dictionary of Indonesian is a result management (ISO 31000-risk management system).
of less favorable (adverse harm) of an acts.
- According Hanggraeni 2010 risk is an events that the
potential to occur that might cause harm to a company. 2.4 FMEA (Failure Mode and Effect Analysis)
- ISO / IEC Guide 73: 2002 Risk Management- Use of the method FMEA (Failure Mode and Effect
Vocabulary-Guidelines for use in standards (2002) Analysis) was first created in 1960 by the Aerospace
states that the risk is a combination of the probability Industry. In 1974, the Navy developed the so-called
of occurrence and consequences. FMEA Procedure Mil-Std-1629 in which FMEA format
is often used today. FMEA became popular after being
2.2 Operational Risk used by the automotive industry to be implemented
Integration into the product development process of their
Operational risk is the risk of most types of 'old' but least cars to overcome the problems of low product quality.
understood compared with other types of risks (eg market FMEA until now still used primarily to prevent accidents
risk or interest rate). In this type of operational risk, there and incidents at work (Mc Dermott, 2009).
are inherent operational risk categories, namely risk arises
because the company does business. For example, Table 1. Severity rating scale
operational risk, namely, internal control systems are
Rating Description Criteria
inadequate, work accidents, computer system failures, Failure could cause the death of a
data corruption, failure to manage human resources customer (patient, visitor,
(employees) and others. Basel II (which regulates Extremely employee, staff member, business
international banking institutions) defines operational risk 10
dangerous partner) and/or total system
as the risk arising from the failure of internal processes, breakdown, without any prior
people, systems or from external events. There are two warning
types of business operational risks that can be faced by the 9 Failure could cause a major or
company (Hanggraeni, 2010), namely: permanent injury and/or serious
Very
- The risk of non-entrepreneurial, that is a risk that was system disruption with
8 dangerous
interruption in service, with prior
not caused by an entrepreneurial decision taken by the warning.
company. Companies usually use the services of 7 Failure could cause a minor to
insurance as a way to protect the company from this moderate injury with a high
risk. Example: natural disasters, fires, and pollution. degree of customer dissatisfaction
- Entrepreneurial risk, namely the risk posed by the Dangerous
6 and/or major system problems
entrepreneurial decision taken by the company. If the requiring major repairs or
company's business decisions and not precisely significant re-work.
predict the decision, the company may experience Failure could cause a minor injury
significant losses. Example: the risk of build a new Moderate with some customer
5
building, the risk of launching new products and the danger dissatisfaction and/or major
system problems.
risk of merger.
4 Failure could cause a very minor
or no injury but annoys customers
Low to
2.3 Risk Management and/or results in minor system
moderate
3 problems that can be overcome
danger
Risk management is closely related to the company's with minor modifications to the
sustainability. If the company carries out the management system or process.
of risk, the company can avoid bankruptcy or even be able Failure could cause no injury and
the customer is unaware of the
to generate increased profits. Risk management is a series
2 Slight danger problem; however, the potential
of procedures and methodologies used to identify, for minor injury exists. There is
measure, monitor and control risks arising from the little or no effect on the system.
2
MATEC Web of Conferences 154, 01084 (2018) https://doi.org/10.1051/matecconf/201815401084
ICET4SD 2017
3
MATEC Web of Conferences 154, 01084 (2018) https://doi.org/10.1051/matecconf/201815401084
ICET4SD 2017
7. Calculate the value of the RPN (risk priority number) Mamdani or often known by the method of Max - Min
for each effect of failure. RPN is a measurement of the introduced by Ebrahim Mamdani in 1975. To get a fuzzy
relative risk by multiplying the value of severity, output requires four steps:
occurence and detection. Within the scope of FMEA, 1. Arrange the Fuzzy membership function.
this value can range from 1 to 1000. Mathematically it 2. Create a rule-based fuzzy logic.
can be expressed as follows: 3. Perform Fuzzy inference process.
RPN = (S) x (O) x (D)
In equation is the multiplication between the severity
(S), occurence (O) and detection (D). RPN is determined 3 Case Study
before setting a corrective action recommendations and Optimus Creative was founded in 2010, located in
used to prioritize action. Sarimanah, Bandung, West Java. Optimus Creative is a
1. Prioritize failure modes that have the highest RPN.
creative company advertising agency, Graphic Design,
2. Take measures to eliminate or reduce the failure
Photography, Videography and Event Organizer. Services
modes that have the highest risk.
offered by this company is more focused on the annual
3. Recalculating the value of the RPN after the failure
book production services (yearbook) for each of the
mode have been reduced or eliminated.
schools in the city of Bandung. Optimus Creative has
opened various branches in Yogyakarta, Jakarta,
2.7 Fuzzy Logic Tasikmalaya, so today has been a lot of work together in
making the school yearbook with more than 100 school.
Fuzzy logic is a proper way to map an input space into an
output space. There are several reasons why people use
fuzzy logic, among others (Kusumadewi, 2002): 3.1 FMEA Application
1. The concept of fuzzy logic is easy to understand.
In making the yearbook through six processes, namely the
Mathematical concepts underlying the fuzzy
presentation, meeting concept, photo session, photo
reasoning is very simple and easy to understand.
editing, printing and delivery. The entire process is not
2. Fuzzy logic is very flexible.
immune from the risks experienced. To be able to identify
3. Fuzzy logic can tolerate data that is not appropriate.
the overall risk and knowing the weights for each risk,
4. Fuzzy logic is able to model non-linear functions are
then the distribution of questionnaires to all employees
very complex.
who work at the company's operations. The results of the
5. Fuzzy logic can develop and apply the experiences of
questionnaire were as follows:
experts directly without having to go through the
training process. Table 4. Recapitulation questionnaire
6. Fuzzy logic can work with techniques conventional
control. No Production Risk Identification Weighted
7. Fuzzy logic is based on natural language. Process Average
1. Presentation 1. Presentation materials 4
deleted/lost/not getting
2.8 Fuzzy FMEA (Failure Mode and Effect carried away
Analysis) 2. Facilities on site 2
presentations inadequate
Fuzzy logic is one method to analyze systems that contain 3. Team members did not 2
uncertainty (Kusumadewi, 2002). Research using Fuzzy attend the presentation
Logic will get more accurate results than using 4. Termination of 5
unilateral presentation
conventional FMEA. According to Xu et al. (2002) and
by the client
Yeh & Hsieh (2007), some weaknesses Conventional 2. Meeting 5. Disagreements bout the
FMEA namely: Concept concept of team and 2
1. Statement of the FMEA often subjective and client
qualitative described in natural language. 6. The objection about the 4
2. Three levels of severity parameter (S), occurance (O) payment schedule
and detection (D) are assumed to have similar 3. Photo 7. Equipment for photo 5
interests, it turns out in practice the weight of the Session session is damaged
interests of all three parameters are not the same. 8. Bad weather when the 2
concept of photo out door
3. The value of risk priority number (RPN) were 9. Some students were
produced by multiplying the level of S, O and D may absent/late when the 3
imply a representation of risk. photo session
To overcome the weakness - the weakness of the 10. The late photographer 2
method is based on fuzzy logic is often used to manipulate team attendance
the linguistic terms used directly in making a critical 11. Errors photo location 2
assessment. According to Iqbal et al. (2013), Fuzzy information
system is a knowledge-based system that is built on the 12. Unable to permit the
shooting lovation
expertise and experience in the form of fuzzy IF-THEN (location not in a public
3
rules. Fuzzy inference method FMEA performed using area)
4
MATEC Web of Conferences 154, 01084 (2018) https://doi.org/10.1051/matecconf/201815401084
ICET4SD 2017
4. Photo 13. Computer problems 5 The results in Table 4 are then selected risks that have the
Editing (hank on/off) highest average weight (score 5) for further processed
14. File data is lost 5 using FMEA method. The main objective was to
15. Misinformation 3 determine the method FMEA RPN value for each risk.
(different between the
RPN value is obtained by multiplying the value of
photo and description)
5. Printing 16. The printer is trouble 5
severity, occurence and earlier detection that these values
17. Result of the finishing 5 have been obtained through brainstorming and document
not appropriate review. RPN value can be seen in Table 5.
6. Delivery 18. Delay in delivery 5
Code
OCC
DET
RPN
SEV
Failure Failure Failure Control
5
MATEC Web of Conferences 154, 01084 (2018) https://doi.org/10.1051/matecconf/201815401084
ICET4SD 2017
Here are some strategies for each risk than risk having the
highest priority to low priority based on the calculation
FRPN (Fuzzy Risk Priority Number):
Fig 3. Output variable membership function 1. Risk Priority 1: Computer problems (hang on / off)
when editing pictures with a value FRPN 9
3.3 Deffuzyfication - Risk Mitigation
- Installation of double generator or UPS
Input from the process is the set Fuzzy defuzzyfication (Uninterruptible Power Supply) for all
resulting from the process of composition and output is a workstations
value of One technique used in defuzzyfication is Center - Regular checks of the computer used (at least
Of Gravity (Centroid). In Centroid, the output value is 1x1 month)
obtained based on the gravity of the decision-making - Reset the computer's power cable installation on
process yield curve. In this study, defuzzification is used the layout of photo editing special work
to find the value of output in the form of FRPN value of 2. Risk Priority 2: The delay in the delivery process with
the input that has been entered. Inputs come from both the a value of RPN 9
6
MATEC Web of Conferences 154, 01084 (2018) https://doi.org/10.1051/matecconf/201815401084
ICET4SD 2017
7
MATEC Web of Conferences 154, 01084 (2018) https://doi.org/10.1051/matecconf/201815401084
ICET4SD 2017