Cost Estimation

The document provides a direct cost estimation for a project including labour pay for 3 individuals and hardware and software costs totaling 152,000 PKR. An indirect cost estimation includes labour facilities costs, contingency costs totaling 80,000 PKR. The overall total cost estimation for the project is 232,000 PKR.

Uploaded by

Wasiq Karim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

Cost Estimation

The document provides a direct cost estimation for a project including labour pay for 3 individuals and hardware and software costs totaling 152,000 PKR. An indirect cost estimation includes labour facilities costs, contingency costs totaling 80,000 PKR. The overall total cost estimation for the project is 232,000 PKR.

Uploaded by

Wasiq Karim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Direct Cost Estimation

Labour Pay

Syed Moiez Hussain 30000 PKR

Faiza Azhar 30000 PKR

Zehra Ali 30000 PKR

Hardware Cost

HP (EliteBook 850 G1) 90000 PKR

Software Cost

Licensed Microsoft Visual Studio Professional 2015 25000 PKR

AWS Cloud EC2 Instance 7000 PKR (per month)

Indirect Cost Estimation


Labour Facilities 40000 PKR

Contingency Cost 40000 PKR

Over all Cost Estimation


Direct Cost Estimation (Total) 152000 PKR

Indirect Cost Estimation (Total) 80000 PKR

Total Cost Estimation 232000 PKR