Dayang Enterprise Sdn. BHD.: INSPECTION AND TEST PLAN (Vessel Buttering Repair)
Dayang Enterprise Sdn. BHD.: INSPECTION AND TEST PLAN (Vessel Buttering Repair)
(61505-V)
Page 1 of 3
DAYANG ENTERPRISE SDN. BHD.
(61505-V)
Page 2 of 3
DAYANG ENTERPRISE SDN. BHD.
(61505-V)
I Inspect : Verification inspection or test activity, jointly carried out by NIPPON & DESB team.
H Hold : No further work progress until the activity is verified and approval given.
D Documentation : Production of document record which verifies the inspection or test activity and compiles.
W Witness : QAQC to give notice before activity takes place, for Client to witness.
Page 3 of 3