0% found this document useful (0 votes)
22 views2 pages

Uniqu

Uploaded by

bilisuma seboka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views2 pages

Uniqu

Uploaded by

bilisuma seboka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

roject Management practices from other industries are often adopted in construction projects with

varying success! Why? Because construction is different. Understanding these differences will
allow us to make better management decisions in the systems that we do adopt.

1. Instead of one corporation, construction involves a multitude of contractors and subcontractors


–from architects, engineers, contractors, suppliers, and manufacturers; coordinating their efforts
in multiple locations, with separate offices for each company, and each sharing the construction
site.

2. Construction projects are one of a kind. This is not an assembly line event.

When prefab is used, there are always concessions in design and efficiency. For example, a
kitchen custom constructed can make use of all the space that is available. When pieced together
using prefab cabinets, there will be empty spaces that are inaccessible and filled with spacers, and
clearances to the ceiling and floor, etc. Kitchens with 30-40% of the space used by space fillers, or
unused are not unusual, just unfortunate.

Each site is unique. Consequently, there is a trade-off between efficient use of space and pre-fab
efficiencies.

Relationships in the supply chains are project-based and short-term (although often repeated).
Supply chains are not permanent and given to tinkering as the circumstances change.

3. The type of contract and relationship will change.

Design – Bid – Build (traditional)


Design-build
Construction Manager
3P (Public-Private Partnerships) – delayed payment, part ownership
Each of these types of contracts reassigns responsibilities and roles between companies.

4. Considerations of sustainability including sustainability of:

Building envelope, including thermal performance requirements for walls, roofs, and windows;
Lighting system, including daylighting, and lamps and luminaire performance requirements;
HVAC system, including energy performance of chillers and air distribution systems;
Electrical system; and
Water heating and pumping systems, including requirements for solar hot-water systems.
Sustainability considerations modify the form/function balance and add a third dimension to the
design, materials sourcing, and construction process.

5. Life cycle operation and maintenance management are also considerations.


In comparison to manufacturing, the variability of the business relationships is extreme. In
manufacturing, the key personnel are the employees of one or a few corporations. The supply
chain is virtually permanent and defined. The product is defined and not designed each time. The
contractual relationship is consistent and easily classified: designer, manufacturer, distributor,
supplier, and customer. The relationships are longstanding. Designer and manufacturer are often
located in one physical location and employees of one corporation. Sustainability considerations
are not often enforced. Warranties are simpler and based on branding.

The expense of the project/product and the significance of the construction project in people’s
lives are overarching. Few products have as much significance to the quality of day to day lives. A
piece of furniture, video game or phone will not impact a person’s life as roads that they drive on
or the parks that they use. Arguably, education systems will have extreme impacts on a person’s
life: colleges, universities, and even public schools. These will also be impacted by the
construction of the facility. No computer, cell phone, clothing article, or movie will impact a
person’s life as much as the house that they live in, the arena they play in, or the hospital that
they are treated in. The magnitude of the impact of construction projects dwarfs those of
individual manufacturing projects.

Subsequently, construction costs are orders of magnitude larger, expectations for performance are
higher and desire for customization flourishes. Construction projects have more artistry and less
mass production than most spectators realize.