Field Dry Density Calculation

This document reports the results of a field density test conducted using the sand replacement method according to IS 2720 Part - 28. The test was performed at a test pit location in OCBS - Package 9, Dharwad at an average depth of around 150 mm. Four tests were conducted to determine the bulk density, moisture content, dry density and compaction percentage at the site. The average compaction obtained on site based on the four tests was 0.00%.

Uploaded by

Ahteshaam Mulla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
490 views3 pages

Field Dry Density Calculation

This document reports the results of a field density test conducted using the sand replacement method according to IS 2720 Part - 28. The test was performed at a test pit location in OCBS - Package 9, Dharwad at an average depth of around 150 mm. Four tests were conducted to determine the bulk density, moisture content, dry density and compaction percentage at the site. The average compaction obtained on site based on the four tests was 0.00%.

Uploaded by

Ahteshaam Mulla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

FIELD DENSITY TEST BY SAND REPLACEMENT METHOD

(As per IS 2720 Part - 28)


Customer: Report No
Date of Issue
Your Ref. N Verbal
Date
Test Pit Location OCBS - Package 9, Dharwad.
Depth of Hole ~150 mm (Average) 2.33
Bulk Density of Sand (γs) 1.29 g/cc 5.88%
FIELD DENSITY

Pouring Cylinder No.

Test Location 1 2 3 4

Wt. Of wet material from hole, Ww (g)

Wt. of sand + Cylinder before pouring, W1 (g)

Wt. of sand + Cylinder after pouring, W2 (g)

Wt. Of Sand in cone, W3 (g)

Wt. Of sand in hole, W4 = (W1 - W2 - W3) (g) 0 0 0 0

Volmume of the Pit, V=W4/γs (cc) 0.000 0.000 0.000 0.000

Bulk Density of material in the hole γb = {(Ww / V} g/cc #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Moisture Content (Drying Method)

Moisture Content (%)

RESULTS
Field dry density γd = γb/(1+W/100) g/cc

Compaction obtained, (100 x γd / γMDD) (%) 0.00 0.00 0.00 0.00

Average Compaction Obtained On Site (%) 0.00

Remarks : -- The average compaction of site is computed based on 4 results, test was conducted in p

Test Engineer
1