Sravanthi Relay Setting Chart
Sravanthi Relay Setting Chart
Revision
Rev Descriptions Date Approved
0 R0-Issued for approval 11.07.11
OWNER
M/S.TATA CONSULTING ENGINEERS LIMITED, BANGALORE.
CONSULTANT
EPC M/s. SRAVANTHI INFRATECH PVT
CONTRACTOR LTD (EPC DEVISION)
EPC M/s. TOSHIBA TERMAL AND HYDRO POWER SYSTEM
SYSTEM
CONSULTANT COMPANY TOSHIBA INDIA PVT LTD.
Prepared by 11.07.11
STG RELAY SETTINGS
SRIRANGAN
Checked by 11.07.11 GREENESOL POWER SYSTEMS PVT. LTD.,
# 995, SERVICE ROAD,
ARK
RPC LAYOUT, VIJAYANAGAR,
Approved by 11.07.11 BENGALURU – 560 040.
DJY
CAD File Date: Size Scale Drawing No: P-1113-G60-1-RS
Office: GPSPL NA
Job Number: P-1113
Input Details
Generator data:
CT / PT Details
Generator 11.5 kV side, CT ratio: 5500/1 A
GROUND CT RATIO: 50/1 A
Generator PT ratio: 11.5kV/ √ 3/
3/ 110√ 3 V
Generator Protection
Calculation
The differential current pickup setting can be set as low as 5% of rated generator current, to
provide protection for as much of the winding as possible. Thus, to obtain maximum sensitivity,
the differential pickup current is chosen as 0.05 P.U.
Slope 1, set at 15% starting from 0.04 (Restrain Current) as shown below.
The STATOR DIFF BREAK 1 setting should greater than the maximum overload expected for the
machine, so it is set at 1.25 PU
Slope 2, set at 80 %.
The STATOR DIFF BREAK 2 setting is set at 3 PU.
6.0
5.0
) 4.0
T Operating
C
f Region
o Slope 2
s
e 3.0
l 80 %
p
i
t
l
u
M
( 2.
e
t 0 Restraint
a
r Region
e
Slope 1
p 15 %
O 1.0
I
0.5 Minimum Pickup = 0.5
Fig-1
Protection Setting
Calculation
System Details:
Stage 2 is typically set lower than Stage 1 with a time delay to prevent nuisance alarms for
external faults that are normally cleared by system protection.
Stage 2 pickup = 5.6% (70% of I 2 capability) with time delay of 10 sec.
Protection Setting
Calculation
Xd = 2.077 pu
X’d = 0.163 pu
MVA = 100
CTR/PTR = (5500 / 1) x (110/11500) = 52.6
Zbase (sec) = (base kV2 / base MVA) x (CT ratio / VT ratio)
= (11.5 kV 2 / 100 MVA) x (5500/ 104.5) = 69.63 Ω
Xd (sec) = Xd x Zb
= 2.077 ×69.63 =144.62 Ω
FIG-2
Protection Setting
Rated frequency is 50 Hz
UNDERFREQUENCY 1
Sl Protection Function Setting Available in the Recommended Remarks
No Relay Setting
1 Min Volt/Amp 0.10 to 1.25 p.u in steps 0.5 To Trip 86C
of 0.01
UNDERFREQUENCY 2
Sl Protection Function Setting Available in the Recommended Remarks
No Relay Setting
1 Min Volt/Amp 0.10 to 1.25 p.u in steps 0.5 To Trip 86B
of 0.01
Pickup 20.00 to 65.00 Hz in steps 47.5
of 0.01
Stage -1
Stage-2
These settings are used as backup for failure of AVR or other regulators. The time settings should
also be depended on the withstand levels of the machine
Calculations:
Trip stage-1 & 2 110 % of the rated Voltage
Calculations:
Trip stage-1 & 2 90 % of the rated Voltage
Protection Setting
VOLTS PER HERTZ 1 (Stage-1)
Sl Protection Function Setting Available in the Relay Recommended Remarks
No Setting
1 Pickup 0.80 to 4.00 p.u in steps of 1.35 ALARM
0.01
Calculation
Phase Instantaneous Over Current
Max. Fault current of Generator = 48741.74A (i.e 5020.4 / 0.103)
Therefore we have chosen the trip setting as 30% of the total fault value for protecting the
generator windings. i.e 48741x0.3 = 14622.52A. When it is converted into secondary we get
14622.52 / 5020.4 = 2.91 p.u
PROTECTION SETTING
Sl Protection Function Setting Available in the Relay Recommended Remarks
No Setting
Pickup 0.000 to 30.000 p.u in steps of 2.91 p.u
0.001
Delay 0.00 to 600.00 s in steps of
0
0.01
= 1.1 x 5020.4
5500
= 1.004P.U
T = TDM x K
I E
I Pick up -1
TDM = 0.16
Protection setting
Directional Power
Low Forward Power (37)
Assuming 10% as the minimum power below which the generator should trip on turbine faults, we
get: 10% of 80MW = 0.1 X 80 = 8 MW
= 8MW
= 0.073 P.U
Smin = - 0.0734 P.U (For Low forward power S MIN < 0. Refer ‘b’ diagram below)
Delay = 3 seconds
RCA = 180 ˚
Directional Power
RCA
Stage 1 SMIN –1.200 to 1.200 pu in steps - 0.0734 p.u 0.0743 p.u
of 0.001
Stage 1 Delay 0.00 to 600.00 s in steps 3 seconds 2 seconds
of 0.01
Stage 2 SMIN –1.200 to 1.200 pu in steps 0.0743 p.u NA
of 0.001
Stage 2 Delay 0.00 to 600.00 s in steps 2 seconds NA
of 0.01
Block VT FUSE FAIL OP VT FUSE FAIL OP
This element has two stages, stage 1 to Trip the machine & stage 2 for Alarm. Set the pickup to
0.15 for both stages to provide adequate overlap with the Auxiliary voltage element. Set stage 1
to 0.375V secondary (this value may be increased fo r security in particularly noisy environments).
Stage 2 is typically set at 0.3 V secondary. The supervision settings are expressed in per unit of
the Nominal phase VT secondary setting. The time delay settings are 5 seconds for stage 1 and 1
second for stage 2 elements respectively
This protection will be set after measurement of third harmonic voltage generated by the
machine at various loads.
Calculation
Protection Setting
PROTECTION SETTING
Sl Protection Function Setting Available in the Relay Recommended Remarks
No Setting
Accdnt Enrg Arming UV or Offline / UV & Offline UV & Offline
Mode
Accdnt Enrg OC pickup 0.00 to 3.00 p.u in steps of
1.0
0.01
Accdnt Enrg UV pickup 0.00 to 3.00 p.u in steps of 0.7
0.01
Accdnt Enrg Offline OFF, ON OFF
= 0.174 Ohm
= 0.1392 x 52.60
= 0.002450 Ohm
= 0.1940 x 52.60
= 10.20 Ohm
= j2.077 x 11.52
100
= j 2.746 Ohm
Back-up Impedance should have time delay marginally higher than the longest time delay employed in any of
the protection system which is tripping the Generator CB.
The out of step protection is used to detect a loss of synchronism of the generator. The
impedance locus is measured as compared with blinders and MHO circle.
UGnom = 11.5 KV
Secondary impedance calculated from primary impedance, CT generator neutral end ratio
and VT output ratio.
Xd = 2.077
Primary impedance calculated from nominal (generator) voltage and nominal apparent
power
Secondary impedance calculated from primary impedance, CT generator neutral end ratio
and VT output ratio.
Xd’ = 0.187
Primary impedance from nominal (generator) voltage and nominal apparent power
Secondary impedance calculated from primary impedance, CT generator neutral end ratio
and VT output ratio.
Primary impedance calculated from nominal (generator) voltage and nominal apparent
power
Secondary impedance calculated from primary impedance and CT generator output ratio.
The protective function operates if the impedance locus crosses first the right blinder and within a
time delay the left blinder.
Generator Impedance
Transformer Impedance
Zsext = 3.97Ω. exp (j.86 deg) (Assumed. Customer to give the exact value)
The impedance is based on 220KV and has to be adapted to the generator voltage,
System Impedance:
MHO Characteristic s
Reach =150%
The forward angle is equal to the angle of the system impedance as following:
Reach=200%
Blinder Calculation
Outer Blinder
Θout = 60 ˚
The offset between the right and left blinder is calculated according the picture above as following:
180 - Θout
˚
tan 2
Offsetout = . |Z| = 46.46 Ω
sin (arg(Z))
With this offset the position of the right and left blinder is as following:
180 - Θout
˚
Θin = 120˚
The offset between the right and left blinder is calculated according the picture above as following:
180 - Θin
˚
tan 2
Offsetin = . |Z| = 15.50 Ω
sin (arg(Z))
With this offset the position of the right and left blinder is as following:
180 - Θin
˚
PROTECTION SETTING
Sl Protection Function Setting Available in the Relay Recommended Remarks
No Setting
Power Swing Shape Mho, Quad Mho
Power Swing Mode Two step, Three step
TWO STEP
Power Swing Supv 0.050 to 30.00 p.u in steps of 0.6
0.001
Power Swing Fwd Rch 0.1 to 500.00 Ohm in steps of 14.8
0.01
Power Swing Quad Fwd 0.1 to 500.00 Ohm in steps of -
Rch 0.01
Power Swing Quad Fwd 0.1 to 500.00 Ohm in steps of -
Rch Mid 0.01
Power Swing Quad Fwd 0.1 to 500.00 Ohm in steps of -
Rch Out 0.01
Power Swing Fwd RCA 40 to 90Deg. in steps of 1 89.97
Power Swing Rev Reach 0.1 to 500.00 Ohm in steps of 32.8
0.01
Power Swing Quad Rev 0.1 to 500.00 Ohm in steps of -
Rch Mid 0.01
Power Swing Quad Rev 0.1 to 500.00 Ohm in steps of -
Rch Out 0.01
Power Swing Rev RCA 40 to 90Deg. in steps of 1 90