P & I Diagram: Koncept Learning Center

This P&I diagram shows the piping and instrumentation for a chemical process involving Reactants A and B. It includes the transfer of materials between vessels like tanks and reactors using piping labeled with sizes and streams marked with identifiers. The diagram provides a visual overview of the flow of materials, instrumentation, and connections between major equipment in the process.

Uploaded by

IsaAl-rasyid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
156 views21 pages

P & I Diagram: Koncept Learning Center

This P&I diagram shows the piping and instrumentation for a chemical process involving Reactants A and B. It includes the transfer of materials between vessels like tanks and reactors using piping labeled with sizes and streams marked with identifiers. The diagram provides a visual overview of the flow of materials, instrumentation, and connections between major equipment in the process.

Uploaded by

IsaAl-rasyid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

P & I Diagram

Building up Confidence
Process Water
PID-8 PW 40-PW-12-15-XP1
From 08P002A/B

50NB 50NB

Reactant ‘A’
N1 N4 N5 100-FA-03-09-XA1
N8 N6 PID-1 FA
50NB To 01T001

25-FA-03-12-XA1
I LSH
03.1 0301
LAH
03T001
0301
80NB
LI LT N7 N2
EL +19.300M 0301 0301
N3 Reactant ‘A’
LAL 50-FA-03-02-XA1
0301 25NB PID-4 FA
Drain To 03R001B/C/D

25-PW-03-08-XP1
50-FA-03-05-XA1
FAH
25NB
0301
Drain
FIC Waste Gases
100-FG-03-10-XG1
0301 PID-9 FG
To 05C001

50-FA-03-04-XA1
FAL CR50X40
0301

I
03.2
FT
0301 M 50-CW-03-07-XC1
Cooling Water
PID-7 CW

CR50X40 To 07U001
FY 50NB
N7 15NB
I 80-FA-01-12-XA1 I N2 N6 CR80X50
0301 N1 N4 Vent
03.1 03.3 TI
TSHH I N5 TE
EL + 6.300M XV XV FCV 03.2 0302 0302
0302 0301
0301 0301 N9 CR80X50
Reactant ‘A’ TAH
CR50X25 CR50X25
PID-1 FA 0301
From 01P001A/B 25NB 25NB 25NB TI TE
Drain Drain Drain I
0301 0301 LSH
03R001A 0302 03.3
80-FA-03-01-XA1 50-FB-03-06-XB1 50-FA-03-03-XA1 TAL
Reactant ‘B’ LAH
50-FB-02-21-XB1 0301 N10 TW1
PID-2 FB 0302
80NB
From 02P001A/B 03R001AN01 LT LI
N8
Cooling Water 0302 0302
PID-7 CW 50-CW-10-17-XC1
LAL
N3
From 07P001A/B 25NB 0302
Drain

Product Slurry
100-FP-03-11-FP1 PID-4 FP
25NB To 04T001

Hose

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Symbolic Representation

for Communication

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Symbolic Representation

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Symbolic Representation

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Symbolic Representation

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Symbolic Representation

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Symbolic Representation

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Legend List
Koncept Learning Center [email protected]
P & I Diagram
Building up Confidence

Symbolic Representation

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Symbolic Representation

•Equipment
•Piping
•Instrument
•Electrical •Equipment
•Structure •Piping
•Civil •Instrument

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Chemistry

A+B P+G + Heat

Block Diagram
Koncept Learning Center [email protected]
P & I Diagram
Building up Confidence

A + B = P + G + Heat
Block Diagram
G

Scrubbing Water

To ETP
Water ‘W’
‘B’ ‘P’ Wet Dried
Reaction Filtration Drying Pulverizing
‘A’ + Cake Cake
‘A’ Filtrate
Cooling
‘W’ + ‘A’ Product
Waste
‘P’
Distillation

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

A + B = P + G + Heat
Block Diagram
G

Scrubbing Water

To ETP
Water ‘W’

Flow Sheet
‘B’ ‘P’ Wet Dried
Reaction Filtration Drying Pulverizing
‘A’ + Cake Cake
‘A’ Filtrate
Cooling
‘W’ + ‘A’ Product
Waste
‘P’
Distillation

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Flow Sheet M
03T001

Reactant ‘B’ CWR


From Bulk Storage
Reactant ‘A’
CWS
From Bulk Storage
03R001A/B/C/D
Recovered ‘A’
From Recovery

Slurry
To Filter

01T001 01P001A/B 02T001 02P001A/B 04T001 04P001A/B

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Flow Sheet M
03T001

Reactant ‘B’ CWR


From Bulk Storage
Reactant ‘A’
CWS
From Bulk Storage
03R001A/B/C/D
Recovered ‘A’
From Recovery

P&ID Slurry
To Filter

01T001 01P001A/B 02T001 02P001A/B 04T001 04P001A/B

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

FSHH
I.1

P&ID
201

FAH
201

FIC
201

FAL
201 FCV
201

L2004-80-FA-XA1 To T-301
PID-6
From P-101 A/B
L1006-100-FA-XA1 L2006-65-FA-XA1
PID-1 FT
201

50 NB
L2005-80-FA-XA1
100 NB

N1
N4 N5 L2003-80-FA-XA1

N3

PI PI
201A SP 201B

WEF1
CR80x65 CR80x65
L2001-100-FA-XA1 L2002-100-FA-XA1
ER100x80 ER100x80
I.1
LI N2 I.1
201 N6
N7

D
PW PW
WEF1

T-201 P-201 A P-201 B


WEF1

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

FSHH
201 I.1

Liquid Storage P & I D FAH


201

FIC
201

FAL
201 FCV
201

L2004-80-FA-XA1 To T-301
PID-6
From P-101 A/B
L1006-100-FA-XA1 L2006-65-FA-XA1
PID-1 FT
201

50 NB
L2005-80-FA-XA1
100 NB

N1
N4 N5 L2003-80-FA-XA1

N3

PI PI
201A SP 201B

WEF1
CR80x65 CR80x65
L2001-100-FA-XA1 L2002-100-FA-XA1
ER100x80 ER100x80
I.1
LI N2 I.1
201 N6
N7

D
PW PW
WEF1

T-201 P-201 A P-201 B


WEF1

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

FSHH
201 I.1

Details Included FAH


201

FIC
201

FAL
201 FCV
201

Identification Numbers for L2004-80-FA-XA1 To T-301


PID-6
From P-101 A/B
L2006-65-FA-XA1

•Equipment (T-201)
L1006-100-FA-XA1
PID-1 FT
201

50 NB
L2005-80-FA-XA1
100 NB

N1
N4 N5 •Pipeline (L2001-100-FA-XA1)
L2003-80-FA-XA1

N3

PI
201A
•Instrument (PI-201A) SP
PI
201B

WEF1
CR80x65 CR80x65

•Special Parts (PSV, RO)


L2001-100-FA-XA1 L2002-100-FA-XA1
ER100x80 ER100x80
I.1
LI N2 I.1
201 N6
N7

D
PW PW
WEF1

T-201 P-201 A P-201 B


WEF1

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

FSHH
201 I.1

Details Included FAH


201

FIC
201

FAL
201 FCV
201

L2004-80-FA-XA1 To T-301
PID-6
From P-101 A/B
L1006-100-FA-XA1 L2006-65-FA-XA1
PID-1 FT
201

50 NB
100 NB Critical Details L2005-80-FA-XA1

N1
N4 N5 L2003-80-FA-XA1

N3
•Minimum Distance
PI PI
201A SP 201B

WEF1
•Elevation CR80x65 CR80x65
L2001-100-FA-XA1 L2002-100-FA-XA1
ER100x80 ER100x80
I.1
LI N2 I.1
N6

•Slope
201
N7

D
PW PW
WEF1

T-201 P-201 A P-201 B


WEF1

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

FSHH
201 I.1

Details Included FAH


201

FIC
201

FAL
201 FCV
201

L2004-80-FA-XA1 To T-301
PID-6
From P-101 A/B
L1006-100-FA-XA1 L2006-65-FA-XA1
PID-1 FT
201

50 NB
100 NB Others L2005-80-FA-XA1

N1
N4 N5 L2003-80-FA-XA1

N3
•Battery Limit
PI PI
201A SP 201B

WEF1
•Pipe Class Break CR80x65 CR80x65
L2001-100-FA-XA1 L2002-100-FA-XA1
ER100x80 ER100x80
I.1
LI N2 I.1

•Special Notes
201 N6
N7

D
PW PW
WEF1

T-201 P-201 A P-201 B


WEF1

Koncept Learning Center [email protected]


P & I Diagram
Building up Confidence

Code No. Description


Process Water 03T001 Reactant ‘A’ Overhead Tank
40-PW-12-15-XP1
PID-8 PW
03R001A Reactor
From 08P002A/B
03R001AN01 Agitator for Reactor 03R001A
50NB 50NB

Reactant ‘A’
N1 N5 100-FA-03-09-
N4
N8 N6 XA1 PID-1 FA
50NB To 01T001

25-FA-03-12-XA1
I LSH
03.1 0301

LAH 03T001
0301
80NB
LI LT N7 N2
EL +19.300M 0301 0301
N3
Reactant ‘A’
LAL 50-FA-03-02-
0301 25NB XA1 PID-4 FA

25-PW-03-08-XP1
Drain To 03R001B/C/D

50-FA-03-05-XA1
FAH
25NB 0301
Drain
FIC 100-FG-03-10-
Waste Gases Notes:
0301 XG1 PID-9 FG
1)

50-FA-03-04-XA1
To 05C001
FAL
0301
CR50X40 2)
M 3)
I FT Cooling Water
03.2 0301 50-CW-03-07-
XC1 PID-7 CW
To 07U001
CR50X40
FY 50NB
15NB
I
80-FA-01-12- I 0301 N2 N7 N6 Vent
CR80X50
XA1 03.3 N1 N4
03.1
TSHH I N5 TE TI
EL + 6.300M XV XV FCV 03.2 0302 0302
0301
0301 0302 0301
N9 CR80X50
Reactant ‘A’ TAH
CR50X25 CR50X25
PID-1 FA 0301
From 01P001A/B 25NB 25NB 25NB TI TE
Drain Drain Drain 0301 0301 LSH I
0302 03.3
50-FB-03-06- 03R001A
80-FA-03-01- 50-FA-03-03- TAL
Reactant ‘B’ XA1 XB1 XA1 LAH
R Description Drn Chkd Appd Dt.
50-FB-02-21- 0301 N10 TW1
PID-2 FB 0302
XB1
80NB
Client : M/s ABC Co.
From 02P001A/B
03R001AN01 N8
LT
0302
LI
0302
Plant : 30 TPD of Product ‘P’
Cooling Water
PID-7 CW
50-CW-10-17-XC1
LAL
Location : Pune (Maharashtra)
N3
From 07P001A/B 25NB
Drain
0302
P & I Drawing
Product Slurry

25NB
100-FP-03-11-
FP1 PID-4 FP
To 04T001
For Reaction System
Rev.
PROJECT DRAWING NUMBER No.

Hose 05001 PID – 05001 – 01 - 101 0

Koncept Learning Center [email protected]

You might also like