The report summarizes the results of a cathodic protection survey of the Akhen 6" Condensate Pipeline from KP 0.000 to KP 20.793. Potential measurements were from -1043mV to -1057mV and anode wastage was from 0% to 25%. No cathodic protection anomalies were observed and the pipeline was adequately protected against corrosion. The survey found the pipeline to be in good condition with no recommended repairs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
190 views18 pages

ISES CP Report 2

The report summarizes the results of a cathodic protection survey of the Akhen 6" Condensate Pipeline from KP 0.000 to KP 20.793. Potential measurements were from -1043mV to -1057mV and anode wastage was from 0% to 25%. No cathodic protection anomalies were observed and the pipeline was adequately protected against corrosion. The survey found the pipeline to be in good condition with no recommended repairs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 18

ISIS Technical Services Sdn Bhd

CT-10-07, Subang Square Corporate Tower,


Jln SS15/4G, 47500 Subang Jaya,
Selangor, Malaysia
Tel: +6 03 5635 9500/9850/9750
Fax:
Client: +6 03 5635 9655

Title:
PhPC / Fugro SAE / MCS Oil

Subsea Pipeline, Umbilical and Structure Inspection 2014


Campaign

Cathodic Protection Survey Report

of

Akhen - 6" Condensate Pipeline

Final Report

Document No: W073_14_ITS_RS_AK-PL6_rev0 Total number of pages: 20 inc Title Pages

Client Ref. No: TBA

Authors: Muhammad Farid Bin Mohd. Noor

Workforce: Muhammad Farid Bin Mohd. Noor

Distribution: PhPC / Fugro SAE / MCS Oil

1 15-MAY-14 Final Report MF AA AA


ISSUE DATE Reason for Issue BY CHK APP
Page 3 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report

REVISION STATUS

Page No. Rev No. Date Reason for Revision Authorised


Page 4 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report

CONTENTS

EXECUTIVE SUMMARY...........................................................................................................................................6

1 INTRODUCTION..........................................................................................................................................7
1.1 Location Surveyed...........................................................................................................................7

2 PRESENTATION OF RESULTS..................................................................................................................8
2.1 AKHEN 6” CONDENSATE PIPELINE.............................................................................................8
2.1.1 Location Surveyed................................................................................................................8
2.1.2 Anode Details.......................................................................................................................8
2.1.3 Contact Measurement Table................................................................................................8
2.1.4 Discussion............................................................................................................................9
2.1.5 CP Anomaly Highlights.........................................................................................................9
2.1.6 Conclusions..........................................................................................................................9
2.1.7 Recommendations...............................................................................................................9
2.1.8 Pipeline Charts...................................................................................................................10

3 CALIBRATION LOGS................................................................................................................................14
Page 5 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report

EXECUTIVE SUMMARY

The CP survey of the Akhen 6" Condensate Pipeline was part of the PhPC/Fugro SAE Subsea Pipeline,
Umbilical and Structure Inspection 2014 campaign.

The survey was conducted from the vessel MV Fugro Navigator utilising the Seaeye Panther XT935.

The CP survey was conducted by ISIS Technical Services Sdn. Bhd.

The following offshore pipeline was surveyed to assess the condition of their cathodic protection (CP) system:

Summary of the Results for the Cathodic Protection Survey of Akhen 6” Condensate Pipeline

KP Length
Contact Anode
Pipeline ID Inspected (Km) CP Anomaly
Potential (mV) Wastage (%)
From To
Akhen 6”
Condensate 0.000 20.793 -1043 to -1057 0%-25% None
Pipeline

Overview on Condition of CP systems

The pipeline Akhen 6" Condensate Pipeline was found to be cathodically protected against external corrosion
and the potential measurements recorded were within acceptable levels as described in the Recommended
Practice DNV-RP-B401, October 2010 (Amended April 2011) Standard *.

Section 5.4.2 “For a correctly designed galvanic anode CP system, the protection potential will for the main part of
the design life be in the range - 0.90 to - 1.05 (V). Towards the end of the service life, the potential increases rapidly
towards - 0.80 (V), and eventually to even less negative values, referred to as ‘underprotection’.
The term ‘over-protection’ is only applicable to protection potentials more negative than - 1.15 (V). Such potentials
will not apply for CP by galvanic anodes based on Al or Zn.” *

* Ref Silver/Silver Chloride measuring cell.

No CP anomalies were observed.


Page 6 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
1 INTRODUCTION

This document contains the CP survey report compiled from the data obtained during the Cathodic Protection
Monitoring Survey of the Akhen 6” Condensate Pipeline.

ISIS Technical Services Sdn Bhd was subcontracted by MCS Oil on behalf of PhPC and Fugro SAE to
provide cathodic protection survey equipment and services.

The readings obtained during the survey (but not limited to) include continuous potential and field gradient
measurement, both steel contact measurement on flanges and pipeline anodes.

The readings were obtained using the ISIS digital CPDAS (Cathodic Protection Data Acquisition System).

Contact Cathodic Potential (CP) & field gradient measurements were taken using a twin half cell CP probe.
The information was logged and processed using the computerised CPDAS (Cathodic Protection Data
Acquisition System) developed by ISIS.

The survey was performed in accordance with the guidelines as described in DNV RP B401 "Cathodic
Protection Design".

All calibrations were performed to DNV RP B403 "Monitoring of Cathodic Protection Systems” recommended
practice.

1.1 Location Surveyed

Pipeline Description KP Surveyed

Akhen 6" Condensate Pipeline


0.000 to 20.793
(Akhen Platform to Condensate PLEM)
Page 7 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report

2 PRESENTATION OF RESULTS

2.1 AKHEN 6” CONDENSATE PIPELINE

2.1.1 Location Surveyed

KP Start Total Surveyed


Pipeline Description KP End (km)
(km) (km)

Akhen 6" Condensate Pipeline


0.000 20.793 20.793
(Akhen Platform to Condensate PLEM)

*KP positions & events recorded are based upon raw data received from on-line navigation system.

2.1.2 Anode Details

Net
Length Dia. (I/D) Thickness Year of
Material Type Weight
(cm) (cm) (cm) Installation
(kg)
N/A N/A N/A N/A N/A N/A N/A

2.1.3 Contact Measurement Table

CP FG Depletion
KP Description
(mV) (uV/cm) (%)
20.217 Steel contact on outboard flange. -1057 15 -
20.253 Steel contact on inboard flange. -1057 21 -
20.273 Anode contact -1057 -31 25
20.323 Anode contact -1057 27 <25
20.384 Anode contact -1057 -27 <25
20.433 Anode contact -1057 -9 <25
20.497 Anode contact -1056 -15 <25
20.544 Anode contact -1043 -6 25
20.605 Anode contact -1049 -6 25
20.653 Anode contact -1051 6 <25
20.676 Anode contact -1048 -18 <25

Note* Full anode details were unavailable at the time of writing this report and it was therefore not possible to
calculate anode current output and remaining life of the CP system.
Page 8 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report

2.1.4 Discussion

As can be seen in the contact table in Section 2.1.3, the potential contact values obtained on this surveyed
pipeline were between -1043mV & -1057mV. These values would indicate that the level of cathodic protection is
within the accepted limits as specified in the DNV RP B401 Cathodic Protection Design.

Visually, the wastage estimate for the anodes observed during the survey were considered to be in the 0%-
25% (slight wastage) classification. It should be stressed that visual estimation of anode wastage can be
inaccurate and can often lead to misinterpretation regarding the level of wastage due to oxide coating and silt
or mud on the anode surface obscuring the observers view.

Due to the burial condition of the pipeline from KP 0.000 to KP 20.200, no CP contact measurement could be
obtained along the surveyed section. It should be stressed that the accuracy of the continuous profile can only
be confirmed in the vicinity of the contact location.

It is important to note that the accuracy of the “cell to cell” CP Survey methodology is dependent upon the
ability to take regular calibration contacts along the pipeline route and significant errors may be introduced if
this cannot be done.

Nevertheless, the potential and field gradient activity observed during the survey would indicate that the
pipeline is well protected against external corrosion.

2.1.5 CP Anomaly Highlights

No CP anomalies were observed or detected.

2.1.6 Conclusions

Based on the results from the survey, the following conclusions can be drawn:

 The surveyed pipeline was protected against external corrosion with potentials that were within the
limits as specified in DNV RP B401 Cathodic Protection Design.
 Estimated depletions for all the surveyed anodes were considered to be less than 25%.
 No CP anomalies were observed or detected.

2.1.7 Recommendations

Although the cathodic protection system for Akhen 6" Condensate Pipeline was found to be in good condition
and providing adequate protection against external corrosion, the pipeline should continue to be surveyed as
part of a regular planned inspection programme to ensure that the condition of the cathodic protection system
remains satisfactory.

In the future, if the survey conditions change and pipeline sections become exposed, more calibration contact
measurements should be taken (where possible) on the pipeline. This is to confirm the accuracy of the
potential profile and to ascertain the condition of the cathodic protection system.
Page 9 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report

2.1.8 Pipeline Charts


Continuous CP Profile CP in mV v KP
Continuous FG Profile FG in microvolts/cm v KP

-987 Steel Contact Value (mV)


-1025 Anode Contact Value (mV)
Page 10 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
Page 11 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
Page 12 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
Page 13 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
3 CALIBRATION LOGS
Page 14 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
Page 15 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
Page 16 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
Page 17 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
Page 18 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014
Akhen - 6" Condensate Pipeline
Final Report
Page 19 of 19

PhPC/Fugro SAE/MCS Oil


Subsea Pipeline, Umbilical and Structure Inspection Campaign 15th May 2014