HANA PS T-Codes

CNMASSSTATUS allows mass changing of project/WBS statuses. CNMASSCREATE facilitates bulk creation of operative projects from Excel or by copying existing projects, but is not applicable to Pratham's processes. CNSETTLRULE provides a report listing settlement rules in projects/WBS/networks, which will be useful for Pratham's settlement processes covered in system integration testing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
687 views17 pages

HANA PS T-Codes

CNMASSSTATUS allows mass changing of project/WBS statuses. CNMASSCREATE facilitates bulk creation of operative projects from Excel or by copying existing projects, but is not applicable to Pratham's processes. CNSETTLRULE provides a report listing settlement rules in projects/WBS/networks, which will be useful for Pratham's settlement processes covered in system integration testing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

HANA T Code for PS

Sno HANA T Code Description

1 CNMASSSTATUS Mass status change

2 CNMASSCREATE Mass Creation of


project

3 CNSETTLRULE Overview of Project


Settlement Rules
HANA T Code for PS

T Code used for Applicable for the


processes mapped at
Pratham ?(Yes/No)

To mass change the status of many Project/WBS YES

Useful mainly in Cutover stage create Operative No


projects from Excel or Copy from Existing Projects

Report to See list of Settlement rules in the YES


Project/WBS/Network
Remarks            

Used to change the status in mass


Given training to CTM
Projects are less and it will be
created by copying the Standard
Project Definition

Since Settlement is Covered in SIT.


CTM will be aware of this report
during SIT.
Initial Screen for Mass status change
1 Input the project or WBS element

2 Select the status profile in case of user status


3 Select the System status or user status

4 Execute
5 Transaction will be executed and messages will be displayed accordingly
Upload operative project from
Intial Screen to input Project/WBS
Select the parameters required to be listed

Execute and report is shown