Frequency of Test / Checks Sr. No - Title Doc. No. Frequency of Test / Check Relevant IS Codes 1. Soil

1. The document outlines the frequency of testing and checks for various construction materials used on projects including soil, aggregates, bricks, cement, reinforcement steel, structural steel, and concrete. 2. Tests include things like core cutter tests for soil, sieve analysis and crushing value for aggregates, water absorption and compressive strength for bricks, consistency and strength tests for cement, tensile tests for steel, and slump and compressive strength tests for concrete. 3. The frequency of testing ranges from once for each material source to daily checks for things like bulkage of sand, with more frequent testing required for higher material quantities. Inspection and testing results are to be recorded in a status log.

Uploaded by

AV Chavda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views5 pages

Frequency of Test / Checks Sr. No - Title Doc. No. Frequency of Test / Check Relevant IS Codes 1. Soil

1. The document outlines the frequency of testing and checks for various construction materials used on projects including soil, aggregates, bricks, cement, reinforcement steel, structural steel, and concrete. 2. Tests include things like core cutter tests for soil, sieve analysis and crushing value for aggregates, water absorption and compressive strength for bricks, consistency and strength tests for cement, tensile tests for steel, and slump and compressive strength tests for concrete. 3. The frequency of testing ranges from once for each material source to daily checks for things like bulkage of sand, with more frequent testing required for higher material quantities. Inspection and testing results are to be recorded in a status log.

Uploaded by

AV Chavda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

Frequency of Test / Checks

Sr. Title Doc. No. Frequency of Test / Check Relevant IS


No Codes
.
1. Soil IS 2720
a) Core cutter test FCN-LB-05  2
At every 100 m of compacted area for
small plinth filling
 At every 500 m3. of compacted earth filling
for mass filling work
b) Standard Proctor Test FCN-LB-06  Once for each source of earth
2. Coarse Aggregate / Fine Aggregate
a) Specific gravity FCN-LB-04  Once or Charge in source IS 2430 - 1986
b) Bulkage of Sand -  In monsoon/Rainy season when concreting
is done by volumetric batching this test is to
be performed daily and necessary Bulkage
corrective to be applied
c) Dry/Loose Bulk density -  As and when required
d) Silt content in Sand FCN-LB-07 For each source
e) Aggregate impact value FCN-LB-08  If the source explored between 501-1500
f) Sieve analysis of cum take one gross sample at each 100
aggregate cum.
g) Aggregate crushing  If the source explored between 1501-5000
value cum, take one gross sample at each 200
h) Flakiness Index cum.
Thickness Test
3. Bricks IS 5454-1978
a) Visual Check -  Total 20 Nos. of Bricks to be selected from
b) Dimensioned Check - three trucks (i.e.; 6 to 7 bricks from each
Truck)
c) Water absorption FCN-LB-09  For each source Random 3 Nos. to be tested
d) Compressive strength from 20 Nos. of bricks as selected in 6 (i) &
6(ii)

Sr. Title Doc. No. Frequency of Test / Check Relevant IS


No Codes
.
4. Cement IS 3535 -
1986
i. Fineness of cement Manufacturer  For each batch received at site
ii. Standard Test certificate
consistency of or
cement Outside
iii. Setting time laboratory or
iv. Compressive FCN-LB-12
strength
v. Soundness
5. Reinforcement Steel IS 1786-1985
i. Rolling margin FCN-LB-15  For bar dia. < 10mm – One sample from
each 25 tonne or part thereof
 For bar dia. 10mm to 16mm – One sample
from each 35 tonne or part thereof
 For bar dia above 16mm – One sample
from each 45 tone or part thereof
 One sample consists of 3 Nos. of bars of
at least 0.5m length
ii. Tensile Test Manufacturer  For each lot received at site
iii. Elongation Test Certificate
iv. Bend – Rebend test or Test Report
from outside
laboratory
6. Structural Steel IS 2062-1992
i. Rolling Margin FCN-LB-15  One sample for each 20 MT or part thereof

ii. Tensile test Manufacturer


iii. Elongation Test Certificate
iv. Bend – Rebend test or Test Report
from outside
laboratory

Sr. Title Doc. No. Frequency of Test / Check


No
.
7. Concrete
i. Slump Test FCN-LB-10  For each concrete cube set
ii. Compressive  The cube samples shall be taken for each grade of concrete
strength for following daily concrete quantity
Qty. of concrete in Number of Samples
Cum (Daily)
1-5 1
6-15 2
16-30 3
31-50 4
51 and above 4 plus one additional for each 50 cum.
of concrete
 One sample consists of six nos of cubes. Three for 7 days
and three for 28 days strength. However where 7 days
strength is not required the sample size may be reduced to
three nos of cubes for 28 days strength only.
 Standard deviation to be taken every month
 The frequency is to maintain for initial period, till consistent
results are obtained. It may be reduced as per engineer
incharge’s discretion
8. Calibration of test FCN-LB-01  As per frequency set in Laboratory Manual
equipment
9. Inspection and test status FCN-CC-01  Daily
10. Control of non conforming FCN-CC-03  On occurrence of Nonconformity
product
Inspection And Test Status

Sr. Date of Component of Reference Conforming Conforming Non- Initials of


No. inspecti product / Activity Drg. No. / to Drg. to conformity if inspecting
on checked Doc. No. specification any authority
Yes No Yes No

CONTROL OF NON CONFORMING PRODUCT


Site :___________________
Location:________________

Description of non-conformity :
 
 
 
 
 

Identified by : _________________ Date :_____________


Action to be taken :

Reworked Acceptable with/out repair Acceptance for alt. use Rejected / scrapped

 
 
 
 
Duration for disposition of the non-conformity : Action to be carried
out by:

Verification :

Remarks if any : Verified by : ______________ Date : ____________