This Gantt chart outlines the timeline for constructing a proposed two-story house located in Cavite, Philippines. It includes tasks such as project approvals, preliminary design, bidding, construction processes like excavation and reinforcement, and finishes from October 2020 through June 2021. The construction process from December 2020 to June 2021 is the longest task, taking approximately 136 days to complete stages like electrical works, tiling, and garden installation. The chart provides a detailed timeline to plan and track progress of the house construction project.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
506 views1 page
Gantt Chart
This Gantt chart outlines the timeline for constructing a proposed two-story house located in Cavite, Philippines. It includes tasks such as project approvals, preliminary design, bidding, construction processes like excavation and reinforcement, and finishes from October 2020 through June 2021. The construction process from December 2020 to June 2021 is the longest task, taking approximately 136 days to complete stages like electrical works, tiling, and garden installation. The chart provides a detailed timeline to plan and track progress of the house construction project.