4.15.2020 Pebble Mine Project Final Environmental Impact Statement

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Department of Natural Resources

OFFICE OF THE COMMISSIONER


550 West 7th Avenue, Suite 1400
Anchorage, AK 99501-3561
Main: 907.269-8431
Fax: 907-269-8918

April 15, 2020

Colonel Phillip Borders


Alaska District Engineer
U.S. Army Corps of Engineers
P.O. Box 6898
JBER, Alaska 99506-0898

Subject: Pebble Mine Project Final Environmental Impact Statement (FEIS)

I wanted to reach out to you and your team to assure you that the State of Alaska remains committed to
assisting the U.S. Army Corps of Engineers (USACE) with completing the Pebble Mine Project Final
Environmental Impact Statement (FEIS).

As you are aware, the State of Alaska, led by the Department of Natural Resources (DNR), has engaged
throughout the National Environmental Policy Act (NEPA) review process for the proposed Pebble
Mine Project. We appreciate the level of effort and amount of resources the USACE has brought to this
NEPA review, especially over the past two months while Alaska and the nation have responded to
COVID-19.

We strongly encourage you to adhere to your defined NEPA schedule. With economic impacts felt at
the federal, state, and local levels from COVID-19 and the current oil prices, we should be doing
everything in our authority and ability to keep projects of statewide importance moving forward.

The proposed Pebble Mine Project is important to Alaskans, as it will provide jobs, infrastructure, and
revenues critical for local, regional, and statewide economies that are being significantly impacted by
COVID-19. Keeping the Pebble Mine FEIS, Record of Decision, and associated required consultations,
on their defined timelines will enhance the applicant’s ability to initiate the state permitting process
sooner.

Considering the USACE has completed the required public commenting periods and held several
technical meetings with cooperating agencies for the Pebble Mine Project, we believe the USACE has
acquired and analyzed ample information on which to base its Record of Decision.

We recognize that everyone is adjusting their daily lives as we all learn more about COVID-19. At DNR
we have also had to adjust our business processes during the current preparedness and response period.
For example, we continue to have success using a variety of telecommunication tools and video
conferencing software that allows us to interact and collaborate even in this time of “social distancing.”
We have used this method to communicate with the public and our own partners throughout government
and the private sector. We greatly appreciate the USACE’s use of similar technologies to continue
effective engagements with cooperating agencies and required consultations.
April 15, 2020
Page 2 of 2

I would like to reiterate that it is precisely due to our current situation why it is imperative for us to stay
on task and on schedule, perhaps now more than ever. When we make it through this pandemic, we will
need to be prepared to reenergize our economy, job force, and revenue streams. Keeping the Pebble
Mine Project on time will be a huge step in that direction, benefitting our statewide economy. As a
Cooperating Agency assisting the USACE with the FEIS, we look forward to continuing to work with
you towards a timely completion.

Sincerely,

Corri Feige, Commissioner


Department of Natural Resources
Office of the Commissioner

Cc: David Hobbie, USACE Regulatory Chief, [email protected]


Jason Brune, Commissioner, Department of Environmental Conservation
Doug Vincent-Lang, Commissioner, Department of Fish and Game

You might also like