Macro - Excel - MRP USA

This document contains a bill of materials listing code, quantity, availability, security stock, and lead time for components at different levels. It also shows an explosion MRP with gross requirements and an explosion report detailing an action made for component C1 in week -1.

Uploaded by

Ahmad Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views5 pages

Macro - Excel - MRP USA

This document contains a bill of materials listing code, quantity, availability, security stock, and lead time for components at different levels. It also shows an explosion MRP with gross requirements and an explosion report detailing an action made for component C1 in week -1.

Uploaded by

Ahmad Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

BILL OF MATERIALS

DATA DELETE DATA HELP

LEVEL 0
CODE A
AVAILABILITY 500
SECURITY STOCK 200
LEAD TIME 2
WEEKS 8

LEVEL 1
CODE B C D
QUANTITY 2 1 300
AVAILABILITY 300 100 200
SECURITY STOCK 115 100 500
LEAD TIME 3 2 3

LEVEL 2
CODE B1 C1
QUANTITY 2 3
AVAILABILITY 300 900
SECURITY STOCK 170 500
LEAD TIME 2 3
RELATION B C
###
###
EXPLOSION MRP
GROSS REQUIREMENTS EXPLOSION DELETE DATA

LEVEL 0
REPORT OF ACTIONS

ARTICLE DESCRIPTION OF ACTION


Code : C1 In week -1 it was made 950 uds.