MEENAKSHI ENERGY LIMITED

2X150MW coastal thermal power


plant, Thaminapattinam,

SPRS Nellore
Title: MEPL-PRC-OMD-MME-039
Page: Page 1 of 6
Date: 28/07/2015 Weekly Maintenance of Coal Crusher and
Rev: A it’s components
Department-Mechanical

MEL POWER PLANT


Weekly Maintenance of Coal
Crusher and it’s components

VVN.MURTH D.Srinivasul
A 28/07/2015 C.Holiram First issue
Y u

REV DATE PREPARED BY SIGN CHECKED BY SIGN APPROVED BY SIGN REASON FOR

REVISION

REVISION CHART
PAGE REVISION PAGE REVISION ATTACH REVISION
MENTS
A B C A B C A B C
1 X
2 X

3 X

4 X

5 X

6 X
MEENAKSHI ENERGY LIMITED
2X150MW coastal thermal power
plant, Thaminapattinam,

SPRS Nellore
Title: MEPL-PRC-OMD-MME-039
Page: Page 2 of 6
Date: 28/07/2015 Weekly Maintenance of Coal Crusher and
Rev: A it’s components
Department-Mechanical

Table of contents

1 Purpose.............................................................................................................................................4
2 Scope.................................................................................................................................................4
3 Responsibility..................................................................................................................................4
4 References.......................................................................................................................................4
5 Tools..................................................................................................................................................4
6 Procedures.......................................................................................................................................5
7 Records and Report......................................................................................................................6
MEENAKSHI ENERGY LIMITED
2X150MW coastal thermal power
plant, Thaminapattinam,

SPRS Nellore
Title: MEPL-PRC-OMD-MME-039
Page: Page 3 of 6
Date: 28/07/2015 Weekly Maintenance of Coal Crusher and
Rev: A it’s components
Department-Mechanical

1 Purpose
The preventive maintenance procedures listed below provide an easy means
of determining the operational status of the coal crusher. The preventive
maintenance procedures result in identification of possible trouble areas so
the condition will not deteriorate to the point where a failure is likely to
occur.

2 Scope
This procedure applicable for both the coal crushers.
MEENAKSHI ENERGY LIMITED
2X150MW coastal thermal power
plant, Thaminapattinam,

SPRS Nellore
Title: MEPL-PRC-OMD-MME-039
Page: Page 4 of 6
Date: 28/07/2015 Weekly Maintenance of Coal Crusher and
Rev: A it’s components
Department-Mechanical

3 Responsibility
Maintenance Engineer: Apply, receive and clear the permits.
Area Operator/SCE: Issue of permit.
Maintenance Execute the job safely and efficiently as per the
Technician: Standard Maintenance Procedure and fill the
protocols.

4 References
The information from standard Maintenance manual supplied by OEM.

5 Tools
 Necessary tool kit.
 Grease guns.
 Temperature gauge.
 Vibro meter
 portable grinding machine
 Cutting tools
 Welding Machine.
 Chain blocks.

6 Procedures
Following Procedure to be followed during the maintenance of Belt
conveyors.
MEENAKSHI ENERGY LIMITED
2X150MW coastal thermal power
plant, Thaminapattinam,

SPRS Nellore
Title: MEPL-PRC-OMD-MME-039
Page: Page 5 of 6
Date: 28/07/2015 Weekly Maintenance of Coal Crusher and
Rev: A it’s components
Department-Mechanical

Monthly Maintenance List

 Surface cleaning of the drive unit. Use brush and compressor air for
cleaning.
 Check the condition of the hammers.
 Check the beater bar fixtures on either sides.
 Check for correct V-belt tension; re-stress if necessary.
 Check for assessment of general condition of fixture.

7 Records and Report


 Record the information of work activity in the history.

Revision History:

Date Revision# Page # Purpose


28-07-2015 A All First Issue
MEENAKSHI ENERGY LIMITED
2X150MW coastal thermal power
plant, Thaminapattinam,

SPRS Nellore
Title: MEPL-PRC-OMD-MME-039
Page: Page 6 of 6
Date: 28/07/2015 Weekly Maintenance of Coal Crusher and
Rev: A it’s components
Department-Mechanical