0% found this document useful (0 votes)
45 views9 pages

Quality Control

Quality control is a process that evaluates output against standards and takes corrective action when needed. Key aspects of quality control include inspection phases and points, centralized vs on-site inspection, statistical process control (SPC) to evaluate process stability and capability, control charts to distinguish random and non-random variation, and determining appropriate sampling and control limits. Process capability determines if a stable process can produce outputs within the allowed specification range given inherent process variability.

Uploaded by

AbdAllah Khodary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views9 pages

Quality Control

Quality control is a process that evaluates output against standards and takes corrective action when needed. Key aspects of quality control include inspection phases and points, centralized vs on-site inspection, statistical process control (SPC) to evaluate process stability and capability, control charts to distinguish random and non-random variation, and determining appropriate sampling and control limits. Process capability determines if a stable process can produce outputs within the allowed specification range given inherent process variability.

Uploaded by

AbdAllah Khodary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Quality Control CH.

10
What is Quality Control?
— A process that evaluates output relative to a standard and takes
corrective action when output doesn’t meet standards
— If results are acceptable no further action is required
— Unacceptable results call for correction action

Phases of Quality Assurance

Inspection

— Inspection issues:
1. How much to inspect and how often
2. At what points in the process to inspect
3. Whether to inspect in a centralized or on-site location
4. Whether to inspect attributes or variables

Where to Inspect in the Process


— Typical Inspection Points:
— Raw materials and purchased parts
— Finished products
— Before a costly operation
— Before an irreversible process
— Before a covering process
Centralized vs. On-Site Inspection
— Effects on cost and level of disruption are a major issue in selecting
centralized vs. on-site inspection
— Centralized
— Specialized tests that may best be completed in a lab
— More specialized testing equipment
— More favorable testing environment
— On-Site
— Quicker decisions are rendered
— Avoid introduction of extraneous factors
— Quality at the source

Statistical Process Control (SPC)


— Quality control seeks
— Quality of Conformance
— A product or service conforms to specifications
— A tool used to help in this process:
— SPC
— Statistical evaluation of the output of a process
— Helps us to decide if a process is “in control” or if
corrective action is needed

Process Variability
— Two basic questions: concerning variability:
1. Issue of Process Control
— Are the variations random? If nonrandom variation is
present, the process is said to be unstable.
2. Issue of Process Capability
— Given a stable process, is the inherent variability of the
process within a range that conforms to performance
criteria?

Variation
— Variation
— Random (common cause) variation:
— Natural variation in the output of a process, created by
countless minor factors
— Assignable (special cause) variation:
— A variation whose cause can be identified.
— A nonrandom variation
Sampling and Sampling Distribution
— SPC involves periodically taking samples of process output and
computing sample statistics:
— Sample means
— The number of occurrences of some outcome
— Sample statistics are used to judge the randomness of process
variation

— Sampling Distribution
— A theoretical distribution that
describes the random variability of
sample statistics
— The normal distribution is commonly
used for this purpose
— Central Limit Theorem
— The distribution of sample averages
tends to be normal regardless of the
shape of the process distribution

Control Process
— Sampling and corrective action are only a
part of the control process
— Steps required for effective control:
— Define: What is to be controlled?
— Measure: How will measurement be
accomplished?
— Compare: There must be a standard of
comparison
— Evaluate: Establish a definition of out of control
— Correct: Uncover the cause of nonrandom variability and fix it
— Monitor: Verify that the problem has been eliminated

Control Charts:
The Voice of the Process
— Control Chart
— A time ordered plot of representative
sample statistics obtained from an
ongoing process (e.g. sample means), used to distinguish
between random and nonrandom variability

— Control limits
— The dividing lines between random and nonrandom
deviations from the mean of the distribution
— Upper and lower control limits define the range of
acceptable variation

Errors
— Type I error
— Concluding a process is not in control when it actually is.
— The probability of rejecting the null hypothesis when the
null hypothesis is true.
— Manufacturer’s Risk
— Type II error
— Concluding a process is in control when it is not.
— The probability of failing to reject the null hypothesis
when the null hypothesis is false.
— Consumer’s Risk

Control Charts for Variables


— Variables generate data that are measured
— Mean control charts
— Used to monitor the central tendency of a process.
— “x- bar” charts
— Range control charts
— Used to monitor the process dispersion
— R charts

Establishing Control Limits


k

å xi k

x = i =1 å Ri
k R = i =1

w h e re k
x = A v e ra g e o f s a m p le m e a n s
w h e re
x i = m ea n o f s am p le i R = A v e ra g e o f sa m p le ra n g e s
k = n u m b er o f s am p les R i = R an g e o f sa m p le i

Factors for 3-s control limits for x, and R charts


X-Bar Chart: Control Limits
— Used to monitor the central tendency of a process

x - c h a r t C o n t r o l L im it s
U C L x
= x + A 2 R
L C L x
= x - A 2 R
w h e re
A 2 = a c o n t r o l c h a r t f a c t o r b a s e d o n s a m p le s iz e , n

Range Chart: Control Limits


— Used to monitor process dispersion

R C h a r t C o n t r o l L im it s
U C L R = D 4 R
L C L R = D 3 R
w h e re
D 3 = a c o n t r o l c h a r t f a c t o r b a s e d o n s a m p le s iz e , n
D 4 = a c o n t r o l c h a r t f a c t o r b a s e d o n s a m p le s iz e , n

Using Mean and Range Charts


— To determine initial control limits:
— Obtain 20 to 25 samples
— Compute appropriate sample statistics
— Establish preliminary control limits
— Determine if any points fall outside of the control limits
— If you find no out-of-control signals, assume the process is
in control
— If you find an out-of-control signal, search for and correct
the assignable cause of variation
— Resume the process and collect another set of observations on
which to base control limits
— Plot the data on the control chart and check for out-of-control
signals

Control Charts for Attributes


— Attributes generate data that are counted.
— p-Chart
— Control chart used to monitor the proportion of defectives
in a process
— c-Chart
— Control chart used to monitor the number of defects per
unit
Use a p-chart:
— When observations can be placed into two categories.
— Good or bad
— Pass or fail
— Operate or don’t operate
— When the data consists of multiple samples of several observations
each

p-chart Control Limits

T o t a l n u m b e r o f d e f e c t i v e s
p =
T o t a l n u m b e r o f o b s e r v a t i o n s

p (1 - p )
U C L p = p + z ( )
n

p (1 - p )
L C L p = p - z ( )
n

Use a c-chart:
— Use only when the number of occurrences per unit of measure can be
counted; non-occurrences cannot be counted.
— Scratches, chips, dents, or errors per item
— Cracks or faults per unit of distance
— Breaks or Tears per unit of area
— Bacteria or pollutants per unit of volume
— Calls, complaints, failures per unit of time

U C L c = c + z c
L C L c = c - z c

Managerial Considerations
— At what points in the process to use control charts
— What size samples to take
— What type of control chart to use
— Variables
— Attributes

Process Capability

— Once a process has been determined to be stable, it is necessary to


determine if the process is capable of producing output that is within
an acceptable range
— Tolerances or specifications
— Range of acceptable values established by engineering
design or customer requirements
— Process variability
— Natural or inherent variability in a process
— Process capability
— The inherent variability of process output (process width)
relative to the variation allowed by the design
specification (specification width)
Cp : Process Capability Ratio
U TL - LTL
C p =
6
w h e re
U T L = u p p e r t o l e r a n c e ( s p e c i f i c a t io n ) l im i t
L T L = l o w e r t o l e r a n c e ( s p e c i f i c a ti o n ) l im i t

• For a process to be deemed to be capable, it must


have a capability ratio of at least 1.33.
(30 parts/million are not within specifications)
• 6s has a process capability ratio of 2.
(3 parts/million are not within specifications)

Cpk : Process Capability Index


— Used when a process is not centered at its target, or nominal, value

C pk = m i n {C pu ,C pl }
ìU T L - x x - L T L ü
= m in í , ý
î 3 3 þ
Improving Process Capability
— Simplify
— Standardize
— Mistake-proof
— Upgrade equipment
— Automate

Operations Strategy
— Quality is a primary consideration for nearly all customers
— Achieving and maintaining quality standards is of strategic
importance to all business organizations
— Product and service design
— Increase capability in order to move from extensive use of
control charts and inspection to achieve desired quality
outcomes

You might also like