M/S Rajaram Construction - Jalore "Aa" Class PWD Contractor

This document provides details of the existing and proposed culvert structures along the Rajegaon-Kirnapur-Lanji-Amgaon road project. It lists 8 locations where existing 1000mm diameter HPC pipes will be replaced by new 1000mm diameter HPC pipes with increased width of 12.50m. It also lists 4 locations where new 2m wide single span slab culverts will be constructed to match the increased road width of 12.50m. The document serves to detail the culvert works required to upgrade and widen the road as per the project design.

Uploaded by

fevahe756
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
233 views10 pages

M/S Rajaram Construction - Jalore "Aa" Class PWD Contractor

This document provides details of the existing and proposed culvert structures along the Rajegaon-Kirnapur-Lanji-Amgaon road project. It lists 8 locations where existing 1000mm diameter HPC pipes will be replaced by new 1000mm diameter HPC pipes with increased width of 12.50m. It also lists 4 locations where new 2m wide single span slab culverts will be constructed to match the increased road width of 12.50m. The document serves to detail the culvert works required to upgrade and widen the road as per the project design.

Uploaded by

fevahe756
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

M/S RajaRam Co

CONSTRUCT

Name of Work : -- Construction o


Agreement No. :-

Date of Commencement :--09.12.2019 , Date of Complation :--08.12.2021

BAR CH

S. Activity Value (in lacs) Dec. -19 Jan. -20 Feb. -20 Mar. -20 Apr. -20 May. -20 Jun. -20
No.

T 11.21 7.00 4.21


1 Site Clearence
A

T 775.43 85.00 220.00 285.00 85.43 30.00 30.00


2 Earth Work
A

T 799.79 80.00 85.00 120.00 85.00 60.00


3 CRM
A

T 205.79 20.00 22.00 24.00 20.00 16.00


4 Selectiv
Soil/Shoulder
A

T 871.97 60.00 90.00 95.00 90.00


5 WMM
A

T 76.84 15.00 30.00 20.00 11.84


6 CD Work
A

T 1253.48 30.00 65.00 95.00 90.00 75.00


7 CC Work
A

T 55.34 10.00 12.00 10.00 15.00 8.00


7 Protection Work/
Retaining Wall
A

T 1898.74 185.00 275.00 220.00


8 B/T Work
A

T 442.41 0.50
9 Road Furnitur
9 Road Furnitur
A

10 Span Span of Time 23 day 31 day 29 day 31 day 30 day 31 day 30day

11 Time 731 day 23 54 83 114 144 175 205

12 Amount 6391.00 7.00 89.71 375.00 559.00 629.43 621.84 499.00

13 Cumulative Amount 7.00 96.7 471.7 1030.7 1660.1 2282.0 2781.0

Project Manager Sub Engineer


RajaRam Construction PWD. Sub. Div. Lanji
RajaRam Construction - Jalore "AA" Class PWD Contractor
CONSTRUCTION PROGRAM FOR Job No. CRF/MP/2018-19-07

Construction of Rajegaon-Kirnapur-Lanji-Amgaon road, Road length 57.400 KM


Agreement No. :-- 06/CRF/2019-20 , Work order Amount :- 63,91,00,000/-

on :--08.12.2021 T = Target A = Achivement

BAR CHART SCHEDULE / CONSTRUCTION PROGRAM

Jul. -20 Aug. -20 Sep. -20 Oct. -20 Nov. -20 Dec. -20 Jan. -21 Feb. -21 Mar. -21 Apr. -21 May. -21 Jun. -21 Jul. -21

10.00 10.00 10.00

10.00 25.00 50.00 100.00 60.00 50.00 40.00 34.79

2.00 14.00 18.00 26.00 10.00 15.00 6.00 7.00 5.79

85.00 21.00 70.00 70.00 100.00 60.00 50.00 45.00 35.79

70.00 25.00 10.00 50.00 80.00 100.00 100.00 90.00 110.00 105.00 90.00 35.0

0.34

50.00 150.00 180.00 180.00 210.00 220.00 228.00 0.74

10.00 12.00 12.00 120.00


31 day 31 day 30day 31 day 30day 31 day 31 day 28 day 31 day 30 day 31 day 30day 31 day

236 267 297 328 358 389 420 448 479 509 540 570 601

177.34 35.00 22.00 12.00 170.00 378.00 476.00 450.00 425.00 426.00 419.79 132.32 155.00

2958.3 2993.3 3015.3 3027.3 3197.3 3575.3 4051.3 4501.3 4926.3 5352.3 5772.1 5904.4 6059.43

Sub Divisionl Officer Executive Engineer


PWD. Sub. Div. Lanji PWD. Div.Balaghat
Aug. -21 Sep. -21 Oct. -21 Nov. -21 Dec. -21

10.00

25.0 8.48

80.00 75.00 75.00 50.00 7.91


31 day 30day 31 day 30day 8day

632 662 693 723 731

105.00 83.48 75.00 60.00 7.91

6164.43 6247.91 6322.91 6382.91 6390.82

Superidenting Engineer
PWD. Circle Seoni
M/S RajaRam Construction Jalore ( Raj.)
CONSTRUCTION PROGRAM FOR Job No. CRF/MP/2018-19-07

Name of Work : -- Construction of Rajegaon-Kirnapur-Lanji-Amgaon road, Road length 57.400 KM

Agreement No. :-- 06/CRF/2019-20 , Work order Amount :- 63,91,00,000/-

Date of Commencement :--09.12.2019 , Date of Complation :--08.12.2021 , T = Target & A = Achivement

As per Schedule-J [See Clause 10.3(ii)]


Construction Period = 09.12.2019 to 08.12.2021 = 731 days

Milestone-I/First Milestone- Milestone-III/Third Milestone-IV/Final


Milestone/Span Span II/Second Span Span Span

Time Alloted 255 days 183 days 183 days 110 days

Time Alloted Cumulative as Month 255 days 438 days 621 days 731 days

Time alloted as per Date 09.12.19 to 19.08.20 20.08.2020 to19.02.2021 20.02.2021 to 20.08.2021 21.08.2021 to 08.12.2021

Work Done Required in Particular 6.391 Cr. 15.980 Cr. 22.369 Cr. 19.170 Cr.
Milestone/span

Work Done Required in Cumulative 6.391 Cr. 22.371 Cr. 44.740 Cr. 63.910 Cr.
span

Project Manager Sub Engineer Sub Divisionl Officer Executive Engineer Superidenting Engineer
RajaRam Construction PWD. Sub. Div. Lanji PWD. Sub. Div. Lanji PWD. Div.Balaghat PWD. Circle Seoni
Detail of HPC PIPE Culvert ( Existing structure and Proposed 1000mmx12.50m)

S.No. Chainage as per Type of Strecture Actual Proposed HPCRow Remark


DPR Chainage

1 28+200 HPC-1x1000 (width-7.50m) HPC-1x1000 (width-12.50m) New

2 31+800 HPC-1x1000 (width-7.50m) HPC-1x1000 (width-12.50m) New

3 36+200 HPC-1x1000 (width-7.50m) HPC-1x1000 (width-12.50m) Widening

4 44+400 HPC-1x1000 (width-7.50m) HPC-1x1000 (width-12.50m) New

5 46+600 HPC-1x1000 (width-7.50m) HPC-1x1000 (width-12.50m) Widening

6 50+600 HPC-1x1000 (width-7.50m) HPC-1x1000 (width-12.50m) Widening

7 56+400 HPC-1x1000 (width-7.50m) HPC-1x1000 (width-12.50m) New

8 58+400 HPC-1x1000 (width-7.50m) HPC-1x1000 (width-12.50m) Widening

10
Detail of Slab culvert ( Existing structure and Proposed 2 m x 1 span)

S.No. Chainage as Type of Strecture Actual Chainage Proposed Slab culvert Remark
per DPR

1 31+400 1 span 2 M Slab culvert


(width-12.50m)

1 span 2 M Slab culvert


2 45+400 (width-12.50m)

3 46+400 1 span 2 M Slab culvert


(width-12.50m)

4 50+800 1 span 2 M Slab culvert


(width-12.50m)