0% found this document useful (0 votes)
84 views8 pages

Plagiarism Checker X Originality Report: Similarity Found: 3%

The document provides a summary of a project report for developing a new website for ColorQo. It outlines the project goals, methodology, resources, costs, schedule, risks, requirements, testing, and deployment. The project was completed over 2.5 months using an agile methodology. Testing showed that the top sold products were automatically recommended upon visiting the website as expected.

Uploaded by

Bicycle Thief
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views8 pages

Plagiarism Checker X Originality Report: Similarity Found: 3%

The document provides a summary of a project report for developing a new website for ColorQo. It outlines the project goals, methodology, resources, costs, schedule, risks, requirements, testing, and deployment. The project was completed over 2.5 months using an agile methodology. Testing showed that the top sold products were automatically recommended upon visiting the website as expected.

Uploaded by

Bicycle Thief
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Plagiarism Checker X Originality Report

Similarity Found: 3%

Date: Friday, April 19, 2019


Statistics: 68 words Plagiarized / 2281 Total words
Remarks: Low Plagiarism Detected - Your Document needs Optional Improvement.
-------------------------------------------------------------------------------------------

Department of Bachelor of Business Administration Report On Developing a New


Website Submitted To: Imran Ahmed Kabir
Lecturer Submitted By: Name _ID _ _Ramidul Islam _111 161 007 _ _Ramim Hasan _111
161 060 _ _Md. Mydul Islam _111 161 273 _ _Abul Kashem _111 161 352 _ _Adnan
Mahmud _111 161 369 _ _ Date of Submission: - 20 April 2019 Table of Contents
Executive Summary 4 Introduction 5 Background problems 5 Project Goals and Value to
Stakeholder 6 Scope definition 7 Work breakdown structure for following project is
given below: 8 METHODOLOGY 9 Resource Management: 9 Needed resources for the
project: 9 Cost of the resources needed: 10 Schedule/time management: 11 Risk
Management: 11 Client Approval for Software Process 12 File: 12 Requirement 13 Top
Most Sold Products 13 Functional requirements 13 Requirements
Confirmation/Stakeholder sign-off 14 Testing and Development 15 From1: 15 Form 2:
16 Form 3: 17 From 4: 18 Client MOM with Feedback: 19 Deployment: Deployment
Sign-off 20 Deployment Preparation: 20 Sign-off: Approval or Rejection 20 RESULTS 21
Final Delivery 21 Conclusion 22 References: 23 Executive Summary Apptota Consultancy
is a web development consultancy firm which provides all kind of solutions for website
and help them in inserting new tools which will make their website to develop easily.

ColorQo is a client for Apptota Consultancy seeking help for build out their website. The
scheme for the project shown below is how Apptota Consultancy assist ColorQo to
insert new shape from designing and make the process easier by creating a new website
for them. This project was covered in span 2.5 months.

The Apptota Consultancy team was working closely with client ColorQo and
implementing the project thoroughly, making sure there will be no mistakes and
complains. This project is very fundamental in learning aspect as it covers the whole
project life cycle on how exactly consulting web development firms. The project covers
from project purchasing, execution and delivery system.

The methodology that was applied is agile method which is the most effective and
gainful web development life cycle process. Introduction Background problems ColorQo
is currently using web based approach for new website. The web based system is the
most digital and productive way of running a business.

In last few years, the noticeable fact is ColorQo has grown and still growing with
increasing amount of audience. As more requirement is happening, the system with
ColorQo is growing along. The web based system is becoming more difficult to handle,
with increasing new demand issues which are also growing.

The problems of old design have been faced by ColorQo. The ColorQo is in dire need of
going digital. The ColorQo has hired Apptota Consultancy to give constructive solution
for their website. Apptota Consultancy has come up with providing an automated new
design process.

Apptota Consultancy will assist ColorQo to implement and design the website in digital
format. Apptota Consultancy will also implement website customization as per their
client’s requirement and then design and developed the site. The automated process
will help them go timely and be systematized in every manner.

Project Goals and Value to Stakeholder


This project will include following activities: Easily Access Convert all systems into
digital format. Automate the site for working promptly. Design the template of all tools
separately. Identify the orders individually. Result With Project Implementation Current
State of Business Result Without Project Implementation The changes of the process
above will be highly beneficial for clients in making the new web process easy and
smoother. Scope definition The scope for the project was defined through
comprehensive requirements search process.

First, a thorough analysis was executed on the company's website current process and
forms. From this information, Apptota Consultancy has developed a team to develop the
project requirements documentation. The project description and deliverables were
developed based on the requirements of web design process and input from subject
matter experts present at Apptota Consultancy in domain like website consulting,
website developing and testing and business analyst.
This project includes identifying the website design and programming and testing of
new forms as expected requirements from ColorQo. The project’s deliverables include
new digital and new website process that was formed with the flexibility to modify and
spread the site as necessary in future. The project will only be accepted once the new
forms have been fully inserted and tested by the company and have been shown to be
compatible with the company’s current process.

Work breakdown structure for following project is given below: / METHODOLOGY


Resource Management: Needed resources for the project: There are so many different
web-hosting site available in the market today. Each of them has different types of pros
and cons. According to our project, we needed to choose more suitable web-hosting
site for our client. Which will help us generating the website as per our client’s demands.

We will ask the clients about their opinion in how they want the website to be created
and what types of information they want to put in. Some of the automated web-hosting
sites that are available online are: LOGO _NAME _BEST FOR _FREE FOR _PLAN PRICE _ _/
The recommended web-hosting site are: Weebly, Wix and Woo Commerce. Each of the
site has different types of features that are useful.

The other resources for the projects are the employees such as: The project manager,
project lead, business analyst, developer and testers. Cost of the resources needed:
These are the 3-selected web-hosting site by our consultancy. We will use the site based
on our client’s preference and propose them an estimated yearly cost.

Here is the monthly cost of the chosen web-hosting sites by our consultancy: / The
estimated yearly cost for Weebly is (950*12) = 11400tk, for Wix the yearly estimated cost
would be (1000*12) which is 12000tk and the estimated yearly cost for Woo Commerce
would be (1450*12) which is 17400tk. Our client will check the features of the
web-hosting site and the pricing and they will tell us on which site they need their forms
to be made.

Office expenses as well as miscellaneous expenses would be 22500 per cycle. Total
expenses based on 3 web-hosting site packages on 2-month cycle would be:
Schedule/time management: Time management system comprises to point out the
specific tasks/activities that project team members and stakeholders must perform to
produce the product deliverable.

It needs to be recognized and record the activity maintaining a sequence. It includes the
assessment of work periods that are needed to complete individual activities. It also
involves controlling and managing changes to project schedule. The established
baseline is of two weeks of the project and then monitor progress against baseline on
weekly basis.

Project Schedule is updated with current information and not more than two business
days. Milestones: _ Risk Management: This initial risk assessment does not replace the
full risk assessment organized during the planning phase and documented within the
project plan—both the activities that come after the project charter is established. This is
where risks were identified at the beginning of a project.

Decide how important they are and indicate the plan to lessen the risks. Identify and
explain the risks involved in the project in the table below the key strategic. For each
risk, list the level of both impact and the degree of probability (high, medium, low). This
tells the reader how notable each risk is. Identify the possible reduction of actions
needed during the project to lessen the impact or lower the probability of the risk
involved, and assign the person or team responsible for undertaking.

_ Client Approval for Software Process / File: _ Requirement In the table below, the
requirement numbering has a scheme - Business Requirement _Area _Deliverables
_Status _ _01 – Home Page of ColorQo _System analysis _Home Page of ColorQo_01_1.1
_Accepted _ _ _ _Home page of ColorQo 01_1.2 Top Most Sold Products _Accepted _ _ _
_Home page-01_1.3 Different types of product _ _ _ _ _ Product and descriptions 01_1.4

_Accepted _ _ Functional requirements In the table below, the requirement numbering


has a scheme - Function _Req _Requirement _Comments _SME Reviewed / Approved _
_01_1.1 Light Collection 01-1.1.2 Delivery Process 01-1.1.3 _1.1.1-Led collection _Price,
Order _Accepted _Approved on March 9th 2019 _ _ _01_1.1Delivery system _1.1.2

_Places, System _Accepted _ _ _ Requirements Confirmation/Stakeholder sign-off Include


documentation of the approval or confirmation of the requirements here. For example:
Meeting Date _Attendees (name and role) _Comments _ _03/03/19 _Ramidul, Web
Developer Mydul, System Analyst Abul kashem (System Analyst) Adnan (IT Analyst)
_Confirmed 01–02-19 ColorQo Page _ _03/04/19 _Ramidul, web Developer Mydul, web
Checker Abul kashem (System Analyst) Ramim (Project Manager/System Software
Analyst) Adnan (IT Analyst/System Software Analyst) _Confirmed 01-02-19 websites
delivery _ _ Testing and Testing and Development Testing 1: From1: ID# _Test Condition
_Expected Result _Procedure _Pass/Fail _ _Top product feature _Visiting Website to
Recommend top sold products _Assuring good product quality recommend in the top
most sold products _The top most sold product automatically will take rank _Passed _ _
Form 2: ID# _Test Condition _Expected Result _Procedure _Pass/Fail _ _Mention the
product transaction process _When customer visit this website, they want to know about
the delivery system _How the customer got their product _Choosing a via on how to
customer got their product _Failed ( If the customer doesn’t choose any process) _ _
Form 3: / ID# _Test Condition _Expected Result _Procedure _Pass/Fail _ _This section
Comparing Products and price level _Knowing the product information with different
price level _Assuring that all the product information given is true/ authentic _During the
visit of this website, it will show related product according to the search result _Passed _
_ From 4: / ID# _Test Condition _Expected Result _Procedure _Pass/Fail _ _Individual
product feature with discount price _Product is displayed attached with details and with
sale price.

It’s essential to increase the percentage of the sale. _To rise the percentage of the sale
_Individual product details information will be helpful to get some idea about the
product quality _Passed _ _ Client MOM with Feedback: Minutes of Meeting ColorQo &
Apptota Consultancy February 17, 2019 Members
Present: Ramim Hasan Ramidul Islam Robin
Md.Mydul Islam Abul Kashem Adnan Mahmud STAKEHOLDER _ ROLE ASSIGNED _
ACTIVITY _ _ Abul Kashem _ Ramim Hasan _ Discussed on groundwork required and how
it can take place before project goes live in ColorQo environment. _ _ Md.Mydul Islam _
Ramidul Islam Robin _ Detailed discussion on necessity and terminate the layout of
certain forms for their sections in the recruitment process.

_ _ Abul Kashem _ Md.Mydul Islam _ Discussed and decided to meet for issues related to
development challenges. _ _ Ramidul Islam Robin _ Adnan Mahmud _ Agreed to issues
timelines for requirement sign off along with development and testing to start
simultaneously. _ _ Md.Mydul Islam _ Ramim HaSan _ Discussed on user acceptance
testing and responsible stakeholders for testing and proposed timeline for it.

_ _ Ramidul Islam Robin _ Ramim HaSan _ Decided on tentative timeline for delivery of
sprint 1 user acceptance testing. _ _ The proposed delivery of Sprint 1 is 19th April, 2019.
Deployment: Deployment Sign-off This document has been used for getting customers
approval in this page. This document can also be used for review to check all the things
that are complete and approval of the projects between ColorQo and Apptota
Consultancy.

Requestor: Name _Title _Team _ _Ramidul Islam _Business Analyst _Products _ _Adnan
Mahmud _Business Analyst _Products _ _Ramim Hasan _Web Developer _Products _ _
Date of request for Sing-off: 18 April 2019 Project Name: Create a Website for ColorQo
Deployment Preparation: The Structure of a website on minimum cost for customers can
access their website easily and make the products to be purchased quickly.

The following listed Activities are: Product Details Product Cost Delivery Cost Customer
Ratings Add Cart Sign-off: Approval or Rejection

Use the chart below to below to document approval or rejection Name and Title
Approver _Decision _Reason for Rejection _ _Nusrat Jahan (Owner) _Approved _N/A _
_RESULTS Final Delivery Going Published Link for the Web Development Project:
https://729865014891430443.weebly.com/ The above is the link where the Website are
being developed and can be put on the ColorQo’s official Page.

Web deployment: We have developed the online form for our client ColorQo and the
Site will be sent to the CEO’s email address and it can be directly printed for the further
records.
https://729865014891430443.weebly.com/?fbclid=IwAR3mMrd4UxbubtaFAXkxGHVR4sC
b8d4wEkA6wLmpXmLREZnFn9cM7yFG4Fo /
Conclusion We are entirely grateful to serve ColorQo and assist them to expand their
business by developing a web-page for them.

In this epoch of digitalization, every business organization makes headway with the
touch of modern facilities and for that to create a web-page is a must. ColorQo reached
out to us and we helped them with the agile methodology and set goals for them. We
took care of every requirements that ColorQo need for their page and also created a
work breakdown structure for the project.

We assigned a team to implement and design the forms. The recommended


web-hosting sites are also given with the cost and we will generate the web-site as per
our customer’s preferences. Time management and Risk management were created to
avoid compensation.

With our help ColorOo managed to develop their delivery process and time
management and this brought them more audience. As ColorQo received a complete
project life circle from Apptota Consultancy, the issues they were facing earlier has
reduced a lot and ColorQo has become more systematic.
References: Square, e. b. (n.d.). Weebly.Com. Luo, L. (2003). MIS developing in the era
of e-business. Journal of Guangdong Industry Technical College, 1.

Chengzeng, Z., Zhifeng, C., Yanzhen, W., & Sizhong, L. (2000). The Analysis and Research
on Web Database Technology [J]. COMPUTER ENGINEERING AND APPLICATIONS, 8.
Conallen, J. (2002). Building Web applications with UML. Addison-Wesley Longman
Publishing Co., Inc.

INTERNET SOURCES:
-------------------------------------------------------------------------------------------
<1% - http://graphics.eiu.com/files/ad_pdfs/Tata_KnowHow_WP.pdf
<1% - https://projectmanager-dip.blogspot.com/
<1% -
https://www.quora.com/What-are-the-pros-and-cons-of-running-a-marketplace-vs-a-p
ure-ecommerce-site
1% - https://www.studyblue.com/notes/note/n/is-425-chapters-5-6/deck/2327112
1% -
https://www.coursehero.com/file/p6fke0n/In-project-time-management-which-of-the-f
ollowing-processes-involve-analyzing/
<1% -
https://docs.google.com/document/d/1GINNoXnZQP_rTESdl5yipz7hF630P-4F7acTEa88
b7Q/edit#!
<1% -
https://www2.cdc.gov/cdcup/library/templates/CDC_UP_Project_Management_Plan_Tem
plate.doc
<1% -
http://csis.pace.edu/~marchese/CS775/Requirements%20Specification%20Template.doc
<1% -
https://www.slideshare.net/JasonWeber24/nacclrequirementsspecificationtemplate
1% - https://dl.acm.org/citation.cfm?id=560225

You might also like