Vapi - New Chemcial Structure - Ground Floor Loading Details: (A) (B) (A+B)

The document provides loading details for various grids on the ground and first floors of a new chemical structure. It lists the equipment located in each grid area along with their individual loads in kilograms. It also specifies the total area and load-bearing area of each grid, and calculates the total loading per square meter for each grid based on its equipment loads and the standard load of 2 tons per square meter for the remaining area. The grids contain various equipment like reactors, centrifuges, dryers and lifts. The total loading ranges from 1000 to 2750 kg/sqm across the different grids depending on the equipment installed and their individual loads.

Uploaded by

yash shah
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views

Vapi - New Chemcial Structure - Ground Floor Loading Details: (A) (B) (A+B)

The document provides loading details for various grids on the ground and first floors of a new chemical structure. It lists the equipment located in each grid area along with their individual loads in kilograms. It also specifies the total area and load-bearing area of each grid, and calculates the total loading per square meter for each grid based on its equipment loads and the standard load of 2 tons per square meter for the remaining area. The grids contain various equipment like reactors, centrifuges, dryers and lifts. The total loading ranges from 1000 to 2750 kg/sqm across the different grids depending on the equipment installed and their individual loads.

Uploaded by

yash shah
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

VAPI_NEW CHEMCIAL STRUCTURE_GROUND FLOOR LOADING DETAILS

Loading on Rest
Load of Equipment in
Sr. Total Grid Equipment Foot Rest of the Grid of the Area(KG) Total Loading Loading
Grid Equipment in the Grid (KG) per sq.m
No. Area (Sq.m) Print Area(Sq.m) Area(Sq.m) 2T/Sq.m (A+B)
(A) (B)
of Grid

1 Grid A-B & Grid 1-2 - 0 5.26 0.00 5.26 10520 10520 2000

2 Grid A-B & Grid 2-3 Circular Staircase 0 19.94 0.00 19.94 39880 39880 2000

3 Grid A-B & Grid 3-4 4KL Rec. Methanol 4500 18.51 3.40 11.71 23423 33923 1833
4KL Rec. Pyridine 6000 3.40
Total 10500 6.80

4 Grid A-B & Grid 4-5 - 0 18.51 0.00 18.51 37020 37020 2000

5 Grid A-B & Grid 5-6 - 0 18.51 0.00 18.51 37020 37020 2000

6 Grid A-B & Grid 6-7 - 0 18.94 0.00 18.94 37880 37880 2000

7 Grid B-C & Grid 1-2 - 0 10.05 0.00 10.05 20100 20100 2000

8 Grid B-C & Grid 2-3 ANFD 12000 38.07 4.15 33.92 67840 79840 2097

9 Grid B-C & Grid 3-4 ANFD 12000 35.35 4.15 31.20 62400 74400 2105

10 Grid B-C & Grid 4-5 BBIS Centrifuge 1200 35.35 1.80 33.55 67100 68300 1932

11 Grid B-C & Grid 5-6 - 0 35.35 0.00 35.35 70700 70700 2000

12 Grid B-C & Grid 6-7 Dryer 1200 36.16 2.40 32.98 65960 68360 1890
Autoclave 1200 0.78
TOTAL 2400 3.18

13 Grid C-D & Grid 1-2 - 0 7.85 0.00 7.85 15700 15700 2000

14 Grid C-D & Grid 2-3 - 0 29.74 0.00 29.74 59480 59480 2000

15 Grid C-D & Grid 3-4 - 0 27.61 0.00 27.61 55220 55220 2000

16 Grid C-D & Grid 4-5 - 0 27.61 0.00 27.61 55220 55220 2000

17 Grid C-D & Grid 5-6 - 0 27.61 0.00 27.61 55220 55220 2000

18 Grid C-D & Grid 6-7 - 0 28.25 0.00 28.25 56500 56500 2000

19 Grid D-E & Grid 1-2 - 0 10.97 0.00 10.97 21940 21940 2000

20 Grid D-E & Grid 2-3 Lift (3.5m x 3.5m) 0 41.57 12.25 23.11 46223 47423 1141
P. Lift (2.1m x 2.1m) 0 4.41
ATPN Centrifuge 1200 1.80
Total 1200 18.46

21 Grid D-E & Grid 3-4 - 0 38.6 0.00 38.60 77200 77200 2000

22 Grid D-E & Grid 4-5 BBIS/GS77 Centrifuge 1200 38.6 1.80 36.80 73600 74800 1938

23 Grid D-E & Grid 5-6 - 0 38.6 0.00 38.60 77200 77200 2000

24 Grid D-E & Grid 6-7 MDS Centrifuge 1200 39.49 1.80 35.89 71780 74180 1878
DYE Centrifuge 1200 1.80
Total 2400 3.60

25 Grid E-F & Grid 1-2 - 0 4.33 0.00 4.33 8660 8660 2000

26 Grid E-F & Grid 2-3 - 0 16.44 0.00 16.44 32880 32880 2000

27 Grid E-F & Grid 3-4 9KL GR-40 12000 15.26 3.14 8.98 17963 41963 2750
9KL GR-40 12000 3.14
Total 24000 6.28

28 Grid E-F & Grid 4-5 - 0 15.26 0.00 15.26 30520 30520 2000

29 Grid E-F & Grid 5-6 - 0 15.26 0.00 15.26 30520 30520 2000

30 Grid E-F & Grid 6-7 - 0 15.61 0.00 15.61 31220 31220 2000
VAPI_NEW CHEMCIAL STRUCTURE_FIRST FLOOR LOADING DETAILS
Loading on Rest of
Load of Equipment in Loading
Sr. Total Grid Equipment Foot Rest of the the Area in (Kg) Total Loading
Grid Equipment in the Grid (KG) per sq.m
No. Area (Sq.m) Print Area(Sq.m) Area(Sq.m) 2T/Sq.m (A+B)
(A) (B)
of Grid

1 Grid A-B & Grid 1-2 - 0 5.27 5.27 10,539 10539 2000

2 Grid A-B & Grid 2-3 - 0 19.95 19.95 39,900 39900 2000

3 Grid A-B & Grid 3-4 - 0 18.52 18.52 37,038 37038 2000

4 Grid A-B & Grid 4-5 - 0 18.52 18.52 37,038 37038 2000

5 Grid A-B & Grid 5-6 - 0 18.52 18.52 37,038 37038 2000

6 Grid A-B & Grid 6-7 - 0 18.95 18.95 37,899 37899 2000

7 Grid B-C & Grid 1-2 - 0 10.06 10.06 20,119 20119 2000

8 Grid B-C & Grid 2-3 - 0 38.08 38.08 76,159 76159 2000

9 Grid B-C & Grid 3-4 PPSOH 9000 35.36 4.84 29.52 59,039 72539 2051
Receiver 4500 1.00
Total 13500 5.84

10 Grid B-C & Grid 4-5 BBIS-2 9000 35.36 4.84 24.18 48,359 75359 2131
DEP+L-153 9000 4.84
Receiver 4500 1.00
Receiver 4500 0.50
Total 27000 11.18

11 Grid B-C & Grid 5-6 Zinco/Mix 3900 35.36 2.01 28.73 57,453 74303 2101
Spare Tank 8450 3.46
Receiver 2000 0.38
Spare Receiver 2500 0.78
Total 16850 6.63

12 Grid B-C & Grid 6-7 Spare Tank 8450 38.08 3.46 29.60 59,199 81099 2130
Spare Tank 8450 3.46
Spare Receiver 2500 0.78
Spare Receiver 2500 0.78
Total 21900 8.48

13 Grid C-D & Grid 1-2 - 0 7.85 7.85 15,700 15700 2000

14 Grid C-D & Grid 2-3 - 0 29.74 29.74 59,480 59480 2000

15 Grid C-D & Grid 3-4 Cutout (No Slab) 0 0 0.00 0 0 0

16 Grid C-D & Grid 4-5 Cutout (No Slab) 0 0 0.00 0 0 0

17 Grid C-D & Grid 5-6 Cutout (No Slab) 0 0 0.00 0 0 0

18 Grid C-D & Grid 6-7 Partial Cutout 0 7.72 7.72 15,440 15440 2000

19 Grid D-E & Grid 1-2 - 0 10.98 10.98 21,958 21958 2000

20 Grid D-E & Grid 2-3 ATPN MIX 8450 41.58 4.00 19.92 39,842 50792 1222
Receiver 2500 1.00
Lift (3.5m x3.5m) 0 12.25
P. Lift (2.1m x 2.1m) 0 4.41
Total 10950 21.66

21 Grid D-E & Grid 3-4 GS 77 HVD 3800 38.61 2.56 30.49 60,979 78179 2025
MEOH REC. 3800 2.56
Receiver 3200 1.00
Receiver 3200 1.00
Receiver 3200 1.00
Total 17200 8.12

22 Grid D-E & Grid 4-5 BBIS- 1 8450 38.08 4.00 28.08 56,159 78059 2050
G4-40-2 8450 4.00
Receiver 2500 1.00
Receiver 2500 1.00
Total 21900 10.00

23 Grid D-E & Grid 5-6 GR-40-1 16680 38.61 5.76 25.82 51,640 82270 2131
RP-174 8450 4.00
Receiver 3000 2.25
Receiver 2500 0.78
Total 30630 12.79

24 Grid D-E & Grid 6-7 MDS 5655 39.50 2.89 30.61 61,219 80324 2034
DYES 8450 4.00
Receiver 2500 1.00
Receiver 2500 1.00
Total 19105 8.89

25 Grid E-F & Grid 1-2 - 0 4.34 0 4.34 8,679 8679 2000

26 Grid E-F & Grid 2-3 - 0 16.45 0 16.45 32,899 32899 2000

27 Grid E-F & Grid 3-4 - 0 15.27 0 15.27 30,539 30539 2000

28 Grid E-F & Grid 4-5 - 0 15.27 0 15.27 30,539 30539 2000

29 Grid E-F & Grid 5-6 - 0 15.27 0 15.27 30,539 30539 2000

30 Grid E-F & Grid 6-7 - 0 15.62 0 15.62 31,239 31239 2000
VAPI_NEW CHEMCIAL STRUCTURE_MEZZANINE FLOOR LOADING DETAILS
Loading on Rest of
Load of Equipment in the Area (kg) Loading
Sr. Total Grid Equipment Foot Rest of the Total Loading
Grid Equipment in the Grid (KG) 2T/Sq.m per sq.m
No.
(A)
Area (Sq.m) Print Area(Sq.m) Area(Sq.m) (A+B) of Grid
(B)
1 Grid A-B & Grid 2-3 0 19.95 19.95 39900 39900 2000

2 Grid A-B & Grid 3-4 Toluene 1000 18.52 0.56 17.96 35920 36920 1994

3 Grid A-B & Grid 4-5 Methanol 1700 18.52 0.78 16.61 33220 38439 2076
NaOH 3519 1.13
TOTAL 5219 1.91

4 Grid A-B & Grid 5-6 Benzyl Chl 1200 18.52 0.63 15.96 31921 37521 2026
4m2 1000 0.37
Acetone 1700 0.78
Benzaldehyde 1700 0.78
TOTAL 5600 2.56

5 Grid A-B & Grid 6-7 18.95 18.95 37899 37899 2000

6 Grid E-F & Grid 1-2 0 4.34 4.34 8679 8679 2000

7 Grid E-F & Grid 2-3 EPC 1200 16.45 0.56 15.19 30381 33731 2051
8m2 2150 0.70
TOTAL 3350 1.26

8 Grid E-F & Grid 3-4 NAOH 3519 15.27 1.13 12.82 25641 31954 2093
Cumene 2794 1.32
TOTAL 6313 2.45

9 Grid E-F & Grid 4-5 8m2 2150 15.27 0.70 13.87 27741 32041 2098
8m2 2150 0.70
TOTAL 4300 1.40

10 Grid E-F & Grid 5-6 16m2 3850 15.27 0.95 12.49 24981 35981 2356
Sulphuric Acid 5000 1.13
8m2 2150 0.70
TOTAL 11000 2.78

11 Grid E-F & Grid 6-7 BIS-2 Chloro 834 15.62 0.56 13.80 27603 31787 2035
6m2 1200 0.56
8m2 2150 0.70
TOTAL 4184 1.82
VAPI_NEW CHEMCIAL STRUCTURE_SECOND FLOOR LOADING DETAILS
Loading on Rest of
Load of RACKS in Total Loading
Sr. Total Grid RACKS Foot Print Rest of the the Area(Kg)
Grid RACKS in the Grid (KG) Loading per sq.m
No. Area (Sq.m) Area(Sq.m) Area(Sq.m) 2T/Sq.m
(A) (B) (A+B) of Grid

1 Grid A-C & Grid 1-2 0 15.33 15.33 30660 30660 2000

2 Grid A-C & Grid 2-3 2 Racks 15000 58.03 6.47 51.56 103120 118120 2035
Spiral Staircase

3 Grid A-C & Grid 3-4 4 Racks 30000 54.85 12.94 41.91 83820 113820 2075

4 Grid A-C & Grid 4-5 4 Racks 30000 54.85 12.94 41.91 83820 113820 2075

5 Grid A-C & Grid 5-6 4 Racks 30000 54.85 12.94 41.91 83820 113820 2075

6 Grid A-C & Grid 6-7 3 Racks 22500 56.12 9.7 46.42 92840 115340 2055

7 Grid C-D & Grid 1-2 0 7.85 7.85 15700 15700 2000

8 Grid C-D & Grid 2-3 0 29.74 29.74 59480 59480 2000

9 Grid C-D & Grid 3-4 Cutout (No Slab) 0 0 0 0 0 0

10 Grid C-D & Grid 4-5 Cutout (No Slab) 0 0 0 0 0 0

11 Grid C-D & Grid 5-6 Cutout (No Slab) 0 0 0 0 0 0

12.a Grid C-D & Grid 6-7 Partial Cutout 7.72 7.72 15440 15440 2000

12.b Grid C-D & Grid 6-7 OHT above with 98000 27.62 0 0 98000 3548
Over Head Tank 40KL capacity in
this Grid
This load includes
the dead load of
concrete as well as
the water load

13 Grid D-F & Grid 1-2 0 15.33 15.33 30660 30660 2000

14 Grid D-F & Grid 2-3 Lift (3.5 x 3.5m) 0 58.03 12.25 41.37 82740 82740 1426
P. Lift (2.1 x 2.1m) 0 4.41
TOTAL 0 16.66

15 Grid D-F & Grid 3-4 Partial Cutout 0 23.75 23.75 47500 47500 2000

16 Grid D-F & Grid 4-5 4 Racks 30000 54.85 12.94 41.91 83820 113820 2075

17 Grid D-F & Grid 5-6 4 Racks 30000 54.85 12.94 41.91 83820 113820 2075

18 Grid D-F & Grid 6-7 3 Racks 30000 56.12 9.7 46.42 92840 122840 2189
VAPI_NEW CHEMCIAL STRUCTURE_TERRACE FLOOR LOADING DETAILS
Load of Loading on Rest of
Total Loading
Sr. Equipments in Total Grid Equipments Foot Rest of the the Area(Kg)
Grid Equipments in the Grid (KG) 2T/Sq.m Loading per sq.m
No. Area (Sq.m) Print Area(Sq.m) Area(Sq.m)
(A+B) of Grid
(A) (B)
1 Grid D-F & Grid 1-2 15.33 15.33 30660 30660 2000

2 Grid D-F & Grid 2-3 Lift (3.5 x 3.5m) 58.03 12.25 36.46 72920 74920 1291
P. Lift (2.1 x 2.1m) 4.41
Brine Plant 2000 4.91
TOTAL 2000 21.57

3 Grid D-F & Grid 3-4 Scrubber - 1 3500 54.85 4 37.89 75780 82780 1509
Cooling Tower 2 (200tr) 3500 12.96
TOTAL 7000 16.96

4 Grid D-F & Grid 4-5 Cooling Tower 1 (75 tr) 1500 54.85 4.84 37.26 74520 83720 1526
Scrubber - 2 3500 4
Vacuum Ejector - 1 4200 8.75
TOTAL 9200 17.59

5 Grid D-F & Grid 5-6 Vacuum Ejector- 2 4200 54.85 8.75 42.1 84200 90900 1657
Scrubber Provision 2500 4
TOTAL 6700 12.75

6 Grid D-F & Grid 6-7 Chill Water Plant 2250 56.12 2.81 53.31 106620 108870 1940