0% found this document useful (0 votes)
45 views2 pages

Centennial-Progress 03.04.2020

This document provides a progress update on construction at Centennial. It outlines the current status of each wing and floor, with A-I representing different wings and the ground floor through 4th floor listed vertically. For most wings, the 3rd and 4th floors have RCC slabs poured while lower floors are at the blockwork stage or occupied by tenants on the ground floor. Wing I's highest floor is still at the RCC slab stage.

Uploaded by

yash shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views2 pages

Centennial-Progress 03.04.2020

This document provides a progress update on construction at Centennial. It outlines the current status of each wing and floor, with A-I representing different wings and the ground floor through 4th floor listed vertically. For most wings, the 3rd and 4th floors have RCC slabs poured while lower floors are at the blockwork stage or occupied by tenants on the ground floor. Wing I's highest floor is still at the RCC slab stage.

Uploaded by

yash shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

03.04.

2020
Centennial- Progress update

Wing -> A B C D E F G H
TERRACE RCC slab RCC slab
4TH blockwork RCC slab RCC slab RCC slab RCC slab RCC slab na na
3RD blockwork blockwork blockwork blockwork blockwork RCC slab RCC slab
2ND
1ST tennants tennants
GROUND tennants

RCC slab
blockwork
tennants
03.04.2020

RCC slab