Site Grading Plan
Separate Site Grading Plan and Stormwater Management Plans may be required.
Scale
Metric Scale
Must be drawn to a standard scale (i.e. 1:100, 1:200, 1:500)
Toronto Green Standard
If the proposal is subject to the requirements of the TGS and was submitted prior to January
1, 2014, the applicant is required to illustrate compliance with the following TGS Checklist
sections:
Low-Rise Non-Residential Building – 2010
Tier 1: Tier 2:
WQ 1.1, WQ 2.1, WQ 2.2, WQ 3.1, WQ 3.2 WQ 2.3
Low-Rise Residential Building – 2010
Tier 1: Tier 2:
WQ 1.1, WQ 2.1, WQ 2.2, WQ 3.1, WQ 3.2 WQ 2.3
Mid-High Rise Residential, Commercial, Industrial and Institutional – 2010
Tier 1: Tier 2:
WQ 1.1, WQ 2.1, WQ 2.2, WQ 3.1, WQ 3.2 WQ 2.3
If the proposal is subject to the requirements of the TGS and has been submitted on or after
January 1, 2014, the applicant is required to illustrate compliance with the following TGS
Checklist sections:
Low-Rise Residential Development – 2014 Version 2.0
Tier 1:
WQ 1.1, WQ 2.1, WQ 2.2, WQ 3.1, WQ 3.2
Mid-High Rise Residential and Low Rise Industrial,Commerical and Instiutional – 2014
Version 2.0
Tier 1:
WQ 1.1, WQ 2.1, WQ 2.2, WQ 3.1, WQ 3.2
General Details
All property lines must be shown
Ground floor plan for all buildings must be shown
Ravine by-law limit, if applicable
All easements, and reserves
Site Circulation, General Parking, Accessible Parking and Driveways
All adjacent roads and sidewalks must be shown
Public & Private Servicing Information
The location of proposed utilities, transformers, gas regulators, air intakes/exhausts, garage
access stairs on the site and on adjacent road allowances must be shown
Proposed roof control devices location, type, control release rates and corresponding storage
volumes for flat roof portions
UV treatment facilities and/or oil grit separators
Storage facilities and dimensions/details for rainwater harvesting and reuse (e.g. Cisterns)
Landscaping, Grading & Retaining Walls and Lighting
All retaining walls must be shown
General grading information including the existing and proposed elevations at 6-metre
intervals along property lines, driveways, sidewalks and walkways and trees to be preserved,
including all trees on adjacent properties within 6 metres of subject site’s property/lot lines
Proposed elevation at 6-metre intervals along all building and structure perimeters and
building entrances
Storm and surface water drainage directions, site ponding limits with corresponding control
volumes and control facilities, major overland and emergency overland flow routes
Soil retention and/or replacement details
Sediment and erosion control measures applied during construction
Location and identification of trees protected under City by-laws
Location of tree protection zones (where trees are being retained & protected)
Tree protection plan notes (where trees are being retained & protected)
Buried watercourses, if applicable