Manufacturing Quality Plan For Tank: FGD Sysyem, 2X550 MW Tps

This document provides a quality plan for manufacturing a tank with 3 key points: 1. It outlines inspection and testing requirements for materials, in-process work, and final assembly to ensure compliance with specifications. 2. Welding, non-destructive testing, dimensional checks, and water/pressure tests are specified at various steps to validate quality. 3. Responsibilities are designated for manufacturers, suppliers, and Tata Power to review quality documentation and sign off on the process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
239 views4 pages

Manufacturing Quality Plan For Tank: FGD Sysyem, 2X550 MW Tps

This document provides a quality plan for manufacturing a tank with 3 key points: 1. It outlines inspection and testing requirements for materials, in-process work, and final assembly to ensure compliance with specifications. 2. Welding, non-destructive testing, dimensional checks, and water/pressure tests are specified at various steps to validate quality. 3. Responsibilities are designated for manufacturers, suppliers, and Tata Power to review quality documentation and sign off on the process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

MANUFACTURING QUALITY PLAN FOR TANK

Project:
THERMAX LIMITED, ITEM: MQPNo: Package:
THERMAX ENVIRO DIVISION, TANK ContractNo:
LIMITED ENVIRONMENT HOUSE, Rev.No.: 00 Main-
PLOT NO.-90-92, BG Sub-VENDOR: Date: Supplier:
BLOCK, MIDC. BHOSARI,
PUNE 411 026

FGD SYSYEM, 2X550 MW TPS

Component AGENCY
SR. TYPE OF EXTENT OF REF. DOCUMENT/ FORMAT OF
Description / CHARACTERISTICS REMARKS
NO. CHECK CHECK ACCEPTANCE NORM RECORD
Activity
M S/C TPL
1 2 3 4 5 6 7 8 9 10 11
1.0 MATERIAL

As per standard/Tech.
Chemical &
MTC Specification/
1.1 Plates Mechanical 100% MTC P R R
review Approved datasheet/
Properties
Approved Drawing

As per standard/Tech.
Chemical &
Pipes, Flanges, MTC Specification/
1.2 Mechanical 100% MTC P R R
Fastners review Approved datasheet/
Properties
Approved Drawing

2.0 INPROCESS INSPECTION

Review of
Records, ASME Sec IX/ Relevant WPS,PQR & WPQ
2.1 Welding WPS,PQR,WPQ 100% P R R
Qualification standard
test
Surface As per standard/Tech. backchipped/
DPT-LS & CS
2.2 defect or 100% Specification/ DPT Report P R R back gauged
butt Joints Weld defect Approved Drawing area prefered

Shell Fabrication

Soundness As per standard/Tech. RT at random


RT-LS & CS
2.3 of Weld & 1% Specification/ RT Report P R R Including T
butt Joints
Visual Approved Drawing Section

Surface As per standard/Tech.


2.4 Nozzle to Shell DPT on Weld Joint defect or 100% Specification/ DPT Report P R R
Weld defect Approved Drawing

Dimension Confirmity
after Dish end Visual & As per standard/Tech. Dish end Shall
Dished End forming with be in one piece
2.5 Measureme 100% Specification/ Dish end Report P R R
(If applicable) templates Including nt Approved Drawing (no weld joint
thining (thickness) at permitted)
knuckle portion

As per standard/Tech.
Dished End MPT/PT on Knuckle Surface
2.6 100% Specification/ NDT Report P R R
(If applicable) Portion & weld edges defect
Approved Drawing

3.0 FINAL TEST & INSPECTION


Workmanship & Visual & As per standard/Tech.
3.1 Major Dimension Measureme 100% Specification/ Inspection Report P W W
Check nt Approved Drawing

As per standard/Tech.
PMI Check for (only Measureme
3.2 Random Specification/ PMI Report P R R
SS Vessel & tank) nt
Approved Drawing

Visual &
Measureme As per standard/Tech.
Overall
3.3 water Fill test nt 100% Specification/ Inspection Report P W W
Assembly
(No Approved Drawing
leakages)

Visual & standard/Tech.


3.4 RF Pad Pneumatic test Measureme 100% Specification/ Inspection Report P W W
nt Approved Drawing

Pickling & As per standard/Tech.


3.5 Passivation(only SS Visual 100% Specification/ Inspection Report P R R
Vessels & tank) Approved Drawing
As per standard/Tech.
Buffing (Only for ss
3.6 Visual 100% Specification/ Inspection Report P R R
Vessels & tanks) Approved Drawing
Surface
Preperation &
Painting
Visual & As per standard/Tech.
Appearance & DFT
3.7 Measureme 100% Specification/ Inspection Report P w R
Check for (CS tanks)
nt Approved Drawing

4.0 QUALITY DOSSIER

Document Review Quality As per standard/Tech.


4.1 Review & Dossier along with visual visual Specification/ IRN reprt H w w
Issuance of IRN Index Approved Drawing

Manufacturer/ Main-supplier LEGEND: D M-Manufacturer , S: Supplier TPL: Tata Power Ltd,P: Doc. No.
Sub supplier Perform W: Witness V: Physical Verification Rev No.0
R: Review documents, H: Hold
SR = Site Register , TR=Test Report, MTC = Manufacturer's Test
Certificate

Reviewed Approved
SIGNATURE Approval Seal
by by